About this file

This is a Statement of Work (SOW) for Flight Program Operations Simulator Training dated October 26, 2026, issued by the Federal Aviation Administration (FAA).

The FAA requires contractor-facilitated aircraft simulator rental and certified instructor support to enable Aviation Safety Inspectors (ASIs) to maintain Event Based Currency (EBC) flight training proficiency on an annual basis. The contractor must provide simulator access, scheduling coordination, and instructor support for three aircraft platforms: Gulfstream G650 (G-VI), IA-Jet, and Eclipse EA-500S. Each platform requires 12 total training hours annually (1 ASI, 4 hours per quarter, 3 quarters per year). Training requirements include preflight procedures (collision avoidance, runway incursion avoidance, aircraft equipment review, and regulatory review), six aircraft takeoffs (including slope, confined area, pinnacle, and pilot-choice variations), other maneuvers (step turn, stall procedures, power plant failure, and slow flight), up to six landings (crosswind, precision approach, no-flap, simulated power plant failure, circling approach, rejected, and night variations), instrument procedures (area departure, enroute, hold, area arrival, precision approach, non-precision approach, circling approach, missed approach, and unusual altitude recovery), and emergency and abnormal procedures. The contractor must provide written documentation via email to the Contracting Officer's Representative and Program Management Office upon training completion indicating ASI pass or failure status.

The period of performance is one base year plus four option periods from award date. The contractor must submit invoices within 30 days of training completion, numbered in contractor format with contract and delivery order numbers and minimum identification of training hours. The primary place of performance is Alliance Airport, Fort Worth, Texas, though non-common aircraft training may be conducted in the field.

View the file

Other files

File Type Posted
Appendix A.pdf PDF

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Flight Program Operations

• Gulfstream G650 (G-VI)

• IA-Jet

• Eclipse EA-500S

Simulator Training

Statement of Work

October 26, 2026

Table of Contents

1.0 INTRODUCTION

2.0 BACKGROUND

3.0 SCOPE OF WORK

4.0 REQUIREMENTS

4.0 Preflight

4.1 Six Takeoffs

4.2 Other Maneuvers

4.4 Six Landings

4.5 Instrument Procedures

4.6 Emergency/Abnormal Procedures

5.0 REPORTS

6.0 PERIOD OF PERFORMANCE

7.0 INVOICING

8.0 PLACE OF PERFORMANCE

FLIGHT PROGRAM OPERATIONS

STATEMENT OF WORK

1.0 INTRODUCTION

The Federal Aviation Administration (FAA) Flight Team Training provides flight program participants with the proficiency and skills needed to conduct their primary job functions to ensure safe and compliant operations. This training enhances safety by giving participants the foresight to recognize potentially dangerous situations and the proficiency to recover when needed. The FAA is required to have Aviation Safety Inspectors (ASIs) complete Event Based Currency (EBC) flight training using Gulfstream G650 (G-VI), IA-Jet, and Eclipse EA-500S aircraft simulators on an annual basis.

2.0 BACKGROUND

The FAA requires contractor-facilitated aircraft simulator access for ASIs assigned to Flight Program Operations. ASIs must maintain aircraft-specific proficiency through the EBC program, and the FAA relies on simulator rental and associated instructional support to accomplish this recurring training requirement.

The FAA’s requirement includes recurring simulator usage by aircraft platform and training cycle.

Accordingly, Section 3.0 identifies the simulator platforms, estimated usage, and related support the Contractor shall provide under this Statement of Work (SOW).

3.0 SCOPE OF WORK

Flight Program Operations requires the Contractor to facilitate the rental of aircraft simulators and provide certified instructors, as applicable, to support Event Based Currency (EBC) training for Aviation Safety Inspectors (ASIs) for one (1) base year and four (4) option periods from the date of award. The simulators are required to complete currency flight training for all ASIs as identified in this SOW.

The Contractor shall provide simulator rental support in accordance with the platform requirements and estimated usage specified in the table below:

Platform Type Rental ASI's Hours

Per Quarter

Number Quarters

Total Hours per Year

Gulfstream G650 (G-VI) Simulator 1 4 3 12 IA-Jet Simulator 1 4 3 12 Eclipse EA-500S Simulator 1 4 3 12

The Contractor shall provide all simulator access, scheduling coordination, and instructor support necessary to accomplish the training requirements set forth in Section 4.0, including instruction and review on preflight, aircraft takeoffs, other maneuvers, aircraft landings, instrument procedures, and emergency/abnormal procedures.

