0 20 4010 Feet
Ü
R:\ Pr oje cts
\PC
Lo ca tor s\P
TS
I\L
AX
\b-sit efi nd ing s-L
AX
Ra da rTo we r.m xd
SITE UTILITY FINDINGS
LAX Radar Facility Los Angeles, CA
LEGEND
Electric U Panel
Vault Fiber Optic
Vault Line Type
Electric Electric (Empty Conduit) Electric (Overhead) Fiber Optic Ground Wire
2606 Foothill Boulevard, Suite G La Crescenta, CA. 91214
Note:
Depth to Utility Line in Inches is Shown When Available
ex. depth to Electric line at call out location:32"
ID Task Name Start Finish Duration Predecesso
1 AWP-2214 LAX RR Tower Replacement Engineering Design
Mon 3/12/18 Tue 2/26/19 252 days
2 Work Release Approval and Funding Mon 3/12/18 Mon 3/12/18 0 days 3 Site Surveys: Land Survey, Utilities, Soil Testing Mon 3/12/18 Fri 5/18/18 50 days 9 Engineering Packages - Complete Wed 4/4/18 Wed 6/13/18 51 days 10 90% Tower Package Wed 4/4/18 Fri 5/18/18 33 days 14 90% FAA Review Mon 5/21/18 Wed 6/13/18 18 days 18 75% Construction Design Mon 4/9/18 Fri 5/18/18 30 days 22 75% FAA Review Mon 5/21/18 Wed 6/13/18 18 days 25 Engineering Packages - In Progress Thu 6/14/18 Mon 9/10/18 63 days 26 Tower Package (100% and Final) Thu 6/14/18 Mon 9/3/18 58 days 27 100% Design Package Thu 6/14/18 Mon 8/13/18 42 days 28 100% Tower Design Thu 6/14/18 Mon 7/2/18 13 days 17 29 100% Intracheck Tue 7/3/18 Thu 7/5/18 3 days 28 30 Parsons 100% submittal Mon 8/13/18 Mon 8/13/18 0 days 31 100% FAA Review Tue 8/14/18 Mon 8/27/18 10 days 32 100% FAA Review Tue 8/14/18 Mon 8/27/18 10 days 30 33 100% FAA Comments Due to Parsons Mon 8/27/18 Mon 8/27/18 0 days 32 34 Final Design Tue 8/28/18 Mon 9/3/18 5 days 35 Final Design Tue 8/28/18 Thu 8/30/18 3 days 33 36 Final Intracheck Fri 8/31/18 Mon 9/3/18 2 days 35 37 Parsons Final Tower Submittal Mon 9/3/18 Mon 9/3/18 0 days 36 38 Platform Package (100% and Final) Tue 7/3/18 Mon 9/3/18 45 days 39 100% Platform Package Tue 7/3/18 Mon 8/13/18 29 days 40 100% Platform Design Tue 7/3/18 Fri 7/20/18 14 days 41 100% Intracheck Mon 7/23/18 Wed 7/25/18 3 days 40 42 Parsons 100% Platform submittal Mon 8/13/18 Mon 8/13/18 0 days 43 100% FAA Review Tue 8/14/18 Mon 8/27/18 10 days 42 44 100% FAA Review Tue 8/14/18 Mon 8/27/18 10 days 42 45 100% FAA Comments Due to Parsons Mon 8/27/18 Mon 8/27/18 0 days 44 46 Final Design Tue 8/28/18 Mon 9/3/18 5 days 47 Final Design Tue 8/28/18 Thu 8/30/18 3 days 45 48 Final Intracheck Fri 8/31/18 Mon 9/3/18 2 days 47 49 Parsons Final Submittal Mon 9/3/18 Mon 9/3/18 0 days 48 50 Construction Package (100% and Final) Fri 7/6/18 Mon 9/10/18 47 days 51 100% Design Package Fri 7/6/18 Mon 8/13/18 27 days 52 100% Design Fri 7/6/18 Mon 8/13/18 27 days 53 100% Design - Option A Tower Fri 7/6/18 Fri 7/13/18 6 days 24 54 100% Design - Option B Platform Mon 7/16/18 Fri 8/3/18 15 days 53 55 100% Intra/Inter-Check Mon 8/6/18 Wed 8/8/18 3 days 54 56 100% Construction Cost Estimate Mon 8/6/18 Mon 8/13/18 6 days 54 57 Parsons 100% Submittal Mon 8/13/18 Mon 8/13/18 0 days 58 100% FAA Review Tue 8/14/18 Mon 8/27/18 10 days 57 59 100% FAA Review Tue 8/14/18 Mon 8/27/18 10 days 60 100% FAA Comments Due to Parsons Mon 8/27/18 Mon 8/27/18 0 days 59 61 Final Package Tue 8/28/18 Mon 9/10/18 10 days 62 Final Design Tue 8/28/18 Mon 9/10/18 10 days 63 Final Design Tue 8/28/18 Wed 9/5/18 7 days 60 64 Final Intra/Inter-Check Thu 9/6/18 Mon 9/10/18 3 days 63 65 Parsons Final Submittal Mon 9/10/18 Mon 9/10/18 0 days 64 66 Procurement Wed 3/21/18 Fri 10/5/18 143 days 67 Announcement Release for Tower & Construction Wed 3/21/18 Tue 4/17/18 4 wks 68 Blue Butterfly Season Mon 7/2/18 Fri 8/31/18 9 wks 69 RFO Solicitation Release (aligned w/100% FAA
Review Comments) Wed 8/29/18 Wed 8/29/18 0 days 59FS+2 days
70 Prebid Telecon Thu 9/6/18 Thu 9/6/18 0 days 69FS+1 wk 71 Prebid Site Walk Wed 9/12/18 Wed 9/12/18 0 days 70FS+1 wk 72 Bids due Wed 9/26/18 Wed 9/26/18 0 days 71FS+2 wks 73 Bid Evaluation w/FAA Thu 9/27/18 Fri 10/5/18 7 days 72 74 Subcontract Award Fri 10/5/18 Fri 10/5/18 0 days 73 75 Preconstruction Activities Fri 10/12/18 Mon 1/7/19 61 days 76 Post Award Telecon Fri 10/12/18 Fri 10/12/18 0 days 74FS+1 wk 77 Tower Submittals Mon 10/15/18 Fri 10/26/18 2 wks 76 78 Manufacture Towers Mon 10/29/18 Fri 12/7/18 6 wks 77 79 Construction Submittals Mon 10/15/18 Fri 10/26/18 2 wks 76 80 Precon Meeting Mon 1/7/19 Mon 1/7/19 1 day 81 Construction (pending LAWA/FAA approval) Fri 11/16/18 Tue 2/26/19 73 days 82 Thanksgiving Moratorium Fri 11/16/18 Mon 11/26/18 7 days 83 Tower Delivered to Site Mon 12/10/18 Wed 12/12/18 3 days 82 84 Christmas Moratorium Fri 12/21/18 Mon 1/7/19 12 days 85 NTP Tue 1/8/19 Tue 1/8/19 1 day 84 86 Civil Site Work Wed 1/9/19 Tue 1/22/19 10 days 85 87 Foundation Work Wed 1/23/19 Tue 1/29/19 5 days 86 88 Tower Erection Wed 1/30/19 Tue 2/12/19 10 days 87 89 Grounding and Lightning Protection Work Wed 2/13/19 Tue 2/19/19 5 days 88 90 Electrical Work Wed 2/20/19 Tue 2/26/19 5 days 89 91 Final Inspection/CAI Tue 2/26/19 Tue 2/26/19 0 days 90 92 Demobilize Tue 2/26/19 Tue 2/26/19 0 days 90
3/12
8/13
8/27
9/3
8/13
8/27
9/3
8/13
8/27
9/10
8/29
9/6 9/12
9/26
10/5
10/12
2/26 2/26
6/186/25 7/2 7/9 7/167/237/30 8/6 8/138/208/27 9/3 9/109/179/2410/110/810/1510/2210/2911/511/1211/1911/2612/312/1012/1712/2412/311/7 1/141/211/28 2/4 2/112/182/25 3/4 3/113/183/25 4/1 4/8 4/154/224/29 5/6 5/135/205/27 6/3 6/106/176/24 7/1 7/8 7/157/227/29 8/5 8/128/198/26 9/2 9/9 9/169/239/3010/710/1410/2110/2811/411/1111/1811/2512/212/912/1612/2312/301/6 1/131/201/27 2/3 2/102/172/24 3/3 3/ July August September October November December January February March April May June July August September October November December January February March
Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
Deadline
Progress
Manual ProgressPARSONS
Work Release: AWP-2214 Project: LAX RR-1 Tower Replacement Date: Wed 8/8/18
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
E D
M
IS
S
U E
D
F O
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
CA
RCL
NS 07/09/2018
C
N S
T R
U C
T
IO
N
PROJECT ENGINEER
LOS ANGELES
LOS ANGELES INTERNATIONAL AIRPORT
REMOTE RECEIVER TOWER REPLACEMENT
RR
LAX-D-RR-G005
la x d r r g .d g n
TRANSPORTATION
OF
DEPARTMENT
D E P A R
TM
EN
T O
F TRANSPOR
T A T
IO
N
U N
IT
E
D STATES OF
AM
E R
IC
A
AVIA
T
I O
N
L A
R E
D E
F
TRAT
IO
N
SI
NI
M
D A
ADMINISTRATION
AVIATION
FEDERAL
DRAWING TITLEDRAWING NUMBER
GENERAL
FEDERAL AVIATION ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
ELECTRICAL
DEMOLITION
DEMOLITION PLAN
CIVIL
DRAWING INDEX
1406092
CHRISTINE TRUONG CLIFF RUSTAD
ENGINEERING SERVICES
INFRASTRUCTURE
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
DRAWING NUMBER DRAWING TITLE
REFERENCE DRAWINGS
WE-D-641-41129-rr1-19a
WE-D-641-41129-28a
WE-D-641-41129-27c
WE-D-641-41129-27b
WE-D-641-41129-27a
LOCATION: LOS ANGELES, CALIFORNIA
NOT TO SCALE
VICINITY MAP - LAX
REMOTE RECEIVER SITE RR-1 EQUIPMENT FLOOR PLAN
ATCT/RR-2 BLDG ELECTRICAL DETAILS
ATCT - REMOTE RECEIVER #2 PLOT PLAN & ANTENNA SELF SUPPORTING TOWER STRUCTURE
ATCT REMOTE RECEIVER TOPOGRAPHY MAP
REMOTE RECEIVER PLOT PLAN
COVER SHEET, DRAWING INDEX & VICINITY MAP
100% ENGINEERING DESIGN PACKAGE
(LAX RR-1 - OPTION B)
REMOTE RECEIVER TOWER REPLACEMENT
LOS ANGELES INTERNATIONAL AIRPORT
S A
F E
T Y
Q
U A L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORTSERVI
C E S
C
O N
T R
A C
T
RELEASED FOR:
100% SUBMITTAL-
FOR REVIEW PURPOSES ONLY
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
PTSI Managed Services Inc.
