Wage Determination as of 1-29-2021.pdf PDF
6973GH-20-R-00085 Question and Answers as of 2-8-2021.docx DOCX document
6973GH-20-R-00085 Amendment 0013.pdf PDF
6973GH-20-R-00085 Amendment 0012.pdf PDF
6973GH-20-R-00085 Amendment 0011.pdf PDF
6973GH-20-R-00085 Amendment 0010.pdf PDF
6973GH-20-R-00085 Amendment 0009.pdf PDF
6973GH-20-R-00085 Amendment 0008.pdf PDF
6973GH-20-R-00085 Amendment 0007.pdf PDF
6973GH-20-R-00085 Amendment 0006.pdf PDF
Augusta Amendment 0001.pdf PDF
6973GH-20-R-00085 Amendment 0005.pdf PDF
6973GH-20-R-00085 Amendment 0004.pdf PDF
6973GH-20-R-00085 Amendment 0003.pdf PDF
Additional Site Pictures for SIR 6973GH-20-R-00085.docx DOCX document
6973GH-20-R-00085 Question and Answers 2.docx DOCX document
Pictures of existing electrical and control panels.docx DOCX document
6973GH-20-R-00085 Amendment 0002.pdf PDF
6973GH-20-R-00085 Question and Answers 1.docx DOCX document
6973GH-20-R-00085 Amendment 00001.pdf PDF
SIR 6973GH-20-R-00085.pdf PDF
Experience Information Form.doc DOC document
Contractors Release Form DOT F 4220.4.pdf PDF
AGS ASR HVAC Replacement in Augusta GA Statement of Work.pdf PDF
AGS ASR HVAC Replacement in Augusta GA Construction Drawings.pdf PDF
AGS ASR HVAC Replacement in Augusta GA Wage Determination.pdf PDF
Payment Bond.pdf PDF
Performance Bond.pdf PDF
AGS ASR HVAC Replacement in Augusta GA Technical Specifications.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & ANSWERS ON SIR 6973GH-20-R-00085

HVAC System Upgrade at the AGS ASR Facility located in Augusta, GA

1. Is there an existing DDC system that the new equipment will interfere with via Bacnet protocol?

a. The existing control system will be completely removed during this project. There will be nothing to interfere with.

2. Could you provide the length and breadth of the concrete pad?

a. A very rough estimate taken from an overhead photo measures about 12’ x 14’ for each unit. The actual dimensions will need to be field verified.

3. What is the distance from electrical panel DP? To the existing 2 units and also to the temporary unit?

a. Panel DP1 is on the opposite wall of the facility. This is roughly 50 linear feet away from each unit. The temporary unit will likely sit at least 55 – 60 feet away from the panel DP1.

4. Drawing E003 note 1 says to feed the temporary a/c from each of the ECU feeds as you replace them. E004 single line diagram says to feed the temporary a/c from panel DP-1 and when complete label the 40a breaker spare. Which drawing supersedes?

a. Both drawings are correct. The attempt is to phase out one unit at a time, while keeping a pad-mounted RTU and the temporary available at all times. In the first phase unit 2 and the temporary will run while unit 1 is removed. The second phase will involve the new unit 1 running along with the temporary serving as backup while unit 2 is removed. Once both primary units are replaced, the temporary unit will be removed. Then the 40A breaker used for connection to the temporary will be labeled as “spare”.