01 - Revised Statement of Work.docx

DOCX document 91 KB Posted

Attached to
Automated Surface Observing System (ASOS) Relocation at PNS Federal contract opportunity
Solicitation number
697DCK-22-R-00051
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

View the file

Other files for this federal contract opportunity

Other files attached to Automated Surface Observing System (ASOS) Relocation at PNS, newest first.
File Type Posted
Final - 01A - PNS ASOS Drawings - Revised 2021 12 08.pdf PDF
Final - 01 - Statement of Work - Revised 2021 12 08.docx DOCX document
697DCK-22-R-00051 - 0001.pdf PDF
PNS ASOS Drawings - Revised 2021 11 15.pdf PDF
697DCK-22-R-00051.pdf PDF
01A - PNS ASOS Drawings v5.pdf PDF
Attachment 02 - Wage Determination.pdf PDF
Past Performance Questionnaire.pdf PDF
01 - Statement of Work.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for the Pensacola International Airport (PNS) Automated Surface Observing System (ASOS) Relocation Revised November 15, 2021

Work includes but is not limited to:

1. Locate underground utilities in work areas utilizing detection equipment, drawings provided by the FAA, and drawings provided by the airport authority.

2. Construction of concrete footings for the ASOS sensor pedestals, wind tower, electrical equipment frame, tower saddle, and DCP mounting poles.

3. Providing power to new ASOS, including trenching for and burial of new power wire from nearby transformer, an estimated distance of less than fifty feet. Wire to be buried a minimum of 30” below grade at all points in 1-1/2” water tight pvc-coated rigid galvanized steel conduit as shown on drawing C002.

4. Relocation of wind pole. Pole is 33’ in length.

5. Relocation of ASOS sensors, DCP, and associated wire raceway. Sensor wire disconnection and reconnection to be done by National Weather Service.

6. Placement of north marker and wind tower marker in concrete at locations marked by surveyor. Markers to be provided by FAA. Survey has been completed and is not within the scope of this project.

7. Construction of electrical equipment frame and mounting of disconnects and transformer.

8. Running and connection of all power wires at new ASOS site.

image1.png

File details come from the government source that posted it. Updated .