(310) 414-4050
880 Apollo Street
Suite 155
El Segundo, CA 90245
(310) 414-4088 (Fax)
08/13/2018
WR-2214
LAX-D-RR-G005
LAX-D-RR-D002
OPTION B
STRUCTURAL
LAX-D-RR-S007
LAX-D-RR-S006
LAX-D-RR-S005
PLATFORM CONFIGURATION
TOWER ELEVATION AND DETAILS
GENERAL NOTES
COVER SHEET, DRAWING INDEX & VICINITY MAP
LAX-D-RR-E037
LAX-D-RR-E036
LAX-D-RR-E035
LAX-D-RR-E034
LAX-D-RR-E033
LAX-D-RR-E032
LAX-D-RR-E031
LAX-D-RR-E030
LAX-D-RR-E029
LAX-D-RR-E028
LAX-D-RR-E027
LAX-D-RR-E026
LAX-D-RR-E025
LIGHTNING PROTECTION STUDY ANTENNA TOWER ZONE OF PROTECTION
PANEL SCHEDULE
LIGHTING DETAILS
BUILDING JUNCTION BOX DETAILS
TOWER ANTENNA JUNCTION BOX LAYOUT
ELECTRICAL DETAILS
CABLE SUPPORT ASSEMBLY ELEVATION VIEW
PLATFORM POWER PLAN
LIGHTNING PROTECTION SYSTEM DETAILS
GROUNDING & LIGHTNING PROTECTION PLANS
FLOOR PLAN
RF CABLE DUCTBANK PLAN
SYMBOLS LEGEND, NOTES AND ABBREVIATIONS
KG
MGR: ENGINEERING - LA A
LAX-D-RR-C010
LAX-D-RR-C009
LAX-D-RR-C008
LAX-D-RR-C007
LAX-D-RR-C006
SECTIONS AND DETAILS
NEW TOWER CONSTRUCTION SITE PLAN
GRADING PLAN
EXISTING SITE PLAN
CIVIL GENERAL NOTES AND ABBREVIATIONS
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:1
:4
P M
R lu p in
DATE
APPROVED
C
U s e r s
R lu p in
A p p
D a t a
L o c a l\ p w w o r k in g a w p e d m s r lu p in d m s la x d r r g .d g n
PROJECT SITE
lax-d-rr-g005.dgn 8/13/2018 3:14:46 PM
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
010’ 10’ 20’
SCALE: 1" = 10’
SCALE: 1" = 10’
REMOTE RECEIVER DEMOLITION PLAN
4 5
DEMOLITION NOTES:
7 9
1 2 3
S A
F E
T Y
Q
U A L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORTSERVI
C E S
C
O N
T R
A C
T
RELEASED FOR:
100% SUBMITTAL-
FOR REVIEW PURPOSES ONLY
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
PTSI Managed Services Inc.
(310) 414-4050
880 Apollo Street
Suite 155
El Segundo, CA 90245
(310) 414-4088 (Fax)
08/13/2018
WR-2214
EXISTING CHAIN LINK FENCE
INLET AND RETAINING WALL
EXISTING STORM DRAIN DROP
OPTION B
SPECIFICATIONS.
A WATERTIGHT SEAL IN ACCORDANCE WITH THE PROJECT
PATCH ALL PENETRATIONS INTO EXISTING CMU BUILDING WITH
12" BELOW FINISHED GRADE.
REMOVE EXISTING CONCRETE FOUNDATIONS TO A MINIMUM OF
SUPPORTS AS NECESSARY.
OVERHEAD TERMINATION BOARD. REMOVE FLEXIBLE TRAY AND
DISCONNECT ALL HELIAX AND JUMPER CABLES FROM THE
EQUIPMENT/MATERIALS AND DECOMMISSIONING.
VERIFICATION OF THE REMOVAL OF ALL GOVERNMENT OWNED
DECONSTRUCT EXISTING TOWER AND PLATFORM AFTER
TOWER.
RACEWAYS & WIRING, AND HELIAX CABLES FROM EXISTING
MICROWAVES, OBSTRUCTION LIGHTING SYSTEM, ASSOCIATED
LIGHTNING PROTECTION APPURTENANCES, GROUNDING WIRES,
REMOVE ALL ANTENNAS, AIR TERMINALS, JUMPER CABLES,
TO DECONSTRUCTION.
ACTIVE, VERIFY EXISTING TOWER IS DECOMMISSIONED PRIOR
AFTER NEW TOWER HAS BEEN COMMISSIONED AND DEEMED
ACTIVITIES.
TRENCHING SAFETY MEASURES DURING THEIR RESPECTIVE
SUBCONTRACTOR SHALL ADHERE TO OSHA EXCAVATION AND
AND ABBREVIATIONS.
SEE DRAWING LAX-D-RR-E025 FOR SYMBOLS, LEGEND, NOTES
DEMOLITION.
PROTECT ALL EXISTING UTILITIES NOT DEEMED FOR
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:4
:3
R lu p in
DATE
APPROVED
C
U s e r s
R lu p in
A p p
D a t a
L o c a l\ p w w o r k in g a w p e d m s r lu p in d m s la x d r r d .d g n
ASPHALT
FUEL TANK
GRAVELASPHALT
BUNKER
BUNKER
CONCRETE PAD
BUNKER
B U
N K
E R
ASPHALT
RCL
MAH 04/16/2018
C O
N S
T R
U C
T
IO
N la x d r r d .d g n
PROJECT ENGINEER
LOS ANGELES INTERNATIONAL AIRPORT
REMOTE RECEIVER TOWER REPLACEMENT
LAX-D-RR-D002
DEMOLITION PLAN
17’-4"x30’ CMU BUILDING
TOWER TO BUILDING
BRIDGE CONNECTING
REMOVE EXISTING ICE
1406092
CHRISTINE TRUONG CLIFF RUSTAD
ENGINEERING SERVICES
INFRASTRUCTURE
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
FOUNDATIONS (TYP 5)
REMOVE EXISTING ABANDONED
REMOVE EXISTING TOWER
KG
MGR: ENGINEERING - LA A
lax-d-rr-d002.dgn 8/13/2018 3:43:38 PM
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
GENERAL NOTES
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
ABBREVIATIONS
27.
29.
28.
S A
F E
T Y
Q
U A L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORTSERVI
C E S
C
O N
T R
A C
T
RELEASED FOR:
100% SUBMITTAL-
FOR REVIEW PURPOSES ONLY
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
PTSI Managed Services Inc.
(310) 414-4050
880 Apollo Street
Suite 155
El Segundo, CA 90245
(310) 414-4088 (Fax)
08/13/2018
WR-2214
OPTION B
30.
31.
32.
33.
34.
35.
36.
37.
TRANSFORMERXFMR
W/O WITHOUT
WITHW/
WIDEW
VARIABLEVAR
TYPICALTYP
TEMPORARYTEMP
TO BE DETERMINEDTBD
STAINLESS STEELSS
STORM DRAINSD
REMOTE TRANSMITTER RECEIVERRTR
REMOTE RECEIVERRR
REINFORCEMENT, REINFORCINGREINF
RESIDENT ENGINEERRE
ROADRD
RELATIVE COMPACTIONRC
R RADIUS
POWERPWR
POLYVINYL CHLORIDEPVC
POUNDS PER SQUARE INCHPSI
PP POWER POLE
PB PULL BOX
OVER HEAD WIREOHW
ON CENTEROC
NOT IN CONTRACTN.I.C
NEWN
MINIMUMMIN
MH MANHOLE
MAXIMUMMAX
LINEAR FOOTLF
JB JUNCTION BOX
INVERTINV
HH HANDHOLE
HIGH DENSITY POLYETHYLENEHDPE
HOT-DIPPED GALVANIZEDHDG
GEOR GEOTECHNICAL ENGINEER ON RECORD
GALVANIZEDGALV
FINISHED FLOORFF
FAA FEDERAL AVIATION ADMINISTRATION
EXISTINGEX
EACH WAYEW
EQUIPMENTEQUIP
EDGE OF PAVEMENTEP
ELEVATIONELEV
ELEC ELECTRICAL
EMERGENCY GENERATORE/G
EXISTING GRADEEG
EACHEA
EASTING, EXISTINGE
DIAMETER
CONTINUOUSCONT
CONCRETECONC
COMMUNICATIONCOMM
CMU CONCRETE MASONRY UNIT
CLEAR, CLEARANCECLR
CLASSCL
CENTERLINEC
BUILDINGBLDG
AOA AIRPORT OPERATIONS AREA
ALIGNMENTALIGN
AGGREGATEAGG
ABDN ABANDON
AGGREGATE BASEAB
FOR MATERIAL AND EQUIPMENT STORAGE.
