This document contains questions and answers regarding a solicitation to renovate the air traffic control tower at the Bangor International Airport in Bangor, Maine. The solicitation was issued by the Department of Transportation Federal Aviation Administration Franchise Acquisition Services for contract number 6973GH-24-Q-00007. Key details include specifications for replacing a post indicator valve such as assuming an excavation depth of 8 feet, requirements for new sidewalk construction to match existing features, specifications for backfilling excavated areas including using existing fill material and compacting to 95% density, and answers to various questions from bidders around staging areas, furniture removal, testing for asbestos containing materials, and other coordination details.

View the file

Other files

File Type Posted
SOW_BGR_ATCT Refurb_Rev_12.7.23.pdf PDF
6973GH-24-Q-00007_amd0002.pdf PDF
6973GH-24-Q-00007_amd0001.pdf PDF
SF25 Performance Bond Form.pdf PDF
SOW_BGR_ATCT Refurb 11.15.23.pdf PDF
Wage Determination.pdf PDF
SF24 Bid Bond Form.pdf PDF
6973GH-24-Q-00007.pdf PDF
Contractors Release Form DOT F 4220.4.doc DOC document
Uniform Bipartisan Infrastructure Law Report.xlsx XLSX spreadsheet
SF25A Payment Bond Form.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Although we could not verify the depth of the PIV valve. It appears to be approximately 10’ below grade. Should all bidders assume that depth for excava�on purposes?

a. Yes, bidders shall assume a 8’ depth.

2. Due to the depth of the excava�on required to access the PIV valve, some of the sidewalks will need to be demoed. Will you provide a detail/specifica�on for new sidewalk construc�on (strength of concrete, reinforcement, etc.) & gravel base requirements?

For the PIV valve replacement, the Contractor must install traffic barriers to direct any pedestrians around excavation and backfill areas.

New sidewalk:

1. New sidewalk must match eleva�on, sloping, expansion/contrac�on joints of exis�ng sidewalk.

2. If the sidewalk is cut at an expansion joint, epoxy dowel quan�ty 3 #4 deformed grade

60 rebar 6” from the edges along the cross sec�on of the sidewalk at equal spacing to bond new sidewalk to exis�ng sidewalk.

3. Below is a detail for expansion and contrac�on joint. Restore new sidewalk to match exis�ng.

4. Concrete mix shall be standard, normal weight, freeze thaw resistant 4,000 psi mix.

Slump must be 4”. Air entrainment must be 5-7%. Aggregates must be well graded with max ¾”. Thickness on concrete shall be 6” to match exis�ng. Place concrete in accordance with ACI 301. Follow temperatures curing requirements in ACI 305 and ACI

306. Tool edges to match exis�ng.

5. Formwork shall be used and reinforced to create a sidewalk with a consistent and straight edge.

6. Reinforce sidewalk with WWF 6x6 W2.9 x W2.0.

7. Use exis�ng fill and compact to 95% density.

3.6 CURING AND PROTECTION

A. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures and mechanical injury.

B. Cure concrete following the recommendations of ACI 301 and 308, "Standard Practice for Curing Concrete".

Q&A Sheet

6973GH-24-Q-00007

Bangor Refurb

3.7 PATCHING OF CONCRETE SURFACES

A. Formed surfaces: Patch all honeycombs and other imperfections immediately after removing forms while concrete is still green, as follows:

1. Finish No. 1 (Concealed Below Grade Concrete): Patch all form tie holes, aggregate pockets, honeycomb and defective areas as required with patching and surfacing compound.

2. Finish No. 2 (Exposed Above Grade Concrete): Patch aggregate pockets, honeycomb and other defective areas with patching and surfacing compound, mixing white or normal cement as necessary to match existing surface color as closely as possible.

3. Are we to assume the excavated material is suitable for backfill a�er the replacement of the PIV? Any compac�on requirements, etc.?

a. Yes the exis�ng material is suitable for fill.

Compac�on Requirements:

EARTH MOVING 31 20 00

1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain frost or ice.

3.9 SOIL MOISTURE CONTROL

A. Uniformly moisten or aerate sub-grade and each subsequent fill or backfill soil layer before compaction to within two (2) percent of optimum moisture content.

3.10 COMPACTION OF SOIL BACKFILLS AND FILLS

A. Place backfill and fill soil materials in layers not more than eight (8) inches in loose depth for material compacted by heavy compaction equipment, and not more than four (4) inches in loose depth for material compacted by hand-operated tampers.

B. Place backfill and fill soil materials evenly on all sides of structures to required elevations, and uniformly along the full length of each structure.

C. Compact soil materials to not less than the following percentages of maximum dry unit weight according to ASTM D 698 “Standard Proctor”:

1. Under walkways, scarify and re-compact top 6 inches below sub-grade and compact each layer of backfill or fill soil material at 95 percent.

4. Can the excavated material be temporarily stored on site un�l it can be backfilled?

a. Yes. The contractor must communicate to the FAA on any needed parking areas/spaces.

5. Can you provide floor plans with dimensions of rooms receiving new flooring (Smoke Room & Mechanical Room)?

a. Yes base building floor plan provided.

6. In the Mechanical there is a wood ramp. What happens with this? How does the epoxy floor coordinate with it?

a. Keep the wood ramp and epoxy around it.

7. In room we are providing new flooring, will all furniture, etc. be removed by the owner prior to our work in these areas?

a. FAA will remove the furniture.

b. Contractor must coordinate with FAA for temporarily reloca�ng or working around the runway monitoring equipment on the 2nd floor elevator landing as referenced in the Flooring Install sec�on in the SOW.

8. Who is the security company provided by the owner?

a. FAA CMC 855 801 6191. KBR.

9. Are the ceilings in the stairwells to be painted?

a. Not required.

10. Is the underside of the exposed stairs/landings to be painted?

a. Not required.

11. Are the elevator doors & frames to be painted (at least 1 has an avia�on design on it)?

a. All except the 1st floor and Sub-Junc�on they have vinyl wraps on the doors.

12. Are the metal hea�ng covers, sprinkler piping, etc. to be painted?

a. Not required.

13. Can you clarify what exactly needs to be tested for ACM or specify an allowance all bidders should carry? The specs call to test at all areas of work, but it needs to be clarified or quan�fied.

a. Contractor shall hire a licensed asbestos testing company to test for asbestos at areas of demolition such as flooring demolition and sheet-rock demolition.

b. The exterior doors are assumed to be ACM. See General Scope of Work.

14. Will there be room on site for an office trailer?

a. Yes but the trailer may need to be placed in the FAA auxiliary parking lot. The FAA auxiliary parking lot is outside the security fence but there is a walkway with a pedestrian gate.

15. Will there be room on site for a dumpster?

a. Yes, the dumpster can be located in front of the garage.

16. Will there be room on site for a storage container?

a. The storage container can be located in front of the garage or possibly a few parking spaces adjacent to the engine generator building and communication tower. If parking spaces are requested, it is limited and it must be coordinated with the FAA. Parking is prioritized for Air Traffic personnel.

17. Will there be a specific laydown area available?

a. Yes, the laydown area can be located in front of the garage.

18. If any of the above are allowable, will these areas need to be temporarily fenced in?

a. No, but the pedestrian gate for the auxiliary parking lot must remain locked when not in use.