FIRE SYSTEM TESTING & INSPECTION SERVICES FOR SLC ARTCC AND PHOENIX SKY HARBOR ATCT & TRACON LOCATIONS Federal contract opportunity
Solicitation number
697DCK-19-R-00120
Issued by
Department of Transportation Federal Aviation Administration Northwest Mountain Region

About this file

Attachment B Statement of Work Phoenix (pdf)

View the file

Other files for this federal contract opportunity

Other files attached to FIRE SYSTEM TESTING & INSPECTION SERVICES FOR SLC ARTCC AND PHOENIX SKY HARBOR ATCT & TRACON LOCATIONS, newest first.
File Type Posted
Attachment A Statement of work Salt Lake City.pdf PDF
Amendment 2 to 697DCK-19-R-00120 - Changes to dates and correction to title.pdf PDF
Amendment 3 to 697DCK-19-R-00120 Phoenix Site Visit.pdf PDF
Amendment 4 to 697DCK-19-R-00120 bid due date extended.pdf PDF
Request for Offer 697DCK-19-R-00120.pdf PDF
Attachment B Statement of Work Phoenix.pdf PDF
Amendment 1 to 697DCK-19-R-00120 Adding a site visit for SLC ARTCC.pdf PDF
Amendment 5 to 697DCK-19-R-00120 Answers to Questions.pdf PDF
Attachment C DOL Wage Determination 2015-5489.txt TXT text file
Request for Offer 697DCK-19-R-00120.pdf PDF
Attachment A Statement of work Salt Lake City.pdf PDF
Amendment 4 to 697DCK-19-R-00120 bid due date extended.pdf PDF
Amendment 3 to 697DCK-19-R-00120 Phoenix Site Visit.pdf PDF
Amendment 1 to 697DCK-19-R-00120 Adding a site visit for SLC ARTCC.pdf PDF
Attachment C DOL Wage Determination 2015-5489.txt TXT text file
Attachment B Statement of Work Phoenix.pdf PDF
Amendment 2 to 697DCK-19-R-00120 - Changes to dates and correction to title.pdf PDF
Amendment 2 to 697DCK-19-R-00120 - Changes to dates and correction to title.pdf PDF
Attachment B Statement of Work Phoenix.pdf PDF
Request for Offer 697DCK-19-R-00120.pdf PDF
Amendment 4 to 697DCK-19-R-00120 bid due date extended.pdf PDF
Attachment C DOL Wage Determination 2015-5489.txt TXT text file
Amendment 1 to 697DCK-19-R-00120 Adding a site visit for SLC ARTCC.pdf PDF
Attachment A Statement of work Salt Lake City.pdf PDF
Amendment 3 to 697DCK-19-R-00120 Phoenix Site Visit.pdf PDF
Amendment 2 to 697DCK-19-R-00120 - Changes to dates and correction to title.pdf PDF
Amendment 3 to 697DCK-19-R-00120 Phoenix Site Visit.pdf PDF
Attachment C DOL Wage Determination 2015-5489.txt TXT text file
Request for Offer 697DCK-19-R-00120.pdf PDF
Attachment B Statement of Work Phoenix.pdf PDF
Amendment 1 to 697DCK-19-R-00120 Adding a site visit for SLC ARTCC.pdf PDF
Attachment A Statement of work Salt Lake City.pdf PDF
Amendment 2 to 697DCK-19-R-00120 - Changes to dates and correction to title.pdf PDF
Attachment A Statement of work Salt Lake City.pdf PDF
Attachment B Statement of Work Phoenix.pdf PDF
Amendment 1 to 697DCK-19-R-00120 Adding a site visit for SLC ARTCC.pdf PDF
Request for Offer 697DCK-19-R-00120.pdf PDF
Attachment C DOL Wage Determination 2015-5489.txt TXT text file
Attachment A Statement of work Salt Lake City.pdf PDF
Amendment 1 to 697DCK-19-R-00120 Adding a site visit for SLC ARTCC.pdf PDF
Attachment C DOL Wage Determination 2015-5489.txt TXT text file
Request for Offer 697DCK-19-R-00120.pdf PDF
Attachment C DOL Wage Determination 2015-5489.txt TXT text file
Request for Offer 697DCK-19-R-00120.pdf PDF
Attachment B Statement of Work Phoenix.pdf PDF
Attachment A Statement of work Salt Lake City.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Location:

Phoenix Sky Harbor Air Traffic Control Tower/Terminal Radar Approach Control Facility 3500 East Sky Harbor Blvd.

Phoenix, AZ 85034

PART 1 GENERAL

1.1 Scope of work (SOW).- Provide recurring maintenance of the fire sprinkler system and fire alarm and detection system systems within the Federal Aviation Administration’s (FAA) Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control Facility (TRACON) at Phoenix Sky Harbor International Airport. This maintenance is based on an interval that is outlined in FAA Order 6930.1B and in accordance with the NFPA. All work performed, including all materials and equipment used must be approved by the Contracting Officer’s Representative (COR). This includes but not be limited to performance inspections, scheduling, reporting, and submittals, etc.

