AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 5

0001 11/08/2017

AAQ-510 EASTERN SVC CTR ACQUISITION

FAA Southern Regional Office, Room 400 FAA Southern Regional Office 1701 Columbia Ave.

AAQ510-AFN

College Park GA 30337 x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

697DCK-18-R-00032

1 copies to the issuing office.

11/08/2017

(x)

This amendment #0001 to solicitation #697DCK-18-R-00032 is issued to incorporate FAA's consolidated response to written questions. All other solicitation content, requirements and supporting documents remain unchanged including the proposal due date of December 18, 2017.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Michael J. Eadon

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

LIST OF CHANGES:

Section B - Supplies or Services/Prices was revised as follows.

Section B - Schedule was revised as follows.

This is a construction, firm fixed price (FFP), competitive procurement with a tiered evaluation source selection method for: Replacement of Communication Towers, Woodstock, CT. The main North American Industry Classification System (NAICS) size standard code for this requirement is 237130, Power and Communication Line and Related Structures Construction, with a small business size standard of $36.5 Million. The period of performance is approximately 60 calendar days after the issuance of a Notice to Proceed (NTP). The total estimated price range for this combined requirement is between $400K - $575K.

The Contractor price must include all costs related to (a) direct and indirect labor, fringe benefits, overhead, G&A expenses, profit, material, equipment, other direct costs, insurance, freight, handling, transportation, (b) federal, state, and local taxes, (c) all applicable fees permits, licenses, and (d) any miscellaneous charges.

Replacement of Communication Towers, Woodstock, CT

DESCRIPTION AND PROPOSED PRICINGS

0001. Replacement of four (4) Existing Metal Towers with One (1) New 24' x 24' x 37' Metal Free Standing Platform in accordance with SOW/Specifications and drawings

Price: __________________

_____________________________ TOTAL PROPOSED PRICE

Section C - Description/Specifications was revised as follows.

Scope of Work was revised as follows.

See Statement/Scope of Works (SOW)/specifications, drawings and other relevant documents provided as attachments and listed in Section J.

Consolidated Questions and Answers Solicitation #: 697DCK-18-R-00032

Replacement of Communication Towers at Woodstock, CT

December 7, 2017

1Q. Have there been any date/time changes to the advertised bid date or pre-bid meeting?

1A. No, there have not been any changes to dates/times of the scheduled site visit and/or solicitation response/proposal due date.

2Q. Do you have the engineers estimate for this project?

2A. The Independent Government Cost Estimate (IGCE) has been prepared. The contents of the IGCE is only available to FAA Project Team members.

3Q. Have there been any addenda released for this?

3A. At the time of this response, only one (1) amendment (Amendment #0001 to Solicitation # 697DCK-18-R- 00032) would have been released and posted on FAACO (https://faaco.faa.gov).

4Q. Are you working with an outside engineer on this project?

4A. No.

5Q. What is the site location for this project?

5A. The correct coordinates for PUT RCAG is: 41°57’16.71”N, 72°12’39.10”W, off of Snow Hill Rd, Ashford, CT.

6Q. There seems to be conflicting/unclear information within the solicitation documents/files pertaining to schedule and timetable. Would FAA please provide confirmation/clarification on what type of schedule and timetable this work will be completed in.

6A. See 7A below.

7Q. Would it be possible for a 120-days period of performance (POP) or is that not an option?

7A. The POP is negotiable. Participating contractors are expected to indicate their best capable POP in their proposals or confirm FAA’s targeted POP. The FAA will select in tier order, the offeror with proposal demonstrating to be technically acceptable (including acceptable capable POP) and lowest price.

8Q. A note to the right of drawing C001 reference a specification for a road. Is this the access road up to the compound or an area inside the compound?

8A. There is no road. The intent of the note is/was to ensure that the area around the shelter was compacted correctly. One other issue with this note is that it was noted that contractor can use the fill in the excavation for the other towers. The foundations do not need to be removed so there won’t be any fill so contractor need to move all excess soil off site.

9Q. In reference to Section 3.4 (Materials) of the specifications, will ASTM A992 wide flange members be allowed?

9A. Yes, ASTM A992 wide flange members exceed ASTM A-36.

10Q. Will ASTM A500 round and rectangular / square tube members be allowed?

10A. Yes, as long as they meet yield strength specifications.

11Q. Is this structure to be considered as an “Essential Facility”?

11A. Yes.

12Q. Can contractor use ASCE/SEI 7-10 to develop the wind loads for the structure?

12A. Yes.

13Q. Are pipe members acceptable for this tower? Section 3 3.2 of Appendix B in the specifications mentions members from “angular or solid stock”. But later it calls out a pipe spec option for tower legs (3.3.3).

13A. Yes, provided they meet the spec yield strength requirements.

14Q. Would a 35’ tower be acceptable?

14A. Yes, provided the total height of the tower is 37’ per plan and meets spec (suggest using a 40’ tower as 37’ is the minimum height).

15Q. Would a precast foundation that meets spec be considered?

15A. Yes.

16Q. Is the tower configuration shown on Drawing PUT-1401319-C005 a requirement, or is contractor allowed to use the bracing configuration that would best facilitate our design?

16A. Contractor may use a configuration to fit contractor’s design provided it meets the spec.

17Q. Will provisions for rock holes be spelled out and what will these provisions encompass in the likely event rock is encountered?

17A. Geotechnical engineer to suggest options after borings.

18Q. Please spell out in writing the additional two main coax runs (LMR-900), cable ladder (width type and length), amount of LMR-400, connector type and quantities that is additionally required.

18A. FAA need 1500 feet of LMR-400 cable and 100 each of LMR N-type male connector made by Times Microwave Systems, EZ-400-NMH-X, 3190-2590. Cable ladder size is listed in spec under 1.1 A as 12” wide with 9” rung spacing (B-Line SB17T12FB or equal). Contractor is advised to do their own area takeoffs, but a minimum 80’ of cable ladder will be needed.

19Q. The Solicitation, Offer and Award – Section 13 B notes that an offer guarantee is required. Section L, Instructions, Conditions and Notice to Bidders – DCK18R00013-L001 – Required Documents and Additional Administrative Information does not list that an offer guarantee is required. We cannot find any other information or reference an offer guarantee in the solicitation package.

19A. See AMS Clause 3.2.2.3-2, Section K of the solicitation document.

Section J - List of Documents, Exhibits and Other Attachments was revised as follows.

Attachment List was revised as follows.

Table has been revised and now reads as follows:

ATTACHMENT TITLE DATE NO. OF

PAGES

01 SOW-Specifications-Rev1 10/31/2017 64 02 Drawings 10/30/2017 11 03 Wage Determination CT170019 10/30/2017 7 04 Past Performance Questionnaire/Survey 10/30/2017 3 04 Past Performance Questionnaire/Survey 10/30/2017 3 05 Consolidated Questions and Answers 12/07/2017 3

2017-12-07T08:26:24-0500
Michael June Eadon

File details come from the government source that posted it.