SUBCONTRACTOR SHALL COORDINATE WITH RE FOR ADDITIONAL AREAS REQUIRED
APPROVAL PRIOR TO START OF CONSTRUCTION. DUE TO LIMITED SPACE ON SITE,
VEHICLES ON SITE TO BE SUBMITTED TO THE RE FOR REVIEW, COMMENT AND/OR
SHOWING PROPOSED LOCATIONS OF STAGING, STORAGE OF MATERIALS, AND
COURSE OF CONSTRUCTION. THE SUBCONTRACTOR SHALL PREPARE A PLAN
EXISTING VEHICULAR ACCESS TO SITE SHALL BE KEPT IN SERVICE DURING THE
THIS PROJECT.
LIABILITY, REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE OF WORK ON
INDEMNIFY AND HOLD THE CONTRACTOR AND FAA HARMLESS FROM ANY AND ALL
TO NORMAL WORKING HOURS AND THAT THE SUBCONTRACTOR SHALL DEFEND;
AGREES THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED
INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. SUBCONTRACTOR FURTHER
FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT,
THE SUBCONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY
STATE, AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.
DEVICES, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL,
THE SUBCONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL SAFETY
THE SUBCONTRACTOR’S SOLE EXPENSE.
INCOMPLETE OR INCORRECT WORK SHALL BE REDONE TO MEET REQUIREMENTS AT
THEIR OWN SATISFACTION PRIOR TO PERFORMING ANY WORK. ANY DEFICIENT,
THE SUBCONTRACTOR’S RESPONSIBILITY TO READ AND REVIEW THIS INFORMATION TO
PROJECT IS CONTAINED IN THE CONTRACT DOCUMENTS AND SPECIFICATIONS. IT IS
INFORMATION REGARDING THE CONSTRUCTION AND COMPLETION OF WORK FOR THIS
THE SUBCONTRACTOR IS HEREBY NOTIFIED THAT ESSENTIAL AND PERTINENT
PRIOR TO THE START OF CONSTRUCTION.
THE SUBCONTRACTOR SHALL SECURE ANY REQUIRED PERMITS FOR CONSTRUCTION
EXPENSE.
MONUMENTATION BY A LICENSED SURVEYOR AT THE SUBCONTRACTOR’S SOLE
SUCH POINTS SHALL BE REFERENCED AND REPLACED WITH APPROPRIATE
AND/OR BENCHMARKS THAT ARE DISTURBED OR DESTROYED BY CONSTRUCTION.
THE SUBCONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ANY MONUMENTATION
EXISTING AND AS APPROVED BY THE RE.
APPROVED OTHERWISE BY THE RE, TO A CONDITION EQUAL TO OR BETTER THAN THE
IMMEDIATELY REPAIRED AND/OR REPLACED BY THE SUBCONTRACTOR, UNLESS
STRUCTURES DAMAGED DURING THE COURSE OF CONSTRUCTION SHALL BE
EXISTING LINES THAT ARE NOT OF RECORD OR SHOWN ON PLANS. ANY UTILITIES OR
THE SITE, ALL UTILITY LINES, EXISTING PERMANENT STRUCTURES AND ANY OTHER
THE SUBCONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT WITHIN
TO PREVENT EXCAVATION DAMAGE TO UNDERGROUND UTILITIES.
SUBCONTRACTOR SHALL POTHOLE AND HAND EXCAVATE NEAR KNOWN UTILITY LINES
PROJECT IS COMPLETED AND ACCEPTED BY FAA.
BAGS, TEMPORARY DESILTING BASINS, DIKES, ETC.) UNTIL SUCH TIME THAT THE
SILTATION THAT RESULT FROM THEIR OPERATIONS BY APPROPRIATE MEANS, (SAND
PROTECT THE PROJECT AND ADJACENT PROPERTY FROM ANY EROSION AND
DOING ANY WORK. THE SUBCONTRACTOR SHALL ALSO TAKE NECESSARY STEPS TO
THESE PLANS, THE SUBCONTRACTOR SHALL REQUEST AN INTERPRETATION BEFORE
BUILT IN ACCORDANCE WITH THESE PLANS. IF THERE IS ANY QUESTION REGARDING
THE SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL SLOPES ARE
SPECIFICATIONS.
ALL FILL MATERIAL SHALL MEET REQUIREMENTS AS OUTLINED IN THE PROJECT
ELEVATIONS.
FINISHED GRADE SHALL BE SLOPED AT A UNIFORM SLOPE BETWEEN SPOT
SPECIFICATION 01 31 13 REGARDING PROJECT COORDINATION.
BE CONSIDERED TO BE DONE AT THE SUBCONTRACTOR’S RISK. REFER TO
SUCH DISCREPANCIES WITHOUT RESIDENT ENGINEER’S PRIOR AUTHORIZATION WILL
AUTHORIZATION. ANY WORK DONE BY THE SUBCONTRACTOR AFTER DISCOVERY OF
OF SUCH DISCREPANCIES, INCONSISTENCIES, OR AMBIGUITIES WITHOUT RE
SUBCONTRACTOR SHALL DO NO WORK BEFORE VERIFICATION AND AFTER DISCOVERY
CORRECT SUCH INCONSISTENCIES OR AMBIGUITIES IN WRITING. THE
IMMEDIATELY REPORTED TO THE RESIDENT ENGINEER (RE) IN WRITING, WHO WILL
INCONSISTENCIES OR AMBIGUITIES IN THE DRAWINGS OR SPECIFICATIONS SHALL BE
BETWEEN THE DRAWINGS AND SPECIFICATIONS AND SITE CONDITION OR ANY
ALL DIMENSIONS ARE TO BE VERIFIED IN THE FIELD. ANY DISCREPANCIES FOUND
MEASUREMENTS PRIOR TO CONSTRUCTION OF NEW WORK.
LOCATIONS AND ELEVATIONS OF EXISTING FEATURES TO BE VERIFIED BY FIELD
CONSTRUCTION SAFETY MANUAL, CURRENT VERSION.
SUBCONTRACTOR CONSTRUCTION SAFETY MANUAL SHALL COMPLY WITH TSSC IV
THE RE A MINIMUM OF 10 WORKING DAYS IN ADVANCE.
WORK FOR SHUTDOWN AND CUTOVER SHALL BE SCHEDULED AND COORDINATED WITH
PERFORMED BY FAA PERSONNEL AND NOT BY SUBCONTRACTOR. ALL PREPARATORY
SHUTDOWN AND CUTOVERS OF ENVIRONMENTAL AND ELECTRICAL SYSTEMS SHALL BE
INSTALLATION OF WATERTIGHT ASSEMBLY.
NEW SEALANT APPLICATION. SUBCONTRACTOR SHALL INFORM THE RE PRIOR TO
ARE WATER SEALED. PROVIDE WATERTIGHT ASSEMBLY FOR OPENINGS REQUIRING
SUBCONTRACTOR SHALL ENSURE THAT ALL WALL PENETRATIONS, NEW AND EXISTING
POWER SOURCE ONLY. ALL POWER TOOLS SHALL BE PRE-APPROVED BY THE RE.
ACTIVITIES. CONSTRUCTION TOOLS SHALL BE POWERED FROM THE TEMPORARY
THE SUBCONTRACTOR SHALL PROVIDE TEMPORARY POWER FOR ALL CONSTRUCTION
THE WORKERS AND RE.
THE SUBCONTRACTOR SHALL PROVIDE SANITARY TOILET FACILITIES WITH WATER FOR
VERIFY TEMPORARY UTILITY LOCATIONS AND USE AS PERMITTED BY RE.
SUBCONTRACTOR SHALL PROVIDE TEMPORARY UTILITIES DURING CONSTRUCTION.
SUBCONTRACTOR. CONSTRUCTION DEBRIS MUST BE REMOVED DAILY.
SHALL BE REMOVED FROM THE SITE DAILY. FAA DUMPSTER SHALL NOT BE USED BY
SHALL BE REMOVED BY SUBCONTRACTOR. ANY WASTE THAT CAN ATTRACT WILDLIFE
CLEAN AND FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. ALL DEBRIS
PRE-CONSTRUCTION MEETING. THE AREA AROUND THE DUMPSTERS SHALL BE KEPT
PROVIDED BY THE SUBCONTRACTOR WITHIN AREA DESIGNATED BY RE AT THE
ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE
BE REPAIRED OR REPLACED BY THE SUBCONTRACTOR.
REMOVE ALL CONSTRUCTION LIGHTING. ALL AREAS AND SURFACES DISTURBED SHALL
APPROVAL PRIOR TO SITE SETUP AND USE. UPON COMPLETION OF CONSTRUCTION,
SUBCONTRACTOR SHALL SUBMIT A LIGHTING PLAN TO PARSONS FOR REVIEW AND
LIGHTING NECESSARY TO ILLUMINATE THE AREA ADEQUATELY FOR SAFE WORK.
SUBCONTRACTOR SHALL PROVIDE, OPERATE AND MAINTAIN THE CONSTRUCTION
DAMAGE OR INTERFERE WITH ELECTRONICS EQUIPMENT.
WELDING OR HEAVY CONSTRUCTION IS PERMITTED INSIDE THE BUILDING AS IT MAY
SUBCONTRACTOR SHALL PROVIDE THEIR OWN POWER FOR THESE OPERATIONS. NO
AREAS AS DETERMINED BY THE RE AND TO BE CLEANED UP AT THE END OF THE DAY.
HEAVY CONSTRUCTION SHALL BE DONE OUTSIDE IN TEMPORARY CONSTRUCTION
WELDING REQUIRES A HOT WORK PERMIT. METAL CUTTING, GRINDING, WELDING AND
VERIFY ACCESS PATHWAYS WITH RE BEFORE START OF CONSTRUCTION.
