QUESTIONS AND ANSWERS
6973GH-19-R-00208
1. Should the new conduit for the LED lights be routed below the floor and penetrate through, to prevent trip hazard? All conduit routing for the new LED lights in the Radome, should either be routed under the radome floor, or if the existing conduit can be reused, that is acceptable as well.
2. Page A004 of the drawings calls out 2 new security sensors. Is there a specific sensor that we are to use? Existing door sensors are shown on the attached picture, match existing.
3. Page A006 shows the flood light breaker panel, is this located on the 4th floor? Breaker panel is located on third floor.
4. Flooring called out in SOW: TUF-DEK- DuraDek- both specify must be installed by certified installer which there are none in state of Louisiana. The process to become certified is not cost conducive to such a small area being installed. Can a substitute be used that meets the specs called out in the SOW? Tuff shield appears to meet the specifications and would be acceptable.
5. Can a substitute be used that meets the specs called out in the SOW? Temco caulk appears to meet the specifications and would be acceptable.