H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
Narragansett Bay
~'\ OF TR,4N
(S'A 8
~ ~ LOCUS MAP
LtJ -0 0 :z c:: cs ~ st.1r£s a~
EQUIPMENT SHELTER REPLACEMENT PROJECT
LIGHT SYSTEM WITH MEDIUM INTENSITY APPROACH
RAPID ALIGNMENT INDICATOR LIGHTS (MALSR)
QUONSET STATE AIRPORT
NORTH KINGSTOWN, RHODE
COQU)
ISLAND
DRAWING INDEX
DRAWING NUMBER
GENERAL
OQU-1304494-G001
OOU-1304494-G002
OOU-1304494-G003
MALSR SITE
OOU-1304494-A001
OOU-1304494-A002
OOU-1304494-A003
OOU-1304494-D001
OOU-1304494-C001
OQU-1304494-C002
OOU-1304494-E001
OOU-1304494-S001
DRAWING TITLE
COVER AND INDEX SHEET
GENERAL NOTES & GFM LIST
AIRPORT LAYOUT PLAN
SHELTER EXTERIOR ELEVATIONS
SHELTER FLOOR PLAN AND DETAILS
SHELTER PLAN - DUPONT
DEMOLITION PLAN
SITE PLAN
SITE DETAILS
ELECTRICAL PLAN
FOUNDATION PLAN
5 4
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PARSONS~~---------+--~
PTSI Managed Services Inc.
1200 District Ave Burlington, MA
781.238. 7070
02/21/2019 CONSTRUCTION, DT •17635 1304494 09/20/2018
REV APPROVED
DATE DESCRIPTION JCN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
REDLINE APVD
DATE
L-------~~~~:_jATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
MALSR RELEASED FOR:
ISSUED FOR CONSTRUCTION
2/21/2019
R/W 16 SHELTER REPLACEMENT PROJECT
COVER AND INDEX SHEET
NORTH KINGSTOWN QUONSET ST ATE AIRPORT RI
REVIEWED BY
APPROVED BY
G.NEVI
DESIGNED ISSUED BY DATE JCN
t----+---+=o=RA=wN,--------"-=-,PL ENGINEERING SERVICES f-c-coRA=w=iNG~N°=0 2~I2~1I~20~19~----=-'+-"---'--I
1304494
REV
PL INFRASTRUCTURE 0QU-1304494-G001
PL
CHECKED
. \_~IC'
H
G
F
E
D
C
C u
' A! ..
' 0 w
·:·11")j
G
F
E
D
C
B
A
GENERAL NOTES:
1. THIS DRAWING PACKAGE INDICATES WORK REQUIRED FOR THE MALSR SHELTER REPLACEMENT
AT QUONSET STATE AIRPORT, NORTH KINGSTOWN, RHODE ISLAND.
2. WORK ASSOCIATED WITH THE PROJECT IS LOCATED ON THE QUONSET AIRFIELD.
NO MOVEMENT BY CONTRACTOR, SUBCONTRACTORS, DR DELIVERY VEHICLES SHALL BE MADE ON THE ACTIVE AIR OPERATIONS AREA CAOAl OR AIRCRAFT MOVEMENT AREA WITHOUT ESCORT BY THE AIRPORT AUTHORITY, FAA , THE RESIDENT ENGINEER CREl, DR DESIGNATED CONTRACTOR ESCORT VEHICLE.
THE CONTRACTOR SHALL CERTIFY IN WRITING THAT ALL DRIVING EMPLOYEES, SUBCONTRACTOR EMPLOYEES AND DELIVERY EMPLOYEES HAVE READ AND UNDERSTAND THE FAA AIRPORT GROUND VEHICLE OPERATIONS GUIDE (DOT/FAA/ASY-300 98/001 l PER FAA ORDER 5200.7A.
3. THE SUBCONTRACTOR SHALL ARRANGE FOR AND ABIDE BY ALL SECURITY BADGING AND ACCESS REQUIREMENTS OF
THE AIRPORT TO WORK ON THE AIRFIELD. SECURITY BADGING SHALL BE ON DISPLAY AT ALL
TIMES WHILE ON THE AIRFIELD.
4. SUBCONTRACTOR ACCESS ROUTES, STAGING AREAS AND EMPLOYEE PARKING AREAS SHALL BE APPROVED IN ADVANCE
BY THE AIRPORT AUTHORITY.
5. SUBCONTRACTOR'S VEHICLES SHALL BE EQUIPPED WITH AN APPROVED ROTATING BEACON AND/OR ORANGE AND
WHITE FLAG.
6. SUBCONTRACTOR'S CREW SHALL BE EQUIPPED WITH A RADIO AND SHALL MONITOR AIR TRAFFIC ON THE APPROPRIATE
FAA FREQUENCIES.
7. WORK ON THE AOA AND WITHIN 250 FEET OF THE RUNWAY CENTERLINE AND 1,000 FEET FROM THE RUNWAY THRESHOLD (DEFINED AS THE RUNWAY SAFETY AREA) WILL REQUIRE A RUNWAY SHUTDOWN. ANY ACTIVITIES INVOLVING CRANES OR OTHER EQUIPMENT EXCEEDING 15 FEET IN HEIGHT MAY ALSO REQUIRE A RUNWAY SHUTDOWN OR OTHER PROVISIONS. COORDINATE ALL SUCH ACTIVITIES AND REQUIRED SHUTDOWNS WITH THE COR/RE, AND THE AIRPORT AT LEAST 48 HOURS IN ADVANCE.