The ATCT is 332 feet high and is attached to a three story, approximately 20,000 square foot base building.

The ATCT consists of twenty levels. The facility is protected throughout by automatic sprinkler systems.

Most of the building is protected by wet pipe type systems with the exceptions of the TRACON computer rooms and tower cab, which are protected by four separate double interlock pre-action sprinkler systems.

Automatic wet pipe Class I standpipes are provided in each stair in the tower and base building for a total of four. The tower standpipes extend to the top of each stairwell, Level 19. An analog addressable fire alarm system protects the entire facility. The fire alarm system consists of complete smoke detection throughout the tower and detection in the base building common areas, electrical, mechanical and storage areas. Smoke detection is also provided in all double interlock pre-action system areas to actuate the release of the sprinkler valve. In addition, all sprinkler systems and fire pumps are monitored by the fire alarm system. A fire fighters telephone system is provided, with handsets located at each level in every stair enclosure.

1.2 The contractor expressly acknowledges that the government is relying on their professional expertise in performance of these services. All other material, equipment and labor not specifically detailed or specified, but necessary to complete the maintenance tasks, system performance, and data capture, must be provided by the contractor as an integral part of the work. Provide all Labor, Material, and Equipment for:

A. Inspection, Testing and Maintenance of system performance for the fire Sprinkler system and fire alarm detection systems and stairwell pressurization systems.

B. Inspection, Testing and Maintenance of primary and ancillary equipment associated with the fire sprinkler system and fire alarm and detection system.

C. Other work identified in this scope of work.

1.3 Contractor Qualifications

A. The contractor must be experienced in the testing and maintenance of fire alarm systems and devices. The contractor shall have been engaged in the installation, testing and maintenance of fire alarm systems for a least (7) years. The contractor shall have a fully equipped and trained staff consisting as a minimum of National Institute for Certification Engineering Technology (NICET) Level II certified technicians who can perform the requirements of this specification. The contractor shall have a fully equipped, factory trained and manufacturer certified, service and installation organization, which shall have engaged in the installation and service in the type of equipment installed at this facility for at least (5) years.

B. Provide a job site supervisor who must have a minimum National Institute for Certification Engineering Technology (NICET) Level III and “manufacturer trained” on the system being tested.

The Job site Supervisor must provide their cell number to the COR.

C. Software changes: Software changes to the system will not be permitted unless approved, in writing, by the FAA Fire/Life Safety Specialist.

1.4 Records and documents.-

A. Contractor Record Drawings: The contractor will be provided with record drawings for each system to be tested. These drawings shall be for the contractor’s use in testing and maintenance of the system. The contractor must note any discrepancies between the record drawings and actual system installation. If discrepancies exist, provide a copy of the record drawings clearly annotating each discrepancy and showing the actual system installation. Discrepancies and changes will be clearly identifiable.

B. Final approval and acceptance: Final approval and acceptance of the work will be given by the COR after the following have been completed.

C. The complete fire alarm system has been inspected, tested, and certified in writing by the Contractor. All final documents including all test report forms and the report narrative must bear the stamp of the contractor’s NICET Level II technician who conducted the testing.

D. It has been verified that all fire alarm systems have been fully restored to service. This must be communicated and verified to the site representative prior to leaving the site.

E. All forms documenting the test results and a copy of the report narrative have been submitted to the COR.

F. All requested documentation must be received no later than 14 days following the last day of the test.

1.5 Precedence of contract documents.-

A. In the event of a difference between the following contract provisions, the order of precedence to determine which provision shall govern is:

1. FAA Order 6930.1B, Fire Prevention and Maintenance of fire Protection Equipment

2. NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water Based Fire

Protection Systems

3. NFPA 72, National Fire Alarm Code

4. NFPA 92, Standard for Smoke Control Systems 2015 Edition

5. System Drawings

B. Any discrepancies between the contract provisions, the specifications and the contract drawings must be referred to the COR for a written determination.

1.6 Work Hours. All maintenance and testing will be conducted during hours of low operations as approved by the FAA. Night shift work will be required. Testing personnel must provide valid photo identification and will be escorted by FAA personnel during performance of testing.

PART 2 EXECUTION

2.1 The contractor must coordinate all maintenance activities with the COR no less than two weeks in advance. Approved work hours are to ensure that impact to Air Traffic Operations is minimal.

