Vendor Questions-Answers.docx

DOCX document 18 KB Posted

Attached to
6973GH-27-RFI-00001 - Ultralife UBBL13-01 Lithium-Ion Batteries - RFI
Solicitation number
6973GH-27-RFI-00001
Issued by

About this file

This file is a Question and Answer document addressing clarifications to a Statement of Objectives (SOO) for storage, conditioning, quality screening, maintenance, procurement, and shipping services for Ultralife UBBL13-01 Lithium-Ion Batteries. The FAA will provide an initial inventory of 100 batteries and the contractor will be responsible for maintaining inventory levels using separate pricing for startup costs, recurring storage and readiness, per-unit processing, and FAA-directed procurement and freight. The contractor must acquire all conditioning and test equipment (charger, health meter, discharger, voltage measurement) and maintain a minimum of 75-100 conditioned serviceable batteries to support urgent orders. Shipment requirements include 24-hour P-1 and 48-hour P-2 delivery timeframes from already-conditioned and staged inventory, with batteries discharged to 30% before shipment. Initial conditioning requires three full cycles upon receipt; subsequent conditioning to discharge specifications is sufficient before release.

Orders will be placed during normal business hours Monday through Friday, with OCONUS destinations limited to Alaska, Puerto Rico, Hawaii, and Guam, though future DOD orders may be included. The contractor is responsible for export documentation, customs coordination, duties, taxes, and destination-country dangerous-goods requirements for OCONUS shipments. Equipment alternatives require FAA pre-approval before use. Reporting must be provided in Microsoft Excel format for the initial 100 FAA-provided batteries and any failure quantities on a monthly or quarterly basis. NDAA 889 certification is the cybersecurity requirement; FedRAMP authorization is only required if the contractor interfaces with the FAA network. The contractor is responsible for interfacing with battery suppliers regarding procurement of additional batteries beyond the initial 100.

View the file

Other files

File Type Posted
msds041.pdf PDF
SourcesSoughtRFI UltraLife Battery Storage.docx DOCX document
TDS_UBBL13_01.pdf PDF
ETR Battery Statement of Objective (SOO).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVE (SOO) Questions/Answers Storage, Conditioning, Quality Screening, Maintaining, Procurement, and Shipping Services for Ultralife UBBL13-01 Lithium-Ion Batteries Please provide initial and maximum on-hand inventory, typical and peak order quantities, and the desired emergency stock level. May screened inventory be staged before order receipt, and how long may it remain ready for release? FAA does not have a true demand at this point. This is a new fielded radio. It is likely FAA will provide the initial inventory for batteries and the contractor will be responsible for maintaining the inventory levels.

Please identify expected overseas destinations, after-hours and weekend order expectations, and FAA’s preferred disposition process for failed or damaged batteries. Orders will be placed during normal business hours (0800-1630) Monday – Friday. AK, PR, HI, Guam would be the extent of the OCONUS FAA locations. Some DOD orders could be included in the future.

We recommend separate pricing for startup, recurring storage and readiness, per-unit processing, and FAA-directed procurement and freight. This would distinguish the cost of maintaining emergency availability from the estimated annual throughput. FAA would recommend separate CLINS for each effort. FAA will provide separate categories for ROM structure.

Contractor requests that FAA consider an SDVOSB set-aside if market research supports adequate competition. Noted Does the 24-hour P-1 and 48-hour P-2 shipment clock assume that batteries are already fully conditioned, screened and staged as serviceable inventory? Yes. Please remember discharging is a requirement before shipping.

Does the FAA require the exact conditioning/test equipment identified in the SOO, or will technically equivalent equipment be permitted? If alternate equipment is to be used that is not in the SOO, FAA must pre-authorize before use.

What minimum quantity of conditioned, serviceable inventory must be maintained to support urgent orders? 75-100 is recommendation until FAA has updated demand data.

Will the FAA furnish the initial battery inventory and specialized test equipment, or must the contractor acquire all inventory and equipment? The plan will be for FAA to provide initial inventory of batteries, but the other inventory (charger, health meter, discharger, voltage measurement) will need to be acquired by contractor.

What technician qualifications, training, certifications or manufacturer authorizations will be required for conditioning and quality screening? N/A What specific reporting fields, inventory interfaces, cybersecurity requirements and retention periods will apply to serialized records? FAA will ask for inventory quantities most likely on a monthly/quarterly basis on the initial FAA provide inventory only. This might include any failure quantities on first QTY. 100 provided.

For OCONUS shipments, which party is responsible for export documentation, customs coordination, duties/taxes and destination-country dangerous-goods requirements? Contractor is responsible.

What are the Government acceptance criteria and disposition instructions for batteries that fail screening or cannot be restored to the prescribed thresholds? For GFE provided batteries (QTY. 100), FAA would require a report of the batteries that need to be scrapped that were initially provided. For any batteries procured by contractor, it’s up to the contractor to interface with battery supplier.

To protect the data of the Government up to and including all CUI, the warehouse management and shipping software should be required to be FedRAMP authorized to meet FAA cyber security requirements. NDAA889 certified is only requirement. FedRAMP is only required if contractor is to interface with FAA network.

Please confirm whether the three full conditioning cycles must be completed before every release or only at initial acceptance / after defined maintenance intervals. Initial 3 cycle conditioning upon receipt of battery is required, then conditioning to discharge to 30% before shipment is sufficient.

Please clarify whether the P-1 and P-2 clock begins against already-conditioned ready-stock and whether the FAA will fund a minimum buffer inventory. FAA will provide first QTY. 100 batteries. The clock begins when FAA sends send the battery order.

Please confirm whether equipment equivalents require preapproval and whether the FAA will provide validated test procedures, CSV format and acceptance thresholds. Equipment equivalents will require pre-approval by FAA. Any necessary procedures are provided in SOO and will also be provided in final SOW.

Please identify anticipated CONUS/OCONUS destinations, transport modes, volume by priority, and whether Government Furnished Property reporting or specific inventory systems are required. Known OCONUS locations already provided in previous answer, transportation modes are decided by contractor but must follow rules and regulations for safe battery transportation. Report using Microsoft Excel or equivalent providing inventory of first QTY. 100, as well as any failure quantities out of that initial QTY. 100 will be all that is required.