697DCK-18-R-00474amendment3.pdf
PDF 92 KB Posted
- Solicitation number
- 697DCK-18-R-00474
About this file
697DCK-18-R-00474amendment3 (pdf)
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 3
0003 06/21/2018
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
1200 DISTRICT AVENUE
BURLINGTON MA 01803
AAQ510BOS-AFN
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x
697DCK-18-R-00474
copies to the issuing office.
06/21/2018
(x)
Amendment #00003 is issued for the following changes and an additional question and answer:
The closing date is extended to Monday July 30, 2018 at 5:00 p.m. EDT.
Change: Section L is corrected to read:
L.4 Client Past Performance Documentation
Each offeror will be evaluated on his/her past performance as reported by his/her client(s). Past Performance information may be used for responsibility determination.
Offerors must submit, in writing, a minimum of three (3) references, with projects working
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Susan J. Newcomb
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
697DCK-18-R-00474/0003
on an active runway and/or runway experience of similar scope of work and facilities that is valued at
$200,000.00 or higher. References must include phone number, email address, a point of contact, their title, description of the service, location of the service, the value of the service, contract number of service, and dates of service. In order to be deemed responsive and responsible, potential contractors must display favorable past performance. Offerors with less than three (3) contracts performed successfully or insufficient information as described above will not be considered for award.
The government will focus on past performance information that demonstrates quality of performance relative to the complexity of the procurement under consideration.
Past Performance Information identified by the offeror will be used for this review. References other than those identified by the offeror may be contacted by the
FAA and the information received may be used in the evaluation of the offeror’s past performance.
Section M is changed to read:
All prospective Offerors must have a minimum of three (3) projects working on an active runway or runway experience. See L.4, Client Past Performance
Documentation. Offerors with less than three (3) satisfactorily completed contracts over $200,000.00 will not be considered for award.
the following question and answer is provided:
Question: Detail 2 on page MOB-1702483-C104 show there are 5 conduits between the shelter and the
LOC antenna array. Detail 3 on the same sheet describes 4 conduits but depicts 5. Note 9-A&B on page MOB-1702483-E005 describes 2 conduits ( 1-2” and 1-3”). Please clarify the conduits to be used between the shelter interface box and the
Continued ...
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
697DCK-18-R-00474/0003
distribution unit at the LOC antenna array.
Answer: The conduits should be supplied and installed as follows:
• 3-4” & 1-2” schedule 80 PVC Conduits installed between the 2 manholes.
• 3-4” & 1-2” Ridged Steel Conduits installed between the manhole and Distribution Unit.
• 3-4” & 1-2” Ridged Steel Conduits installed between the manhole and Interface Box.
File details come from the government source that posted it.