2.2 Specifications:

Total Flooding and Fixed Extinguishing systems

A. Sprinkler Systems.

1. Quarterly

a. Waterflow alarm devices should be checked quarterly according to NFPA 25.

b. Test low air pressure alarms on pre-action and dry pipe valves.

c. Quick opening devices such as accelerators on dry pipe systems shall be tested quarterly in accordance with the procedure described in NFPA 25.

d. Test Priming water levels on dry pipe and pre-action valves.

2. Semiannually

a. Test all water flow alarm devices. NFPA 25 recommends that water flow alarms be tested quarterly.

b. Test all alarms, supervisory, and trouble signaling devices and system.

c. NFPA 72 covers the maintenance, inspection and testing of alarm initiating and supervisory devices.

d. Semiannual testing is acceptable for valve tamper and other supervisory signal devices.

e. Check condition of sprinklers. NFPA 25 recommends annual inspection of sprinklers. Check for:

1. Cleanliness.

2. Free from corrosion and dirt.

3. Not painted or whitewashed.

4. Not bent or damaged.

5. Free from obstructions; no material shall be placed or stored within 18 inches of sprinkler

6. Properly rated.

7. Required spares available.

f. Test operation of deluge and automatic valves in conjunction with testing of alarm devices and system. NFPA 25 recommends that the priming water level for pre-action and dry pipe valves be tested quarterly in accordance with the manufacture’s instruction or as follows:

1. Open the priming level test valve.

2. If water flows, drain it.

3. Close the valve when water stops flowing and air discharges.

4. If air initially discharges when the valve is opened, the priming water level is probably too low. Add priming water in accordance with the manufacturers directions.

3. Annually.

a. Test operation of dry pipe valves. Clean and adjust as required. NFPA 25 recommends that both pre-action and dry pipe valves be tripped tested annually. “Dry” trip tests may be done annually as long as a full “wet” trip test is done every 3 years. Annually, the interior of each dry pipe valve and pre-action valve shall be inspected, parts examined and cleaned, and any required repairs made.

b. Inspect all fire department connections. NFPA 25 recommends that fire department connections be inspected quarterly.

c. Check all gages with an inspector’s gage to ensure reliability NFPA 25 recommends that gages be replaced every five years or tested every five years with a comparison to a calibrated gage.

d. Sprinkler pipe hangars and seismic sway bracing shall be visually inspected to ensure hangers and bracing are not loose or otherwise damaged.

e. Check to see that a stock of spare sprinklers is available to match existing building systems.

f. Automatic air-pressure maintenance devices shall be tested annually if provided on dry pipe systems.

g. Inquiry should be done to see if a possible source of obstruction to sprinkler piping has been introduced. If so, an obstruction prevention investigation should be undertaken as outlined in NFPA 25.

4. Every 5 Years beginning with year 2022

a. Strainers, filters and restriction orifices for pre-action valves and alarm.

b. Check valves and dry pipe valves must be inspected internally and replaced if necessary.

c. Checks more frequently than every 5 years may be needed depending on the source of fire protection water.

d. Gages must either be replaced or checked against calibrated gage every 5 years.

B. Standpipe and Hose System.

a. Water flow alarm devices should be tested Quarterly.

2. Semiannually.

a. Test all water flow devices (Quarterly in accordance with NFPA 25).

b. Test all alarm, supervisory, and trouble signaling devices and systems.

c. Check all hose valves for leakage.

3. Annually

a. Check all gauges with an inspector’s gage to ensure reliability NFPA 25 recommends a 5 year test interval unless the gage shows abnormal readings or other evidence of possible damage.

b. Inspect all fire department connections. NFPA 25 recommends quarterly inspections for fire department connections.

C. Fire Protection Water Backflow Prevention Assemblies.

1. Annually.

a. A forward flow test shall be conducted at the fire protection system demand including hose streams at a test point down stream from the backflow preventer. If full fire flow cannot be achieved, the test shall be performed at the highest flow possible.

b. A backflow performance test as required by the local Authority having jurisdiction shall be completed.

Other Fire Apparatus and Fire-prevention Equipment

A. Fire Pumps

1. Semiannually.

a. Check pump prime and clean out suction piping strainers and cleanouts.

b. Operate the manual starting means for each fire pump.

2. Annually (Refer also to NFPA 25).

a. Test pump at full rated capacity and pressure. Pump should be tested at minimum, rated, and peak flow.

b. Check relief valve setting and watch for discharge at no flow condition.

c. Lubricate pump bearings.

d. Check pump shaft end play.

e. Check accuracy of pressure gage and sensors.

f. Trip circuit breaker if mechanism is available.

g. Inspect and operate emergency manual starting means (NFPA 25).

B. Fire Hydrant (both wet and dry-barrel hydrants)

1. Annually (and after each operation)

a. Inspect hydrant, lubricate, paint, and replace all worn, damaged, and missing parts.

b. Check for the availability of proper tools and equipment required for hydrant maintenance.

c. Check condition of hydrant operating nut.

d. Check for worn or stripped nozzle threads.

e. Make sure that all nozzle caps can be easily removed.