WEIGHT TO MINIMIZE ACTIVITIES WITHIN THE FACILITY. SUBCONTRACTOR SHALL
ALL CONSTRUCTION MATERIAL SHALL BE PRE ASSEMBLED TO AN OPTIMUM SIZE AND
PRE-CONSTRUCTION CONDITION.
SUBCONTRACTOR SHALL RESTORE THIS AREA BACK TO ITS ORIGINAL
BE NEATLY STORED AND PROTECTED AT ALL TIMES. UPON COMPLETION OF WORK THE
SHALL BE DETERMINED AT THE PRE-CONSTRUCTION CONFERENCE. MATERIALS SHALL
LIMITED TO THE CONSTRUCTION STAGING AREA. SUBCONTRACTOR’S PARKING AREA
STAGING AND STORAGE OF CONSTRUCTION MATERIAL AND EQUIPMENT SHALL BE
BOTH INSIDE AND OUTSIDE THE BUILDING FROM DAMAGE.
EXISTING COMMUNICATION EQUIPMENT, ELECTRICAL AND MECHANICAL EQUIPMENT,
IT IS ABSOLUTELY MANDATORY THAT THE SUBCONTRACTOR PROTECT ALL NEW AND
(SITE AND BUILDINGS) AS NOT TO DISRUPT THE FUNCTIONS OF THIS FAA FACILITY.
SHALL USE GREAT CARE AND CAUTION WHILE WORKING WITHIN THE EXISTING FACILITY
CLOSELY COORDINATE WITH THE RE FOR ALL ACTIVITIES. THE SUBCONTRACTOR
CONSTRUCTION. SUBCONTRACTOR SHALL DEVISE A DETAILED WORK SCHEDULE AND
THE NORMAL ACTIVITIES WITHIN THE FACILITY WILL CONTINUE DURING
REPORT UNLESS NOTED OTHERWISE OR DEVIATION IS APPROVED BY THE RE.
SUBCONTRACTOR SHALL FOLLOW ALL RECOMMENDATIONS OF THE GEOTECHNICAL
THE SUBCONTRACTOR SHALL COORDINATE WITH RE FOR GATE ACCESS.
SECTION 09 97 00, SPECIAL COATINGS.
ALL HOT-DIPPED GALVANIZED METALS SHALL BE PAINTED PER SPECIFICATIONS
REPAIR DAMAGED GALVANIZATION WITH TWO COATS OF ZINC RICH PAINT.
TURNOVER OF TOWER ANTENNAS AND CABLES.
SUBCONTRACTOR SHALL COORDINATE WITH RE FOR PROPER REMOVAL AND
SEE DRAWING LAX-D-RR-D001 FOR SITE DEMOLITION REQUIREMENTS.
ACCORDANCE WITH SPECIFICATION SECTION 02 82 00.
SUBCONTRACTOR TO PROPERLY DISPOSE/REMOVE HAZARDOUS MATERIALS IN
ADVANCE OF THE WALKTHROUGH.
CONTAIN HAZARDOUS MATERIALS. INFORM THE RE MINIMUM OF 5 DAYS IN
SUBCONTRACTORS AND RE TO IDENTIFY THE AREAS IN THE FACILITY THAT
JOB SITE WALKTHROUGH TO BE CONDUCTED WITH ALL LOWER TIER
HAZARDOUS MATERIALS PROTOCOL WHEN WORKING AROUND THESE MATERIALS.
SUBCONTRACTOR TO FOLLOW SPECIFICATIONS 02 82 00 OR APPROVED
TOWERS CONTAIN HAZARDOUS MATERIALS (LEAD-BASED PAINT).
HAZARDOUS MATERIALS PROTECTION: THE WORK AREA, BUILDING AND EXISTING
BETWEEN DISSIMILAR METALS OUTSIDE OF EQUIPMENT ROOM WHERE IT APPLIES.
USE SACRIFICIAL LAYERS OF PROPER MATERIAL AT THE POINT OF CONNECTIONS
EQUIPPED WITH CONSTRUCTION CORES AND A CONSTRUCTION CORE REMOVAL KEY.
FAA REQUIREMENTS AND DISPLAY THE NUMBER PS1173X1175. THE LOCKS SHALL BE
EQUIPMENT AND USE. ALL PADLOCKS SHALL BE DYE STAMPED IN ACCORDANCE WITH
DEVICES, ETC. THE PADLOCKS SHALL BE SIZED APPROPRIATELY FOR THE PARTICULAR
CABINETS, PANELS, DISCONNECT SWITCHES, TOWER HATCH DOORS, ANTI-CLIMB
PADLOCKS FOR EACH LOCKABLE DEVICE, EQUIPMENT, ETC. THIS INCLUDES EXTERNAL
THE SUBCONTRACTOR SHALL PROVIDE 7-PIN REMOVABLE CORE CORMAX BEST LOCK
DISTURB OR DAMAGE EXISTING WORK.
WHERE NEW WORK IS TO BE CONNECTED TO EXISTING WORK, EXERCISE CARE NOT TO
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:2
R lu p in
DATE
APPROVED
C
U s e r s
R lu p in
A p p
D a t a
L o c a l\ p w w o r k in g a w p e d m s r lu p in d m s la x d r r c .d
MAH 04/16/2018
C O
N S
T R
U C
T
IO
N la x d r r c .d g n
PROJECT ENGINEER
LOS ANGELES INTERNATIONAL AIRPORT
REMOTE RECEIVER TOWER REPLACEMENT
LAX-D-RR-C006
ENGINEERING SERVICES
INFRASTRUCTURE
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
1406092
CHRISTINE TRUONG CLIFF RUSTAD
CIVIL GENERAL NOTES AND ABBREVIATIONS
KG
lax-d-rr-c006.dgn 8/13/2018 3:21:37 PM
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
010’ 10’ 20’
SCALE: 1" = 10’
EXISTING CHAIN LINK FENCE
INLET AND RETAINING WALL
EXISTING STORM DRAIN DROP
S A
F E
T Y
Q
U A L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORTSERVI
C E S
C
O N
T R
A C
T
RELEASED FOR:
100% SUBMITTAL-
FOR REVIEW PURPOSES ONLY
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
PTSI Managed Services Inc.
(310) 414-4050
880 Apollo Street
Suite 155
El Segundo, CA 90245
(310) 414-4088 (Fax)
08/13/2018
WR-2214
SCALE: 1" = 10’
REMOTE RECEIVER SITE PLAN
OPTION B
LEGEND:
NOTES:
GROUND WIRE
FIBER OPTIC
ELECTRIC (OVERHEAD)
ELECTRIC/COMM (EMPTY CONDUIT)
ELECTRIC
2.
1.
COAST LOCATORS.
BASED ON A UTILITY LOCATE PERFORMED BY PACIFIC
EXISTING UTILITIES AND UNDERGROUND FEATURES ARE
TOPOGRAPHIC SURVEY PERFORMED.
EXISTING SITE FEATURES ARE APPROXIMATE. NO
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:2
R lu p in
DATE
APPROVED
C
U s e r s
R lu p in
A p p
D a t a
L o c a l\ p w w o r k in g a w p e d m s r lu p in d m s la x d r r c .d g n
OH
O H
O H
O H
O H
O H
O H
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
GRAVELASPHALT
BUNKER
BUNKER
CONCRETE PAD
BUNKER
B U
N K
E R
ASPHALT
RCL
MH 04/16/2018
C O
N S
T R
U C
T
IO
N la x d r r d .d g n
PROJECT ENGINEER
LOS ANGELES INTERNATIONAL AIRPORT
LAX-D-RR-C007
17’-4"x30’ CMU BUILDING
1406092
MGR: ENGINEERING - LA
CHRISTINE TRUONG CLIFF RUSTAD
ENGINEERING SERVICES
INFRASTRUCTURE
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
EXISTING SITE PLAN
EXISTING TOWER
FOUNDATIONS (TYP 5)
EXISTING ABANDONED
TOWER TO BUILDING
BRIDGE CONNECTING
EXISTING ICE
F O
F lax-d-rr-c007.dgn 8/13/2018 3:21:38 PM
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
010’ 10’ 20’
SCALE: 1" = 10’
CHAIN LINK FENCE
PANEL A
(E) POWER
S A
F E
T Y
Q
U A L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORTSERVI
C E S
C
O N
T R
A C
T
RELEASED FOR:
100% SUBMITTAL-
FOR REVIEW PURPOSES ONLY
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
PTSI Managed Services Inc.
(310) 414-4050
880 Apollo Street
Suite 155
El Segundo, CA 90245
(310) 414-4088 (Fax)
08/13/2018
WR-2214
SCALE: 1" = 10’
REMOTE RECEIVER GRADING PLAN
OPTION B
ROCK SLOPE PROTECTION.
INLET AND REPLACE WITH CALTRANS NO. 2
OF GRAVEL AND SAND FROM PERIMETER OF
CLEAR INLET AND REMOVE 3’ WIDE X 1’ DEEP
EXISTING SD DROP INLET.
LEGEND:
NOTES:
GROUND WIRE
FIBER OPTIC
ELECTRIC (OVERHEAD)
ELECTRIC/COMM (EMPTY CONDUIT)
ELECTRIC
COAST LOCATORS.
BASED ON A UTILITY LOCATE PERFORMED BY PACIFIC
EXISTING UTILITIES AND UNDERGROUND FEATURES ARE
STORM DRAIN DROP INLET.
UNIFORM DRAINAGE FROM THE SITE TO THE EXISTING
TO REVIEW SITE CONDITIONS AND PROVIDE POSITIVE
TOPOGRAPHIC SURVEY PERFORMED. SUBCONTRACTOR
EXISTING SITE FEATURES ARE APPROXIMATE. NO
2.
1.
