About this file

697DCK-18-R-00474P0002 (pdf)

View the file

Other files

File Type Posted
697DCK-18-R-00474amendment3.pdf PDF
697DCK-18-R-00474amendment1.pdf PDF
DOLWAGERATE.pdf PDF
DrawingsMOB-LOC.pdf PDF
697DCK-18-R-00474RFO.pdf PDF
drawingsMOB-GS.pdf PDF
697DCK-18-R-00474P0002.pdf PDF
MOB RW15 420 ILS Specifications 16220.pdf PDF
MOB RW15 420 ILS Specifications 16220.pdf PDF
DrawingsMOB-LOC.pdf PDF
697DCK-18-R-00474amendment1.pdf PDF
697DCK-18-R-00474RFO.pdf PDF
DOLWAGERATE.pdf PDF
drawingsMOB-GS.pdf PDF
697DCK-18-R-00474amendment1.pdf PDF
697DCK-18-R-00474P0002.pdf PDF
MOB RW15 420 ILS Specifications 16220.pdf PDF
DOLWAGERATE.pdf PDF
DrawingsMOB-LOC.pdf PDF
697DCK-18-R-00474RFO.pdf PDF
drawingsMOB-GS.pdf PDF
DOLWAGERATE.pdf PDF
drawingsMOB-GS.pdf PDF
MOB RW15 420 ILS Specifications 16220.pdf PDF
DrawingsMOB-LOC.pdf PDF
697DCK-18-R-00474RFO.pdf PDF
697DCK-18-R-00474amendment1.pdf PDF
drawingsMOB-GS.pdf PDF
DOLWAGERATE.pdf PDF
697DCK-18-R-00474RFO.pdf PDF
MOB RW15 420 ILS Specifications 16220.pdf PDF
DrawingsMOB-LOC.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 2

0002 06/21/2018

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1200 DISTRICT AVENUE

BURLINGTON MA 01803

AAQ510BOS-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

697DCK-18-R-00474

copies to the issuing office.

06/21/2018

(x)

Amendment #00002 is issued for the following questions and answers:

Question: What is the distance between the existing step up transformer and the new contractor furnished step down transformer that is to be installed at the new glide slope shelter site?

Answer: The distance is approximately 5,000’

Question: Are we to remove the existing conduit and cable between the existing disconnect rack and the existing LOC shelter and reinstall new 3” sch 80 and new cable between the two?

Answer: The Contractor is to remove the existing cable and/or conduit and install a new schedule 80 PVC conduit and cable per drawing E003.)

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Susan Newcomb

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

697DCK-18-R-00474/0002

Question: I do not see a foundation detail for the new 10’ X 16’ GFM Shelter in the LOC drawings. Is there one?

Answer: The slab foundation is the same detail used on Drawing MOB-1702484-C002 except it will be 10’ X 16’ and include a 5’ X 5’ door stoop.)

Question: Page MOB-1702484-G006 Shows a 680 SF trench to be restored with top soil and sod.

Amendment 0001 states there is about 6 yards of

67 stone located at the existing RVR and

Glideslope site. Is the 680 SF trench to be restored the 6 yards of stone? If not, what is going on with the trench?

Answer : The following notes shown on drawing

MOB-1702484-G006 should be deleted from the contract and are not requirements for the contractor to perform or supply materials.

• Limits of construction (Disturbed Area 680sf)

Trench to be restored with top soil and sod.

• Silt Fence (400lf)

See drawing MOB-1702484-C001 for the requirements of constructing a new access road to the GS.

There is no trench and no work to be performed on the trench.

The 67 stone is located at the GS and should be utilized onsite or hauled offsite. The location where the stone is should be asphalt paved or seeded. Verify the paving limits with the onsite

RE.