C. Underground Private Fire Service Mains.

1. Annually.

a. Check to ensure that no portions of underground fire service water mains are exposed. There should be no evidence of water leakage.

D. Fire Department Connections.

a. All plugs, caps, and gaskets should be in place and in good condition.

b. Identification signs should be in place and visible.

c. Check valves should not be leaking.

d. The automatic drain valve should be in place and operating properly.

E. Fire doors, fire shutters, fire windows, and other fire-rated assemblies. Fire door testing and maintenance should follow NFPA 80, “Fire Doors and Fire Window.”

1. Semiannually

a. Check operation to see that door openings are clear of obstructions. Blocking or wedging of fire doors in the open positions should not be allowed.

b. Lubricate guides, bearings, hinges, etc.

c. Repair or replace worn or defective devices, such as hinges, latches, and catches.

Replacement parts shall be obtained from the manufacturer and installed in accordance with the manufacturer’s instructions.

d. Check to ensure that paint is not covering movable parts such as rollers, gears, and closing mechanism.

e. Door guides should be straight and free of dents.

2. Annually.

a. Operate normally held-open doors to ensure operation.

F. Fire Alarm and Detection Systems.

1. Quarterly.

a. Test sprinkler water-flow alarm switches by flowing water through the remote inspector test drain on wet pipe systems and the bypass alarm valve on Pre-action, dry pipe, and deluge systems.

2. Semiannually.

a. Test alarm system supervisory signals including high/low air pressure switches, room-temperature switches, and water-tank level switches.

b. Test valve-tamper switches to ensure trouble signals are being reported in the event of valve movement from normal position.

3. Annually.

a. Test to confirm that all alarm, trouble, and supervisory signals are properly being sent to the local fire alarm panel, and if applicable, being sent and received at the supervising central alarm station.

b. Test and verify each fire alarm circuit including signaling, notification appliance, and indicating device circuits for ground faults and open circuits.

c. Test the power supply to the alarm panel for proper supervision including loss of AC power and transfer to battery back-up.

d. Conduct a voltage test of the batteries in the fire alarm panel.

e. Conduct the specified battery tests as indicated in NFPA 72 for the specific battery including lead-acid type, nickel cadmium type, and sealed lead-acid type.

f. Conduct a functional heat test on all heat detectors except that non-restorable fixed temperature heat detectors that are less than 15 years old should not be tested using a heat source.

g. Conduct a functional test on all smoke detectors for both alarm and trouble. Verify that all signals are received at the local fire alarm control panel.

h. Test all manual fire alarm pull boxes.

i. Test all audible devices such as horns and bells to ensure that each device is functioning.

Record the sound pressure level during testing.

j. Test all visual devices such as strobes. Check to ensure that occupancy changes within the facility have not obstructed the ability for occupants to see the visual devices.

k. Visually inspect and clean if necessary all air duct detectors. Test each detector to ensure proper receipt of trouble and alarm notification at the local fire alarm control panel.

l. Test other detection devices such as air sampling, flame, and projected beam detectors in accordance with NFPA 72.

m. Test all interlocked devices to the fire alarm system such as door closures, fan shut-off or start-ups, elevator recall, power shutdown, etc., for proper activation following alarm system activation. Test to ensure that the proper sequence of events occur following receipt of an alarm at the local firm alarm control panel.

n. Test the Digital Alarm Communicator Transmitter (DACT) by testing for line seizure while initiating an alarm signal while using the primary line for a telephone call. Transmission to the central station via the DACT shall be within 90 seconds. The primary and secondary lines from the DACT shall also be tested for proper supervision by disconnecting each line and ensuring that trouble transmission to the supervising station occurs within 4 minutes.

G. Smoke Removal Systems.

1. Semiannually. Dedicated smoke control systems such as stair pressurization systems in Air Traffic Control Towers should be tested to ensure the following:

a. The smoke control system starts through the input of the fire alarm system such as detectors or manual pull boxes.

b. All dampers function as intended in the original design.

c. All door closures function properly.

2. Annually.

a. Test to ensure that the standby power source for both dedicated and non-dedicated smoke control systems function as designed.

b. Test all initiating devices for smoke control systems such as manual pull boxes and smoke detectors.

c. Test all manual controls and overrides at the smoke system control panel. Verify that all dampers function as intended.

d. At Air Traffic Control Towers with stair pressurization systems, measure the pressure differential between the occupied floor or vestibule in front of the entry door to the stairway at each level with the stair fan running. The Pressure differential should be at least 0.05” water gage for towers with fire protection sprinklers and at least 0.10” water gage at non-sprinklered sites. Use a spring gage to measure the force required to open each entry door into the exit stairway with the stair fan running. The maximum force required to begin to open door should not exceed 30 ft. lbs.