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:4
:2
R lu p in
DATE
APPROVED
C
U s e r s
R lu p in
A p p
D a t a
L o c a l\ p w w o r k in g a w p e d m s r lu p in d m s la x d r r c .d
C O
N S
T R
U C
T
IO
N la x d r r c .d g n
PROJECT ENGINEER
LOS ANGELES INTERNATIONAL AIRPORT
REMOTE RECEIVER TOWER REPLACEMENT
LAX-D-RR-C008
ENGINEERING SERVICES
INFRASTRUCTURE
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
1406092
CHRISTINE TRUONG CLIFF RUSTAD
GRADING PLAN
OH
MGR: ENGINEERING - LA A
O H
O H
O H
O H
O H
O H
O
ROOM
E/G
EQUIPMENT
GRAVELASPHALT
STRUCTURE
(E) TOWER BRIDGE
BUNKER
BUNKER
CONCRETE PAD
BUNKER
B U
N K
E R
ASPHALT
DRAIN
GRADE TO
D R
A
IN
G R
A D
E
T
O
F O
F lax-d-rr-c008.dgn 8/13/2018 3:45:30 PM
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
010’ 10’ 20’
SCALE: 1" = 10’
CHAIN LINK FENCE
PANEL A
(E) POWER
SCALE: 1" = 10’
REMOTE RECEIVER SITE PLAN
NOTES:
1 4 6 7 8 9 10
S A
F E
T Y
Q
U A L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORTSERVI
C E S
C
O N
T R
A C
T
RELEASED FOR:
100% SUBMITTAL-
FOR REVIEW PURPOSES ONLY
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
PTSI Managed Services Inc.
(310) 414-4050
880 Apollo Street
Suite 155
El Segundo, CA 90245
(310) 414-4088 (Fax)
08/13/2018
WR-2214
A
C010
C010
OPTION B
FENCING.
CLEAN, PREP AND APPLY SLURRY SEAL TO ALL ASPHALT SURFACES WITHIN SITE
SEE DRAWING LAX-D-RR-D002 FOR DEMOLITION REQUIREMENTS.
CAP ALL CONDUITS ABANDONED IN PLACE.
FAA)
REMOVE ALL OBSOLETE MATERIALS AND DISCARD THEM PROPERLY. (COORDINATE WITH
EXISTING GRADE AND ADJACENT SURFACE MATERIAL.
LIFTS. COMPACT THE SOIL TO 95% AND PATCH THE AFFECTED AREA TO MATCH
BACKFILL ALL HOLES CREATED BY CONSTRUCTION AND DEMOLITION IN 8" LOOSE
HAS BEEN CONCSTRUCTED, COMMISSIONED AND DEEMED ACTIVE.
DEMOLISH AND PROPERLY RECYCLE EXISTING TOWER SYSTEM AFTER NEW TOWER
PROVIDE CONDUITS AS SHOWN IN DUCT BANK ROUTING FROM TOWER MH TO NEW JB.
PER DETAILS AND SPECIFICATIONS.
REPAVE ASHPHALT SURFACE REMOVED OR DAMAGED DURING TRENCH CONSTRUCTION
SELF-SUPPORTING TOWER, DESIGNED BY OTHERS.
PROVIDE CONCRETE FOUNDATION (SEE STRUCTURAL DRAWINGS) FOR NEW
EQUIPMENT ROOM AND NEW TOWER.
PROVIDE TWO (2) 48"x48"x42" PREFABRICATED HANDHOLES LOCATED BETWEEN
VERIFY SITE UTILITIES BEFORE START OF EXCAVATION.
COORDINATE WITH PARSONS RE FOR TEMPORARY ACCESS ROUTE AS NEEDED AND
PRE-CONSTRUCTION CONFERENCE) AND TEMPORARY FACILITIES. SUBCONTRACTOR TO
PREPARE THE SITE FOR NEW CONSTRUCTION AND SETUP STAGING AREA (TBD AT
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:4
:4
P
M R lu p in
DATE
APPROVED
C
U s e r s
R lu p in
A p p
D a t a
L o c a l\ p w w o r k in g a w p e d m s r lu p in d m s la x d r r c .d
O H
O H
O H
O H
O
EQUIPMENT
GRAVELASPHALT
FOUNDATIONS (TYP 5)
(E) ABANDONED
STRUCTURE
(E) TOWER BRIDGE
BUNKER
BUNKER
CONCRETE PAD
BUNKER
B U
N K
E R
ASPHALT
RCL
MAH 04/16/2018
C O
N S
T R
U C
T
IO
N la x d r r c .d g n
PROJECT ENGINEER
LOS ANGELES INTERNATIONAL AIRPORT
REMOTE RECEIVER TOWER REPLACEMENT
ENGINEERING SERVICES
INFRASTRUCTURE
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
1406092
CHRISTINE TRUONG CLIFF RUSTAD
LOS ANGELES
LAX-D-RR-C009
CA
RR
34’-6"
TOWER
NEW ANTENNA
NEW TOWER CONSTRUCTION SITE PLAN
FOUNDATION
NEW TOWER
HH #1
DUCTBANK
PROPOSED
HH #2
SEE
(4 TOTAL)
NEW BOLLARDS
KG
MGR: ENGINEERING - LA A
F O
F lax-d-rr-c009.dgn 8/13/2018 3:46:41 PM
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
S A
F E
T Y
Q
U A L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORTSERVI
C E S
C
O N
T R
A C
T
RELEASED FOR:
100% SUBMITTAL-
FOR REVIEW PURPOSES ONLY
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
PTSI Managed Services Inc.
(310) 414-4050
880 Apollo Street
Suite 155
El Segundo, CA 90245
(310) 414-4088 (Fax)
08/13/2018
WR-2214
SCALE: NOT TO SCALE
SAMPLE MANHOLE ID PLATE E
SCALE: 1" = 1’-0"
TRENCH CROSS SECTION A
C009
LOCATIONS
IN ALL BOLT HOLE
ANCHOR BOLTS
3"
2" 1
9/16"X13/16"
FOR ALL HOOKS
SADDLE LOCKS
BE NONMETALLIC
CABLE RACKING SHALL
SHOWN FOR CLARITY.
ALL SADDLE LOCKS NOT
WELD NAME PLATE
(SPRING ASSIST)
COVER WITH LOCKING LATCH
GALVANIZED DIAMOND PLATE
FAA-1
COMM
FAA
EACH SIDE
1-1/2" DIA.
(2) LIFT HOLE
6"
3’ -4
" 3’-4"
APPROVED EQUAL
BASE NO. 233-L OR
UTILITY VAULT COMPANY
INSERT (4 PLCS)
(4) 3/4" DIA. LIFT
1 EACH SIDE
PULLING IRON
(NOT USED)
ROD KNOCKOUTS
(2) 1" DIA. GROUND
H-10 LOADING HANDHOLE
48"
SCALE: NOT TO SCALE
CABLE SUPPORT RACK C
SCALE: NOT TO SCALE
BOLLARD DETAIL D
C009
OPTION B
SCALE: NOT TO SCALE
TOWER HANDHOLE DETAILB
FINISHED GRADE
SAND BEDDING
BACKFILL
95% COMPACTED
1’-11"
NOTES:
GRADE
TAPE 12" BELOW
MAGNETIC WARNING
OCCURS
4" ASPHALT WHERE
4" GRAVEL OR
CABLES EACH, (SEE NOTE 2)
CONTAINING HELIAX
4" PVC COATED RGSC
4/0 AWG BARE COPPER GROUND CABLES DO NOT RUN THROUGH HANDHOLES.
REQUIREMENTS.
MINIMUM 3" CLEARANCE SURROUNDING EACH CONDUIT SHALL BE MAINTAINED FOR COMPACTION
BETWEEN POWER AND RF CONDUITS. POWER CONDUIT DOES NOT RUN THROUGH HANDHOLES.
SEE C009 FOR QUANTITY OF CONDUIT FOR EACH DUCT SECTION. MAINTAIN 12" SEPARATION
SLOPE DUCT BANKS TOWARDS MANHOLES 3" PER 100’ MINIMUM.
4.
3.
2.
1.
(SEE NOTE 4)
BARE COPPER
STRANDED
4/0 AWG
(SEE NOTE 2)
RGSC (POWER)
1" PVC COATED
FOUNDATION
TOWER
BOLLARDØ 6"
ENCASEMENT
CONCRETE
MATERIAL
EXISTING ADJACENT
GRADE TO MATCH
CONCRETE CAP
YELLOW PAINTED
REFLECTIVE TAPE
4" WIDE
2’-0"
2500 PSI CONCRETE.
GRADE B FILLED WITH
STRONG ASTM A 53
GALVANIZED PIPE EXTRA
NOMINAL HOT DIPPED
YELLOW PAINTED 6"
MIN
1’-9"
6"
STEEL PLATE
3"x6"x1/4" STAINLESS
1/2 " HIGH CHARACTERS
(HANDHOLE NUMBER)
1" HIGH LETTERS
FLUSH TYPE ANCHOR
INTO SELF DRILLING
SCREWS (WASHER HEAD)
1/4" STAINLESS STEEL (316)
COMM
FAA
FAA-1
STEEL PLATE SECURED TO THE COVER
ON A 3" x 6" x 1/4" THICK STAINLESS
ENGRAVED IN THE COVER, IMPRINTED
AS SHOWN. LETTERS 3/4" HIGH
EACH HANDHOLE/PULL BOX IDENTIFIED
AS APPROPRIATE
LABEL "FAA COMM"
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:2
R lu p in
DATE
APPROVED
C
U s e r s
R lu p in
A p p
D a t a
L o c a l\ p w w o r k in g a w p e d m s r lu p in d m s la x d r r c .d
RC
C O
N S
T R
U C
T
IO
N la x d r r c .d g n
PROJECT ENGINEER
LOS ANGELES INTERNATIONAL AIRPORT
REMOTE RECEIVER TOWER REPLACEMENT
LAX-D-RR-C010
ENGINEERING SERVICES
INFRASTRUCTURE
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
1406092
CHRISTINE TRUONG CLIFF RUSTAD
SECTIONS AND DETAILS
MGR: CONSTRUCTION - LA
3’-10"
MIN.
