SOW - Simulator Training.pdf
PDF 424 KB Posted
- Solicitation number
- 6973GH-27-R-Simulator
About this file
This is a Statement of Work (SOW) for Flight Program Operations Simulator Training dated October 26, 2026, issued by the Federal Aviation Administration (FAA).
The FAA requires contractor-facilitated aircraft simulator rental and certified instructor support to enable Aviation Safety Inspectors (ASIs) to complete mandatory Event Based Currency (EBC) flight training on an annual basis. The contractor must provide simulator access, scheduling coordination, and instruction for four aircraft platforms: Bombardier Challenger 300 (CL-30), Bombardier Global G-7500, Dassault Falcon 6X (DA-6X), and BE-350 Proline 21. Annual simulator usage is specified as: Bombardier Challenger 300 (12 hours), Bombardier Global G-7500 (12 hours), Dassault Falcon 6X (8 hours), and BE-350 Proline 21 (48 hours), totaling 80 hours per year. Training requirements include instruction and review on preflight procedures (including collision avoidance, runway incursion avoidance, aircraft equipment review, and Aircraft Flight Manual review); six aircraft takeoffs (including slope, confined area, and pinnacle takeoffs); other maneuvers (step turn, stall procedures, power plant failure, and slow flight); six aircraft landings (including crosswind, precision approach, no-flap, power plant failure, circling approach, rejected, and night landings); instrument procedures (area departure, enroute, hold, area arrival, precision and non-precision approaches, circling approach, missed approach, and unusual altitude recovery); and emergency/abnormal procedures. The period of performance is one base year plus four option periods from award date. The contractor must submit invoices within 30 days of training completion, identifying training hours and referencing the contract number and delivery order number. Training will be performed at Alliance Airport in Fort Worth, Texas for Aircraft Multi Engine Land (AMEL), Aircraft Single Engine Land (ASEL), and rotorcraft operations, with non-common aircraft training conducted in the field. Upon completion of training, the contractor must provide written documentation via email to the Contracting Officer's Representative and Program Management Office indicating ASI completion or failure status.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Flight Program Operations
• Bombardier Challenger 300 (CL-30)
• Bombardier Global G-7500
• Dassault Falcon 6X (DA-6X)
• BE-350 Proline 21
Simulator Training
Statement of Work
October 26, 2026
Table of Contents
1.0 INTRODUCTION
2.0 BACKGROUND
3.0 SCOPE OF WORK
4.0 REQUIREMENTS
4.0 Preflight
4.1 Six Takeoffs
4.2 Other Maneuvers
4.4 Six Landings
4.5 Instrument Procedures
4.6 Emergency/Abnormal Procedures
5.0 REPORTS
6.0 PERIOD OF PERFORMANCE
7.0 INVOICING
8.0 PLACE OF PERFORMANCE
FLIGHT PROGRAM OPERATIONS
STATEMENT OF WORK
1.0 INTRODUCTION
The Federal Aviation Administration (FAA) Flight Team Training provides flight program participants with the proficiency and skills needed to conduct their primary job functions to ensure safe and compliant operations. This training enhances safety by giving participants the foresight to recognize potentially dangerous situations and the proficiency to recover when needed. The FAA is required to have Aviation Safety Inspectors (ASIs) complete Event Based Currency (EBC) flight training using Bombardier Challenger 300 (CL-30), Bombardier Global G-7500, Dassault Falcon 6X (DA-6X), and BE-350 Proline 21 aircraft simulators on an annual basis.
2.0 BACKGROUND
The FAA requires contractor-facilitated aircraft simulator access for ASIs assigned to Flight Program Operations. ASIs must maintain aircraft-specific proficiency through the EBC program, and the FAA relies on simulator rental and associated instructional support to accomplish this recurring training requirement.
The FAA’s requirement includes recurring simulator usage by aircraft platform and training cycle.
Accordingly, Section 3.0 identifies the simulator platforms, estimated usage, and related support the Contractor shall provide under this Statement of Work (SOW).
3.0 SCOPE OF WORK
Flight Program Operations requires the Contractor to facilitate the rental of aircraft simulators and provide certified instructors, as applicable, to support Event Based Currency (EBC) training for Aviation Safety Inspectors (ASIs) for one (1) base year and four (4) option periods from the date of award. The simulators are required to complete currency flight training for all ASIs as identified in this SOW.
