This document is an Addendum #1 for Solicitation SIR 6973GH-26-R-00039, containing a series of Requests for Information (RFI) related to a Federal Aviation Administration (FAA) facility door hardware and access control project. The RFI addresses multiple technical and procedural questions, including existing frame reuse, sliding door motor replacement, electrical requirements, security system contingencies, finish painting specifications, submittal approvals, preconstruction site access, escort requirements, wage determinations, and work hour flexibility.
Specific technical details include requirements for Door 1A hardware replacement, which involves installing a new LCN 9550 opener, BEA 10MS41-DA push button, Von Duprin 9847-F concealed rod fire exit device, and a Best seven-pin mortise type cylinder compatible with the building master system. The FAA will provide escorts as needed, review submittals within five business days, and allow extended evening work hours on a case-by-case basis. The applicable wage determination is WD IN20250002, with some positions potentially not covered by Davis-Bacon wage categories.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIR 6973GH-26-R-00039
Addendum #1
Attachment 9 Page | 1
Requests for Information:
1. QUESTION: Existing Frame Reuse Please confirm whether any existing door frames are to remain in place if found structurally sound, square, and plumb, or if all frames must be replaced regardless of condition.
ANSWER: Remain in place if structurally sound
2. QUESTION: Sliding Door Motor at 2A Please confirm whether the new motor for Door 2A must be integrated with the existing access control systems, or if a motor-only replacement is sufficient.
ANSWER: The new motor must be compatible and working with the access control system
3. QUESTION: Electrical for Access Control Are electrical upgrades or conduit modifications required to support automatic openers or access controls, or must the contractor connect only to existing power/systems?
ANSWER: There should not be any modifications needed
4. QUESTION: Malfunction Contingency for Security System Please clarify whether the contractor is expected to resolve any security system reprogramming or if the FAA will provide this support?
ANSWER: No new programming of any of these components is expected. However, in the event the access control system does not work upon replacement of the new hardware, the contractor shall work with the COR to resolve any installation issues.
5. QUESTION: Finish Requirements (Roycroft Pewter #2848) Is the specified finish color to be applied to both interior and exterior faces of each door, or to one side only?
ANSWER: The entire door must be finish painted and existing or new signs installed/replaced.
6. QUESTION: Submittal Approval Timeline What is the FAA's expected review timeline for submittals, and can rolling approvals be granted to avoid delay in the issuance of NTP?
ANSWER: Submittals will require five (5) business days for review
7. QUESTION: Preconstruction Access for Verification May the contractor access the site before NTP issuance to field-verify conditions, door hardware dimensions, and power connections?
ANSWER: Yes, but facility will require at least 24 hours notice prior and list of individuals
SIR 6973GH-26-R-00039
Addendum #1
Attachment 9 Page | 2
8. QUESTION: FAA Escort Requirements Will FAA escorts be continuously available during standard work hours, or must the contractor schedule work to FAA escort availability?
ANSWER: Escort will be provided as needed for entirety of work.
9. QUESTION: Wage Determination Confirmation Please confirm that WD IN20250002 (09/19/2025) is the applicable wage determination for all labor classifications on this project.
ANSWER: WD IN20250002 (09/19/2025) is the applicable wage determination for covered positions. Some positions may not be covered by Davis Bacon wage determination categories.
10. QUESTION: Work Hour Flexibility Are extended hours (evenings or weekends) allowed with prior FAA approval, if necessary to maintain the schedule?
ANSWER: Extended hours (evenings) will be on a case-by-case basis. Weekend hours are not available for escort.
11. QUESTION: What does Door 1A Hardware replacement require?
ANSWER: Door 1A Hardware replacement requires:
- Opener – LCN 9550 (not currently installed)
- Push Button – BEA 10MS41-DA (not currently installed)
- Exit Device – Von Duprin 9847-F/Concealed Rod Fire Exit Device/230L (not currently installed
- Door – New Door hardware will require Cylinder that meets building master system (Best seven pin mortise type