1’-0"
M
IN
M
IN
MIN
3"
M
IN
MIN (TYP)
3" lax-d-rr-c010.dgn 8/13/2018 3:21:40 PM
GENERAL NOTES:
SPLICES IN REINFORCEMENT SHALL NOT BE ALLOWED UNLESS OTHERWISE INDICATED.
TO ASTM A615, GRADE 60 WITH A MINIMUM YIELD STRENGTH OF FY = 60000 PSI.
3. ALL REINFORCEMENT SHALL BE NEW BILLET STEEL, DEFORMED BARS, CONFORMING
LATEST EDITION.
STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES (ACI318),
BARS, UNLESS NOTED OTHERWISE, SHALL BE IN ACCORDANCE WITH THE MANUAL OF
2. REINFORCING STEEL - ALL DETAILING, FABRICATION AND ERECTION OF REINFORCING
AT 28 DAYS (NORMAL WEIGHT).
WITH ACI AND SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF F’ C =4000 PSI
AND ACI 318. ALL CAST-IN-PLACE STRUCTURAL CONCRETE SHALL BE IN ACCORDANCE
1. CONCRETE CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF ACI 301
C. REINFORCED CONCRETE
C. REINFORCED CONCRETE CONT.
2. THE DIRECTION OF GRATING SPAN IS SHOWN ON THE DRAWINGS AS .
FASTENERS WHICHEVER IS LESS.
GALVANIZED MECHANICAL FASTENERS AT 1’-0" ON CENTER MAXIMUM OR A MINIMUM OF 2
ATTACHED TO SUPPORT FRAMING AND SIDE EDGES OF ADJOINING PIECES WITH HOT DIPPED
1. GRATING MATERIAL SHALL BE FIBERGLASS REINFORCED PLASTIC (FRP). GRATING SHALL BE
G. GRATING
ACCORDANCE WITH THE REQUIREMENTS SPECIFIED HEREIN.
F. THE MINIMUM COATING SHALL BE HOT DIPPED GALVANIZED AND WITH FIELD REPAIRS IN
ELECTRICAL DRAWINGS.
THE TOWER MATERIALS. THE GROUNDING AND CONDUIT SHALL BE PLACED AS SHOWN ON THE
E. GROUNDING - THE MATERIALS USED FOR THE GROUNDING SYSTEM SHALL BE COMPATIBLE WITH
CUBIC FOOT.
STRUCTURAL BACKFILL MUST HAVE A MINIMUM COMPACTED UNIT WEIGHT OF 100 POUNDS PER
DENSITY AT OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. ADDITIONALLY,
4. THE BACKFILL SHALL BE PLACED IN 8" LAYERS AND COMPACTED TO 95% OF MAXIMUM DRY
STATE OF CALIFORNIA.
OF THE GEOTECHNICAL REPORT AND SIGNED AND SEALED BY A REGISTERED ENGINEER IN THE
3. FOUNDATION FOR THE TOWER SHALL BE DESIGNED IN ACCORDANCE WITH THE RECOMMENDATION
SHOWING DESIGN OF SOIL AND RETENTION SYSTEM PREPARED BY P.E.
EXCEED 4 FEET, SUBCONTRACTOR SHALL SUBMIT A DETAILED PLAN TO THE RE FOR APPROVAL
AND COMPACTION IN ACCORDANCE WITH OSHA SAFETY MANUALS. IN TRENCHES WHERE DEPTH
2. COORDINATE, MAINTAIN AND PROVIDE A SAFE ENVIRONMENT DURING TRENCHING, EXCAVATION, OBSTRUCTIONS.
EXCAVATION AND IDENTIFY AND PROTECT ANY EXISTING UNDERGROUND UTILITIES, LINES OR
1. ESTABLISH BENCHMARKS ON SURROUNDING STRUCTURES AND PAVEMENT PRIOR TO ANY
D. EXCAVATION AND FOUNDATION
".4
3 10. MAXIMUM AGGREGATE SIZE SHALL NOT EXCEED
9. FIELD WELDING IS PROHIBITED ON REINFORCING STEEL AND EMBEDMENTS.
SIDES.
EVENT THAT THE SIDES DO NOT REMAIN VERTICAL THE SUBCONTRACTOR SHALL FORM THE
PLACEMENT. SIDES OF EXCAVATION SHALL BE ROUGH AND FREE OF LOOSE CUTTINGS. IN THE
8. LOOSE MATERIAL SHALL BE REMOVED FROM BOTTOM OF EXCAVATION PRIOR TO CONCRETE
THE FOUNDATION.
MATERIALS AND OTHER OCCURENCES WHICH MAY DECREASE THE STRENGTH OR DURABILITY OF
7. CONCRETE SHALL BE PLACED IN A MANNER THAT WILL PREVENT SEGREGATION OF CONCRETE
SOIL.
6. CONCRETE SHALL BE PLACED AGAINST UNDISTURBED SOIL WHEN FOUNDATION IS BEARING ON
PER FOOT. PROVIDE A FLOATED FINISH.4
1 OUTSIDE EDGE A MINIMUM OF
5. TOP OF FOUNDATION EXPOSED TO WEATHER SHALL BE SLOPED FROM THE CENTER TO THE
" MINIMUM.4
3" X 4
3 4. EXPOSED EDGES OF CONCRETE SHALL BE CHAMFERED
"2 1 c. CONCRETE NOT PERMANENTLY EXPOSED TO GROUND OR WEATHER - 1
b. CONCRETE IN CONTACT WITH GROUND OR EXPOSED TO WEATHER - 2"
a. CONCRETE CAST AGAINST GROUND - 3"
BARS SHALL BE AS FOLLOWS:
3. CONCRETE COVER - CONCRETE CLEAR COVER FOR REINFORCING
STIFFENER PLATES SHALL BE WELDED ALL AROUND.
7. COLUMN BASE PLATES, CAP PLATES, BEARING PLATES, CONNECTION PLATES, AND
AFTER TORQUING THE STRUCTURAL BOLT.
6. ALL BOLTS INCLUDING ANCHOR BOLTS SHALL HAVE LOCKING/JAM NUTS INSTALLED
".8
3 DIAMETER SHALL BE
ASTM A153 HIGH STRENGTH BOLTS UNLESS OTHERWISE NOTED. THE MINIMUM BOLT
5. ALL BOLTS SHALL BE ASTM A325 HOT DIP GALVANIZED IN ACCORDANCE WITH
HOT DIP GALVANIZED IN ACCORDANCE WITH ASTM A153.
EFFORT OF A MAN USING AN ORDINARY SPUD WRENCH. ANCHOR BOLTS SHALL BE
S5 GRADE 105 AND SHALL BE TIGHTENED TO A SNUG TIGHT CONDITION (FULL
4. ANCHOR BOLTS SHALL MEET OR EXCEED THE REQUIREMENTS OF ASTM F1554-S2,
CONFORM TO ASTM A36, Fy=50 KSI EXCEPT AS OTHERWISE NOTED.
3. STRUCTURAL STEEL FOR WIDE FLANGE, PLATES, ANGLES, CHANNELS SHALL
ANNEX A1.
ASTM A-780 USING ZINC-BASED ALLOYS WITH SURFACE PREPARATION PER
FIELD APPLIED GALVANIZING FOR REPAIRS SHALL MEET THE REQUIREMENTS OF
WELDING IS NOT PERMITTED AFTER THE APPLICATION OF THE GALVANIZING.
ASTM STANDARD A123. THE GALVANIZING SHALL BE APPLIED AFTER FABRICATION.
2. ALL STRUCTURAL STEEL SHALL BE HOT DIP GALVANIZED IN ACCORDANCE WITH
CONSTRUCTION THEN THE PROVISIONS OF AISC WILL GOVERN.
NOT INCLUDE PROVISIONS OR REQUIREMENTS THAT WILL FACILITATE THE STEEL
ARISE BETWEEN THE AISC AND TIA-222-G-4. IF HOWEVER THE TIA-222-G-4 DOES
THE PROVISIONS OF TIA-222-G-4 SHALL GOVERN IN THE EVENT THAT CONFLICTS
TO SUBSTANTIATE REQUIRED PROPERTIES AND ACTUAL MODULUS OF ELASTICITY.
TUBING OF ANY KIND IS NOT ALLOWED. SUBMIT CERTIFIED MILL TEST REPORTS
FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS". STEEL
ACCORDANCE WITH THE 14th EDITION OF AISC "SPECIFICATIONS FOR DESIGN,
1. ALL STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN
B. STRUCTURAL STEEL
9. THE GENERAL NOTES ARE TO BE READ IN CONCERT WITH THE SPECIFICATIONS.
BE AS PER THE MANUFACTURERS INSTRUCTIONS.
8. THE STORAGE, HANDLING, AND INSTALLATION OR ALL PROPRIETARY PRODUCTS SHALL
TEMPORARY STRUCTURES, SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR.
7. THE DESIGN AND INSTALLATION OF ALL FORMWORK, FALSEWORK, AND ANY OTHER
MINIMUM REQUIREMENTS.
TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS EXCEPT FOR
ON PLANS, SECTIONS, AND DETAILS. NOTES AND DETAILS ON DRAWINGS SHALL
INCONSISTENCIES. ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE SHOWN
ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES OR
ELEVATIONS, AND CONDITIONS PRIOR TO STARTING CONSTRUCTION. THE RESIDENT
6. THE SUBCONTRACTOR SHALL CHECK AND VERIFY ALL EXISTING DIMENSIONS,
FOR ALL INSPECTIONS.
WELDING, ETC. SUBCONTRACTOR MOST PROVIDE AND COORDINATE ACCESS
LADBS CERTIFIED DEPUTY INSPECTOR TO INSPECT CONCRETE, STEEL,
DEPARTMENT OF BUILDING AND SAFETY (LADBS) PRIOR TO CONSTRUCTION.