The Contractor shall provide simulator rental support in accordance with the platform requirements and estimated usage specified in the table below:
Platform Type Rental ASI's
Hours Per
Quarter
Number Quarters
Total Hours per
Year
Bombardier Challenger 300
(CL-30)
Simulator 1 4 3 12
Bombardier Global G-7500 Simulator 1 4 3 12 Dassault Falcon 6X (DA-6X) Simulator 1 4 2 8
BE-350 Proline 21 Simulator 4 4 3 48
The Contractor shall provide all simulator access, scheduling coordination, and instructor support necessary to accomplish the training requirements set forth in Section 4.0, including instruction and review on preflight, aircraft takeoffs, other maneuvers, aircraft landings, instrument procedures, and emergency/abnormal procedures.
4.0 REQUIREMENTS
The Contractor shall facilitate simulator training and certified instructors while flying, to include instruction and/or review on preflight, aircraft takeoffs, other maneuvers, aircraft landings, instrument procedures, and emergency/abnormal procedures for the aircraft platforms covered under this SOW. All training needs to be in compliance with Appendix A.
4.1 Preflight
The Contractor shall facilitate the following (if applicable) in pre-flight: collision avoidance procedure, runway incursion avoidance procedures, aircraft equipment review, tail rotor failure procedure, dynamic roll over, Low RPM recovery, settling with power, ground resonance LTE, Certification Maintenance Requirement (CMR), Aircraft Flight Manual (AFM) review, and regulatory review.
4.2 Aircraft Takeoffs
The Contractor shall facilitate six (6) takeoffs to include one (1) slope takeoff, one (1) confined area takeoff, one (1) pinnacle takeoff and three (3) takeoffs of the pilot’s choice for the Bombardier Challenger 300 (CL-30), Bombardier Global G-7500, Dassault Falcon 6X (DA-6X), and BE-350 Proline 21.
4.3 Other Maneuvers
The Contractor shall facilitate one (1) step turn, three (3) stall procedures, one (1) power plant failure and maneuver during slow flight.
4.4 Aircraft Landings
The Contractor shall facilitate up to six (6) landings to include one (1) crosswind landing, one
(1) landing from a precision approach, one (1) no flap landing (not required in aircraft, if prohibited by AFM), one (1) landing with simulated power plant failure, one (1) landing from circling approach, one (1) rejected landing, and three (3) night landings (when night job functions are performed).
4.5 Instrument Procedures
The Contractor shall facilitate one (1) area departure (published or unpublished), one (1) enroute procedure, one (1) hold, one (1) area arrival (published or unpublished), one (1) precision approach, one (1) non-precision approach, one (1) circling approach, one (1) missed approach and one (1) unusual altitude recovery.
4.6 Emergency/Abnormal Procedures
The Contractor shall facilitate one (1) emergency procedure and one (1) abnormal procedure.
5.0 REPORTS
The Contractor shall provide written documentation (via email) to the Contracting Officer’s Representative (COR) and the Program Management Office (PMO) upon completion of training indicating the ASI’s Completion/Failure.
6.0 PERIOD OF PERFORMANCE
The period of performance is for one (1) base year and four (4) option periods from the date of award.
7.0 INVOICING
The Contractor must submit an invoice within thirty (30) days upon completion of any training.
The invoice must be numbered in contractor format and include the contract number and delivery (task) order number. The invoice, at minimum, must identify the training hours. The Contract must also reference applicable contract clauses in the contract as well related to invoicing.
8.0 PLACE OF PERFORMANCE
All EBC flight training was consolidated by the FAA in October 2012. Aircraft Multi Engine Land (AMEL), Aircraft Single Engine Land (ASEL), and rotorcraft will be performed at Alliance Airport, Fort Worth, Texas. All EBC flight training for non-common Aircraft will continue to be flown in the field.
| 1.0 INTRODUCTION |
| 2.0 BACKGROUND |
| The FAA requires contractor-facilitated aircraft simulator access for ASIs assigned to Flight Program Operations. ASIs must maintain aircraft-specific proficiency through the EBC program, and the FAA relies on simulator rental and associated instructi... |
| The FAA’s requirement includes recurring simulator usage by aircraft platform and training cycle. Accordingly, Section 3.0 identifies the simulator platforms, estimated usage, and related support the Contractor shall provide under this Statement of Wo... |
| 3.0 SCOPE OF WORK |
| 4.0 REQUIREMENTS |
| 4.1 Preflight |
| 4.2 Aircraft Takeoffs |
| 4.3 Other Maneuvers |
| 4.4 Aircraft Landings |
| 4.5 Instrument Procedures |
| 4.6 Emergency/Abnormal Procedures |
| 5.0 REPORTS |
| 6.0 PERIOD OF PERFORMANCE |
| 7.0 INVOICING |
| 8.0 PLACE OF PERFORMANCE |
File details come from the government source that posted it. Updated .