About this file

QUESTIONS AND ANSWERS (pdf)

View the file

Other files

File Type Posted
aex-d-arsr-a006.pdf PDF
AEX-D-ARSR-A003.pdf PDF
AEX-D-ARSR-G009.pdf PDF
AEX-D-ARSR-C002.pdf PDF
IMG_0012 - door security.jpg JPG image
6973GH-19-R-00208 0001.pdf PDF
CONTRACTORS RELEASE FORM.doc DOC document
6973GH-19-R-00208 (SIR).SIR —
AEX-D-ARSR-A005.pdf PDF
SOW.pdf PDF
QUESTIONS AND ANSWERS.pdf PDF
AEX-D-ARSR-A004.pdf PDF
WD-LA190051.pdf PDF
EXPERIENCE FORM.pdf PDF
AEX-D-ARSR-A004.pdf PDF
AEX-D-ARSR-C002.pdf PDF
SOW.pdf PDF
EXPERIENCE FORM.pdf PDF
6973GH-19-R-00208 (SIR).SIR —
aex-d-arsr-a006.pdf PDF
6973GH-19-R-00208 0001.pdf PDF
AEX-D-ARSR-A003.pdf PDF
CONTRACTORS RELEASE FORM.doc DOC document
AEX-D-ARSR-G009.pdf PDF
AEX-D-ARSR-A005.pdf PDF
WD-LA190051.pdf PDF
AEX-D-ARSR-A004.pdf PDF
6973GH-19-R-00208 0001.pdf PDF
CONTRACTORS RELEASE FORM.doc DOC document
WD-LA190051.pdf PDF
SOW.pdf PDF
aex-d-arsr-a006.pdf PDF
AEX-D-ARSR-G009.pdf PDF
EXPERIENCE FORM.pdf PDF
6973GH-19-R-00208 (SIR).SIR —
AEX-D-ARSR-A005.pdf PDF
AEX-D-ARSR-C002.pdf PDF
AEX-D-ARSR-A003.pdf PDF
CONTRACTORS RELEASE FORM.doc DOC document
AEX-D-ARSR-C002.pdf PDF
AEX-D-ARSR-G009.pdf PDF
WD-LA190051.pdf PDF
EXPERIENCE FORM.pdf PDF
AEX-D-ARSR-A004.pdf PDF
6973GH-19-R-00208 (SIR).SIR —
aex-d-arsr-a006.pdf PDF
AEX-D-ARSR-A005.pdf PDF
SOW.pdf PDF
AEX-D-ARSR-A003.pdf PDF
CONTRACTORS RELEASE FORM.doc DOC document
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

6973GH-19-R-00208

1. Should the new conduit for the LED lights be routed below the floor and penetrate through, to prevent trip hazard? All conduit routing for the new LED lights in the Radome, should either be routed under the radome floor, or if the existing conduit can be reused, that is acceptable as well.

2. Page A004 of the drawings calls out 2 new security sensors. Is there a specific sensor that we are to use? Existing door sensors are shown on the attached picture, match existing.

3. Page A006 shows the flood light breaker panel, is this located on the 4th floor? Breaker panel is located on third floor.

4. Flooring called out in SOW: TUF-DEK- DuraDek- both specify must be installed by certified installer which there are none in state of Louisiana. The process to become certified is not cost conducive to such a small area being installed. Can a substitute be used that meets the specs called out in the SOW? Tuff shield appears to meet the specifications and would be acceptable.

5. Can a substitute be used that meets the specs called out in the SOW? Temco caulk appears to meet the specifications and would be acceptable.

File details come from the government source that posted it.