5. SUBCONTRACTOR SHALL OBTAIN ALL APPLICABLE PERMITS FROM LOS ANGELES
CONCENTRATED: 500 LBS/ONE SQ. FT.
UNIFORM: 100 PSF
4. PLATFORM AND STAIRS LIVE LOAD REQUIREMENT
c. SEISMIC Ss=1.842g, S1=0.651g - AS PER ASCE 7-16
b. WIND SPEED = 101 MPH AS PER ASCE 7-16
a. RISK CATEGORY: III
3. DESIGN CRITERIA:
2. WIND EXPOSURE CATEGORY C.
AS PER ASCE 7-16.
EQUIVALENT LATERAL FORCE PROCEDURE (METHOD 1). SITE CLASS D,
1. SEISMIC ANALYSIS PROCEDURE METHOD SHALL BE IN ACCORDANCE WITH
A. CODE AND DESIGN REQUIREMENTS
AB
LAX-D-RR-S005
NG
GENERAL NOTES
REMOTE RECEIVER TOWER REPLACEMENT
LOS ANGELES INTERNATIONAL AIRPORT
PN
PROJECT ENGINEER
FOR OFFICIAL USE ONLY
MGR: ENGINEERING
H
G
F
E
D
C
B
A
:3
:5
A n g a in e s
L A
X
D
R R S .d g n
1234567
H
G
F
E
D
34567 2 1
A
B
C
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
REV DESCRIPTION JCN
DATE
REDLINE
APVD
DATE
APPROVED
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
RELEASED FOR:
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
LOS ANGELES CA
817.834.2165 (Fax)
817.759.4820
Fort Worth, TX. 76137
Suite 228
4500 Mercantile PL Dr.
PTSI Managed Services Inc.
INFRASTRUCTURE
ENGINEERING SERVICES
1406092
LAX RR - DESIGN "B"RELEASED FOR:
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
FOR REVIEW PURPOSES ONLY
100% SUBMITTAL - 07/13/2018
AB
RDS
BASE PLATE
(2) NUTS ABOVE
BASE PLATE
NUT BELOW
(1) LEVELING
SURFACE
FOUNDATION
BASE PLATE
D
S006 NOT TO SCALE
TYPICAL LEG INSTALLATION
LAX-D-RR-S006
GENERAL NOTES:
04’ 4’ 8’
SCALE: 1/4" = 1’-0"
GRADE
APPROXIMATE
TOWER ELEVATION AND DETAILS
REMOTE RECEIVER TOWER REPLACEMENT
LOS ANGELES INTERNATIONAL AIRPORT
PN
(TYP) AS REQUIRED
REINFORCEMENT
FOUNDATION SIZE: AS REQUIRED
NON SHRINK GROUT
COLUMN
PLATFORM STEEL
S006 NOT TO SCALE
FOUNDATION ELEVATION
T
Y P
S006
B
S006
A
S006 SCALE: 1/4" = 1’-0"
PLATFORM FOUNDATION AND STAIRWAY PLAN
10’-0"3’-0"
U P
U P
(TYP.)
S T
A
IR
W A
Y
C L
T
Y P
A
S006 SCALE: 1/4" = 1’-0"
TOWER ELEVATION
FOR CLARITY
NOT SHOWN
STAIRWAY
R E
Q U
IR
E D
D E
P T
S
T
Y P
G R
A D
E
B
O V
E
GRADE 0-0"
APPROXIMATE
AS REQUIRED
LATERAL BRACING
B
S006 SCALE: 1/4" = 1’-0"
TOWER ELEVATION
4.
3.
2.
1.
GRADE 0-0"
APPROXIMATE
G R
A D
E
O V
E
EL 20’-6" AGL
TOP OF PLATFORM
D
S006
R E
Q U
IR
E D
D E
P
T
Y P
ON THIS DRAWING (TYP.)
BY DESIGN. SEE GENERAL NOTES
STEEL COLUMN AS REQUIRED
AS REQUIRED
LATERAL BRACING
FOR CLARITY
NOT SHOWN
STAIRWAY
EL 20’-6" AGL
TOP OF PLATFORM
30’-0"
(TYP)
D E
S
IG
N R
E Q
U
IR
Y
D E
P
ON THIS DRAWING
SEE GENERAL NOTES 3
HAND RAILS
15’-0"
ON THIS DRAWING
SEE GENERAL NOTES 3
HAND RAILS
15’-0"
10’-3 5/8"
15’-0"
30’-0"
D
S006
ON GEOTECHNICAL REPORT
SOIL CRITERIA SHALL BE BASED
(SIZE AS REQUIRED BY DESIGN)
CONCRETE MAT FOUNDATION
S006
(TYP)
REQUIRED BY DESIGN
CONCRETE EDGE AS
REQUIRED BY DESIGN
FOUNDATION SIZE AS 3
S006
S006
C
(TYP)
REQUIRED BY DESIGN
CHEVRON BRACING AS
DURING DESIGN BY THE SUBCONTRACTOR.
FOUNDATION SIZE SHOWN ARE APPROXIMATE AND SHALL BE FINALIZED
TO BE DESIGNED AND FABRICATED BY THE SUBCONTRACTOR.
PROPOSED STEEL PLATFORM, STAIRWAY, HANDRAILS AND CONNECTIONS
TO ANY DESIGN, FABRICATION AND SUBCONSTRUCTION.
FIELD MEASURE AND VERIFY THE EXISTING CONDITION AND DIMENSION PRIOR
REFER TO SHEET S001 FOR CONCRETE AND STEEL MATERIAL PROPERTIES.
C
S006 SCALE: 1/4" = 1’-0"
TOWER ELEVATION
R E
Q U
IR
E D
D E
P
T
Y P
G R
A D
E
O V
E
GRADE 0-0"
APPROXIMATE
EL 20’-6" AGL
TOP OF PLATFORM
15’-0"
D
S006
(TYP)
REQUIRED BY DESIGN
CONCRETE EDGE AS
(TYP.)
ON THIS DRAWING
SEE GENERAL NOTE
REQUIRED BY DESIGN.
STEEL COLUMN AS
BELOW BASE PLATE
ABOVE AND (1)
(1) FLAT WASHER
(TYP.)
ON THIS DRAWING
SEE GENERAL NOTE
REQUIRED BY DESIGN.
STEEL COLUMN AS
ON THIS DRAWING
GENERAL NOTES 3
HAND RAILS SEE
AS REQUIRED
LATERAL BRACING
STAIRWAY
ON GEOTECHNICAL REPORT
SOIL CRITERIA SHALL BE BASED
(SIZE AS REQUIRED BY DESIGN)
CONCRETE MAT FOUNDATION
S006
1’-6"
REQUIRED BY DESIGN)
(MEMBER SIZE AS
FOR HELIAX CABLES
OF 2 ON BOTH SIDES)
CABLE LADDER (TYPICAL
PROJECT ENGINEER
FOR OFFICIAL USE ONLY
MGR: ENGINEERING
H
G
F
E
D
C
B
A
:2 n g a in e s
L A
X
D
R R S .d g n
1234567
H
G
F
E
D
34567 2 1
A
B
C
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
REV DESCRIPTION JCN
DATE
REDLINE
APVD
DATE
APPROVED
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
RELEASED FOR:
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
LOS ANGELES CA
817.834.2165 (Fax)
817.759.4820
Fort Worth, TX. 76137
Suite 228
4500 Mercantile PL Dr.
PTSI Managed Services Inc.
INFRASTRUCTURE
ENGINEERING SERVICES
1406092
LAX RR - DESIGN "B"RELEASED FOR:
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
GRATING AS NEEDED (TYP)
CROSS-BEAMS SUPPORTING
STEEL BEAMS AND
REQUIREMENTS (TYP.)
ANTENNA SUPPORT
MEET THE FAA
AS REQUIRED TO
EXTEND HIGHER
9" MINIMUM,
STIFF ARM (TYP)
BEAM (TYP OF 4)
GRATING AND PLATFORM
STEEL COLUMNS BELOW
(TYP OF ALL AROUND)
HAND RAILS
GRATING (TYP)
SUPPORTING
STEEL BEAMS
MOUNTS SHALL BE RETRACTABLE
ON DWG S001
SEE STRUCTURAL STEEL NOTES
GALVANIZED.
COMPONENTS SHALL BE HD
ALL MEMBERS AND CONNECTION
(TYP OF 4)
ANTENNA MOUNTS BRACKETS
NOTES:
4.
3.
2.
1.