4.0 REQUIREMENTS

The Contractor shall facilitate simulator training and certified instructors while flying, to include instruction and/or review on preflight, aircraft takeoffs, other maneuvers, aircraft landings, instrument procedures, and emergency/abnormal procedures for the aircraft platforms covered under this SOW. All training needs to be in compliance with Appendix A.

4.1 Preflight

The Contractor shall facilitate the following (if applicable) in pre-flight: collision avoidance procedure, runway incursion avoidance procedures, aircraft equipment review, tail rotor failure procedure, dynamic roll over, Low RPM recovery, settling with power, ground resonance LTE, Certification Maintenance Requirement (CMR), Aircraft Flight Manual (AFM) review, and regulatory review.

4.2 Aircraft Takeoffs

The Contractor shall facilitate six (6) takeoffs to include one (1) slope takeoff, one (1) confined area takeoff, one (1) pinnacle takeoff and three (3) takeoffs of the pilot’s choice for the Gulfstream G650 (G-VI), IA-Jet, and Eclipse EA-500S.

4.3 Other Maneuvers

The Contractor shall facilitate one (1) step turn, three (3) stall procedures, one (1) power plant failure and maneuver during slow flight.

4.4 Aircraft Landings

The Contractor shall facilitate up to six (6) landings to include one (1) crosswind landing, one

(1) landing from a precision approach, one (1) no flap landing (not required in aircraft, if prohibited by AFM), one (1) landing with simulated power plant failure, one (1) landing from circling approach, one (1) rejected landing, and three (3) night landings (when night job functions are performed).

4.5 Instrument Procedures

The Contractor shall facilitate one (1) area departure (published or unpublished), one (1) enroute procedure, one (1) hold, one (1) area arrival (published or unpublished), one (1) precision approach, one (1) non-precision approach, one (1) circling approach, one (1) missed approach and one (1) unusual altitude recovery.

4.6 Emergency/Abnormal Procedures

The Contractor shall facilitate one (1) emergency procedure and one (1) abnormal procedure.

5.0 REPORTS

The Contractor shall provide written documentation (via email) to the Contracting Officer’s Representative (COR) and the Program Management Office (PMO) upon completion of training indicating the ASI’s Completion/Failure.

6.0 PERIOD OF PERFORMANCE

The period of performance is for one (1) base year and four (4) option periods from the date of award.

7.0 INVOICING

The Contractor must submit an invoice within thirty (30) days upon completion of any training.

The invoice must be numbered in contractor format and include the contract number and delivery (task) order number. The invoice, at minimum, must identify the training hours. The Contract must also reference applicable contract clauses in the contract as well related to invoicing.

8.0 PLACE OF PERFORMANCE

All EBC flight training was consolidated by the FAA in October 2012. Aircraft Multi Engine Land (AMEL), Aircraft Single Engine Land (ASEL), and rotorcraft will be performed at Alliance Airport, Fort Worth, Texas. All EBC flight training for non-common Aircraft will continue to be flown in the field.

1.0 INTRODUCTION
2.0 BACKGROUND
The FAA requires contractor-facilitated aircraft simulator access for ASIs assigned to Flight Program Operations. ASIs must maintain aircraft-specific proficiency through the EBC program, and the FAA relies on simulator rental and associated instructi...
The FAA’s requirement includes recurring simulator usage by aircraft platform and training cycle. Accordingly, Section 3.0 identifies the simulator platforms, estimated usage, and related support the Contractor shall provide under this Statement of Wo...
3.0 SCOPE OF WORK
4.0 REQUIREMENTS
4.1 Preflight
4.2 Aircraft Takeoffs
4.3 Other Maneuvers
4.4 Aircraft Landings
4.5 Instrument Procedures
4.6 Emergency/Abnormal Procedures
5.0 REPORTS
6.0 PERIOD OF PERFORMANCE
7.0 INVOICING
8.0 PLACE OF PERFORMANCE

File details come from the government source that posted it. Updated .