BOS RWSL Phase 4 Offer Form.pdf
PDF 197 KB Posted
- Solicitation number
- 697DCK-18-R-00533
About this file
BOS RWSL Phase 4 Offer Form (pdf)
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Seq Pay Item Item Description Estimated
Quantity Unit
Unit Price in Numerals Unit Price in Words Extended Price
1 1500-1 FAA Resident Engineer’s
Field Office
NOT IN CONTRACT $
2 1525-1 Traffic Control 1 LS $
Dollars and ________________________________________ cents
3 1550-1
Mobilization/
Demobilization
(RWSL Contractor)
1 LS $
Dollars and ________________________________________ cents
4 1550-2
Mobilization/
Demobilization
(Massport)
NOT IN CONTRACT $
5 1575-1 Suspension Time
(8-hour closure)
3 PD $
Dollars and ________________________________________ cents
6 1575-2 Standby Time 150 MIN $
Dollars and ________________________________________ cents
7 1575-3 Down Time
(6-hour closure)
2 PD $
Dollars and ________________________________________ cents
8 1800-1 Barricades 120 EA $
Dollars and ________________________________________ cents
9 1800-2 Runway Closure Markers 4 EA $
Dollars and ________________________________________ cents
10 P-152-1 Unclassified Excavation NOT IN CONTRACT $ 0
Quantity Unit
Unit Price in Numerals Unit Price in Words Extended Price
11 P-152-2 Borrow Excavation NOT IN CONTRACT $ 0
12 P-156-1 Temporary Seeding NOT IN CONTRACT $ 0
13 P-156-2 Catch Basin Inlet
Protection
40 EA $
Dollars and ________________________________________ cents
14 P-160-1 <RCS-1 Soil NOT IN CONTRACT $ 0
15 P-160-2 Soil Reuse at Unlined
Landfills
NOT IN CONTRACT $ 0
16 P-160-3 Soil Reuse at Lined
Landfills
NOT IN CONTRACT $ 0
17 P-160-4 Recycling at Asphalt
Batch Plant
NOT IN CONTRACT $ 0
18 P-209-1 Crushed Aggregate Base
Course
NOT IN CONTRACT $ 0
19 P-405-1 FAA Mix for Repairs NOT IN CONTRACT $ 0
20 P-405-2 State Mix for Repairs NOT IN CONTRACT $ 0
21 P-611-1 Concrete Pavement
Repairs
NOT IN CONTRACT $ 0
22 P-620-1 Runway and Taxiway
Painting
NOT IN CONTRACT $ 0
23 T-901-1 Seeding 2 AC $
Dollars and ________________________________________ cents
24 L-108-1 No. 8 L-824C Cable, Solid
Black Insulation
22,000 LF $
Dollars and ________________________________________ cents
25 L-108-2 No. 8 L-824C Cable, Solid
Red Insulation
38,500 LF $
Dollars and ________________________________________ cents
Quantity Unit
Unit Price in Numerals Unit Price in Words Extended Price
26 L-108-3 No. 1/0 AWG Bare
Copper Guard Wire
NOT IN CONTRACT $ 0
27 L-108-4
Solid No. 6 AWG
Insulated Equipment
Ground Conductor
30,200 LF $
Dollars and _______________________________________ cents
28 L-109-1 Single-Mode Fiber Optic
Cable – 96 fibers
NOT IN CONTRACT $ 0
29 L-110-1
2” Rigid Galvanized Steel
Conduit, Concrete
Encased
NOT IN CONTRACT $ 0
30 L-110-2
2” Rigid Galvanized Steel
Conduit, Concrete
Encased, in Asphalt
Pavement
NOT IN CONTRACT $ 0
31 L-110-3
4” Schedule 40 PVC
Conduit, Concrete
Encased
NOT IN CONTRACT $ 0
32 L-110-4
4” Rigid Galvanized Steel
Conduit, Concrete
Encased
NOT IN CONTRACT $ 0
33 L-110-5
Two Way-4” Schedule 40
PVC Conduit, Concrete
Encased
NOT IN CONTRACT $ 0
34 L-110-6
Two Way-4” Rigid
Galvanized Steel Conduit, Concrete Encased
NOT IN CONTRACT $ 0
35 L-110-7
Four Way-4” Schedule 40
PVC Conduit, Concrete
Encased
NOT IN CONTRACT $ 0
36 L-110-8 Handhole, Aircraft Rated NOT IN CONTRACT $ 0
37 L-110-9 Junction Can NOT IN CONTRACT $ 0
38 L-112-1
Horizontal Directional
Drilling, 3” Gila-Duct
Conduit
NOT IN CONTRACT $ 0
39 L-120-1 RWSL Shelter No. 1 &2 NOT IN CONTRACT $ 0
Quantity Unit
Unit Price in Numerals Unit Price in Words Extended Price
40 L-125-1 Runway Entrance Light NOT IN CONTRACT $ 0
41 L-125-2 Takeoff Hold Light NOT IN CONTRACT $ 0
42 L-125-3 Installation of ¾” Steel
Blank
NOT IN CONTRACT $ 0
43 L-125-4 Runway Entrance Light in
Existing Base Can
14 EA $
Dollars and _______________________________________ cents
44 L-125-5 Takeoff Hold Light in
Existing Base Can
96 EA $
Dollars and _______________________________________ cents
45 L-125-6 Steel Blank on Existing
Base Can
25 EA $
Dollars and _______________________________________ cents
46 L-130-1 Airfield Electrical Testing 1 LS $
Dollars and _______________________________________ cents
47 16000-1 CCR Installation NOT IN CONTRACT $ 0
48 16000-2 Earth Electrode System NOT IN CONTRACT $ 0
49 16000-3 Installation of Lightning
Protection System
NOT IN CONTRACT $ 0
50 16000-4 Utility Meter Service, Shelter 1 & 2
NOT IN CONTRACT $ 0
Acknowle
TOTAL CONTRACT VALUE
FOR
RUNWAY STATUS LIGHTS SYSTEM, PHASE 4
CONTRACT DTFAWA-18-D-xxxxx
AT
GENERAL EDWARD LAWRENCE LOGAN INTERNATIONAL AIRPORT (BOS)
BOSTON, MASSACHUSETTS
(Written in numerals)
(Written in words)
CONTRACTOR:
By:__________________________________________________________________________ Signature of Authorized Representative