S007 SCALE: 1/4" = 1’-0"
PLATFORM ELEVATION
30’-0"5’-0" 5’-0"
40’-0"
GRATING
TOP OF PLATFORM
FRAME
ANTENNA STANDOFF
S007 SCALE: 1/4" = 1’-0"
ANTENNA LAYOUT
B
S007 NOT TO SCALE
TYPICAL COLUMN INSTALLATION
AB
RDS
ANTENNAS (TYP)
30’-0"
8’-0" (TYP)
04’ 4’ 8’
SCALE: 1/4" = 1’-0"
A
S007 SCALE: 1/4" = 1’-0"
STAIRWAY SECTION
LAX-D-RR-S007
M
A X
IM
U
S007 SCALE: 1/2" = 1’-0"
STAIRWAY STEP
(MINIMUM)
9 1/2"
01’ 2’ 5’
SCALE: 1/2" = 1’-0"
1’
PLATFORM CONFIGURATION
REMOTE RECEIVER TOWER REPLACEMENT
LOS ANGELES INTERNATIONAL AIRPORT
PN
(TYP)
HAND RAILS
S007 SCALE: 1/4" = 1’-0"
PLATFORM PLAN
P L
A T
E
T
MOUNT PIPE AS REQUIRED
H
IC
K x
D O
W N
D O
W N
10’-0"3’-0"
15’-0"
30’-0"
10’-0"
Y
S
IG
N
R E
Q U
IR
E D
D E
P
(TYP)
HAND RAILS
(TYP)
HAND RAILS
3’-0"
(TYP)
GRATING AS REQUIRED
CROSS-BEAM SUPPORTING
STEEL BEAMS AND
STEEL COLUMN BEHIND
STAIRWAY STEEL COLUMN
TOP OF STEEL BEAM
STEEL COLUMN (BEHIND)
STEEL COLUMN (BEHIND)
6’-8" 10’-0" +
S007
G R
A D
E
O V
E
GRADE 0-0"
APPROXIMATE
S007
B
INTERMEDIATE LANDING
STAIRWAY
AS REQUIRED (TYP)
PLASTIC (FRP) GRATING
FIBERGLASS REINFORCE
30’-0"
TOP LANDING
STAIRWAY
A
S007
AS REQUIRED (TYP)
DIAPHRAGM BRACE
T
Y P
(TYP)
TOP OF FRP GRATING (TYP)
(BELOW)
BOTTOM STAIRWAY
GRATING
ABOVE TOP OF
TOP OF PLATE 4"
TOE PLATE
BASE PLATE
(2) NUTS ABOVE
BASE PLATE
NUT BELOW
(1) LEVELING
SURFACE
FOUNDATION
BASE PLATE
BASE LEG
COLUMN
STAIRWAY
NON SHRINK GROUT
BELOW BASE PLATE
ABOVE AND (1)
(1) FLAT WASHER
PROJECT ENGINEER
FOR OFFICIAL USE ONLY
MGR: ENGINEERING
H
G
F
E
D
C
B
A
:1 r s h e lt o n
L A
X
D
R R S .d g n
1234567
H
G
F
E
D
34567 2 1
A
B
C
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
REV DESCRIPTION JCN
DATE
REDLINE
APVD
DATE
APPROVED
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY DATE
DRAWING NO
DESIGNED
REVIEWED BY
RELEASED FOR:
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A C
T
LOS ANGELES CA
817.834.2165 (Fax)
817.759.4820
Fort Worth, TX. 76137
Suite 228
4500 Mercantile PL Dr.
PTSI Managed Services Inc.
INFRASTRUCTURE
ENGINEERING SERVICES
1406092
LAX RR - DESIGN "B"RELEASED FOR:
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
ABBREVIATIONS
GROUND CONNECTION
EARTH, SOIL
CONCRETE
REFERENCE NOTE
SCHEDULE NUMBER
CABLE AS NOTED
CONDUIT, WIREWAY,
EQUIPMENT AS NOTED
DEMOLISHED EQUIPMENT AS NOTED
X
GROUND ELECTRODE
SPLICE OR EXOTHERMIC WELD
ELECTRICAL SYMBOLS
GROUND WELL
GENERAL GROUNDING NOTES GENERAL ELECTRICAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.
2.
3.
4.
5.
6.
7.
8.
10.
11.
12.
13. 12.
14.
15.
9.
13.
16.
14.
15.
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
CM 07/09/2018
N S
T R
U C
T
LOS ANGELES INTERNATIONAL AIRPORT
GROUND PLATE
LAX-D-RR-E025
la x d r r e
.d g n
ENGINEERING SERVICES
INFRASTRUCTURE
SYMBOLS LEGEND, NOTES AND ABBREVIATIONS
WESTERN SERVICE AREAATO - TECHNICAL OPERATIONS
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
1406092
CHRISTINE TRUONG CLIFF RUSTAD
S A
F E
T Y
Q
U A L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORTSERVI
C E S
C
O N
T R
A C
T
RELEASED FOR:
100% SUBMITTAL-
FOR REVIEW PURPOSES ONLY
CONSTRUCTION, OR BIDDING
NOT TO BE USED FOR PERMITTING,
PTSI Managed Services Inc.
(310) 414-4050
880 Apollo Street
Suite 155
El Segundo, CA 90245
(310) 414-4088 (Fax)
08/13/2018
WR-2214
OPTION B
WP
W/
UNO
UNC
UG
TYP
TWR
TEMP
TBD
SS
SQ
SPGP
SPB
SP
SMGP
SCHED
RTR
RGS
RGSC
RF
RE
PVC
PSI
OD
OC
OAL
NEC
(N)
MIN
MH
MPGP
MGP
J, JB
ID
HH
HGT
HDG
GRN
GND
GFM
GFCI
GFE
GALV
G
FT
FRP
FIN
EES
E/G
(E)
DWG
DIA
COR
CMU
C
BLDG
BKR
BC
AWG
APPROX
AC
WEATHERPROOF
WITH
UNLESS NOTED OTHERWISE
UNITED NATIONAL COARSE
UNDERGROUND
TYPICAL
TOWER
TEMPORARY
TO BE DETERMINED
STAINLESS STEEL
SQUARE
SINGLE-POINT GROUND PLATE
SIGNAL PULL BOX
SURGE PROTECTOR OR STATIC PRESSURE
SUPPLEMENTAL GROUND PLATE
SCHEDULE
REMOTE TRANSMITTER RECEIVER
RIGID GALVANIZED STEEL
RIGID GALVANIZED STEEL CONDUIT
RADIO FREQUENCY
RESIDENT ENGINEER
POLYVINYL CHLORIDE
POUND PER SQUARE INCH
OUTSIDE DIAMETER
ON CENTER
OVERALL LENGTH
NATIONAL ELECTRICAL CODE
NEW
MINIMUM
MANHOLE
MULTI-POINT GROUND PLATE
MAIN GROUND PLATE
JUNCTION BOX
INSIDE DIAMETER
HANDHOLE
HEIGHT
HOT DIPPED GALVANIZED
GREEN
GROUND
GOVERNMENT FURNISHED MATERIAL
GROUND FAULT CIRCUIT INTERRUPTER
GOVERNMENT FURNISHED EQUIPMENT
GALVANIZED
GROUND
FEET
REINFORCED PLASTIC
FINISHED
EARTH ELECTRODE SYSTEM
EMERGENCY GENERATOR
EXISTING
DRAWING
DIAMETER
CONTRACTOR ON SITE REPRESENTATIVE
CONCRETE MASONRY UNIT
CONDUIT
BUILDING
BREAKER
BARE COPPER
AMERICAN WIRE GAUGE
APPROXIMATE
AIR CONDITIONING
THE SUBCONTRACTOR SHALL DOUBLE LOCK.
AND DISCONNECTS, NO EXCEPTIONS. FAA SHALL OPEN, APPLY LOCK OUT, AND THEN
ONLY FAA PERSONNEL MAY DE-ENERGIZE EQUIPMENT AND OPEN CIRCUIT BREAKERS
AT TERMINATIONS INDICATING PANEL AND CIRCUIT NUMBER.
AND PROVIDE WRITTEN TEST RESULTS TO RE. INCLUDE SHRINK EMBOSSED LABELS
CONDUCTORS INSTALLED UNDER THIS CONTRACT PER SPECIFICATION REQUIREMENTS
LARGER, AND SOLID FOR 10 AWG AND SMALLER. PERFORM MEGGER TESTS ON ALL
POWER CONDUCTORS SHALL BE COPPER, THWN-2, STRANDED FOR 8 AWG AND
THREADED RGSC.
EXTERIOR CONDUIT BOX CONNECTORS SHALL BE GASKETED MYERS HUB TYPE FOR
PERFORM SPLICING OF CABLES.
ACTIVITIES FOR EXPECTED CABLE TYPES, INCLUDING QUALIFIED PERSONNEL TO
THE SUBCONTRACTOR SHALL HAVE SPLICE KITS ON HAND DURING EXCAVATION
AS A CONTINGENCY FOR ACCIDENTALLY CUT POWER OR COMMUNICATION CABLES,
SPECIFICATIONS SECTION 270500 FOR TESTING REQUIREMENTS.
COORDINATE LABELS WITH RE AND FAA PRIOR TO FABRICATION. SEE
TAGS WHEN ENTERING AND LEAVING PULL BOXES, HANDHOLES, J-BOXES, ETC.
CABLES SHALL INCLUDE CABLE IDENTIFICATION LABELS AT EACH END AND CABLE
SUBCONTRACTOR SHALL REPLACE THE CABLE AT NO ADDITIONAL COST. COAXIAL
IS COMPROMISED, CABLE SHALL BE CONSIDERED DAMAGED AND THE
CABLE SHALL BE REPLACED AT SUBCONTRACTORS EXPENSE. IF SHIELD INTEGRITY
HELIAX CABLE SHALL BE INSTALLED WITHOUT SHARP BENDS OR KINKS. DAMAGED
PROVIDE COPY OF MANUFACTURER’S INSTALLATION INSTRUCTIONS TO RE.
WITHOUT SPLICES PER MANUFACTURER’S INSTRUCTIONS AND RECOMMENDATIONS.
SWAB ALL CONDUITS PRIOR TO CABLE INSTALLATION. CABLES SHALL BE INSTALLED
UNLESS OTHERWISE NOTED.
BURIED CONDUITS SHALL BE A MINIMUM OF 24" BELOW GRADE (TOP OF CONDUIT)
EQUIPMENT LOCATIONS. ADJUST AS NECESSARY WITH RE APPROVAL.
CONTRACT. VERIFY CONDUIT RISER LOCATIONS BASED ON FIELD VERIFICATION OF
TO COMPLETE COMMUNICATION AND POWER SYSTEMS INSTALLED UNDER THIS
PROVIDE ALL CONDUIT, JUNCTION BOXES, CABLES, TERMINATIONS, ETC. AS REQUIRED
INSTALLING CABLES AND/OR CONDUITS.
HANDHOLES SHALL BE PUMPED DRY AND KEPT DRY WHILE ACCESSING OR
DURING CONSTRUCTION IN ACCORDANCE WITH CONTRACT REQUIREMENTS.
PROVIDE DEWATERING OF ALL TRENCHES AND EXCAVATIONS IF WATER IS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.