8. WORK ASSOCIATED WITH THE MALSR SHELTER REPLACEMENT WILL REQUIRE A SHUTDOWN. COORDINATE ALL ACTIVITIES AND REQUIRED SHUTDOWNS WITH THE FAA SSC AT LEAST 48 HOURS IN ADVANCE.
9. THE SUBCONTRACTOR SHALL MAINTAIN A CLEAN WORK SITE. EQUIPMENT AND MATERIAL SHALL BE REMOVED FROM THE WORK SITE AT THE END OF EACH WORK SHIFT. THE SUBCONTRACTOR SHALL KEEP THE WORK SITE FREE OF CONSTRUCTION DEBRIS AND OTHER FOREIGN OBJECT DEBRIS CFODl AT ALL TIMES. THE SUBCONTRACTOR SHALL CONDUCT FOD INSPECTIONS OF ALL VEHICLES PRIOR TO DRIVING ON THE AOA. THE SUBCONTRACTOR SHALL BE PREPARED TO REMOVE ANY DUST, DIRT, MUD OR OTHER FOD TRACKED OR OTHERWISE LEFT ON THE AOA AT ALL TIMES.
10. THE SUBCONTRACTOR SHALL STRICTLY COMPLY WITH ALL OSHA REGULATIONS AT ALL TIMES. THE RE RESERVES THE RIGHT TO SUSPEND THE PROJECT SHOULD HE OR SHE DETERMINE THAT AN UNSAFE CONDITION EXISTS.
11. THE SUBCONTRACTOR SHALL PROVIDE AND INSTALL ALL MATERIAL UNLESS OTHERWISE INDICATED. THE SUBCONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, AND REQUIRED TEMPORARY POWER UNLESS OTHERWISE INDICATED. THE
SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED PERMITS.
12. THE SUBCONTRACTOR SHALL LEGALLY DISPOSE OF ALL MATERIAL AND EQUIPMENT NOT RETURNED TO OR RETAINED BY
THE FAA.
13. IF CONDITIONS ARE DIFFERENT THAN THOSE INDICATED IN THE DRAWINGS DR SPECIFICATIONS, THE SUBCONTRACTOR SHALL CONTACT THE RESIDENT ENGINEER (REl PRIOR TO PROCEEDING WITH CONSTRUCTION.
SITE WORK:
1. ALL DIMENSIONS, ELEVATIONS, CONTOURS AND HEIGHTS INDICATED ARE APPROXIMATE AND SHALL BE VERIFIED IN
THE FIELD BY THE SUBCONTRACTOR.
2. ALL TRENCHES AND EXCAVATIONS WITHIN 250 FEET OF THE RUNWAY CENTERLINE AND 1,000 FEET FROM THE RUNWAY THRESHOLD (DEFINED AS THE RUNWAY SAFETY AREAl AND 65.5 FEET OF THE TAXIWAY CENTERLINE (DEFINED AS THE TAXIWAY SAFETY AREAl SHALL NOT BE LEFT OPEN OVERNIGHT AND SHALL BE BACKFILLED AND COMPACTED TO MATCH THE EXISTING GRADE BEFORE LEAVING THE SITE. STEEL PLATES MAY BE USED AS AN ALTERNATIVE ONLY
WITH WRITTEN PERMISSION BY THE RE AND AIRPORT.
3. EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. OTHER UTILITIES MAY NOT BE SHOWN. THE SUBCONTRACTOR SHALL FIELD LOCATE ALL SUBSURFACE UTILITIES PRIOR TO ANY EXCAVATION OR DIRECTIONAL BORING OPERATIONS.
DIRECT EARTH BURIED (DEB) RUNWAY AND TAXIWAY LIGHTING POWER CABLES AND OTHER FAA FACILITY POWER CABLES ARE HIGH VOLTAGE. FORTY-EIGHT (48) HOUR (MINIMUM) NOTICE BY THE SUBCONTRACTOR TO THE RE, THE AIRPORT
AND THE FAA SSC IS REQUIRED FOR ALL UTILITY MARKING AND/OR FACILITY SHUTDOWNS.
4. THE SUBCONTRACTOR SHALL BE PREPARED TO IMMEDIATELY REPAIR ANY UTILITIES DAMAGED DURING EXCAVATION OPERATIONS AND SHALL CONDUCT All SUCH REPAIRS AT SUBCONTRACTOR'S EXPENSE.
5. ALL UNDERGROUND CABLE SHALL BE IN CONDUIT EXCEPT FOR BARE COPPER GROUND CABLE, GUARD WIRE, COUNTERPOISE, AND WHERE OTHERWISE INDICATED. UNDERGROUND CONDUIT SHALL BE 24 INCHES CMINIMUMl BELOW GRADE EXCEPT WHEN INTERFACING HANDHOLE ENTRANCES OR EXISTING CONDUIT AT OTHER DEPTHS OR WHERE OTHERWISE INDICATED.
UNDERGROUND CONDUIT SHALL BE GALVANIZED RIGID STEEL CONDUIT (GRSCl EXCEPT WHERE OTHERWISE INDICATED.
GRSC FITTINGS SHALL BE THREADED TYPE . EXPOSED THREADS SHALL BE SEALED WITH AN APPROVED SEALANT TO PREVENT CORROSION PRIOR TO BACKFILL OPERATIONS. CONDUITS SHALL BE CLEANED OF DEBRIS AND A NYLON
PULL WIRE SHALL BE INSTALLED IN ALL CONDUITS.
6. ALL EXTERIOR CONDUITS ENTERING BUILDINGS (EXCEPT THOSE WITH GROUNDING CONDUCTORS ONLY) SHALL HAVE EXPANSION/DEFLECTION COUPLINGS. AN APPROVED GROUND JUMPER SHALL BE INSTALLED BETWEEN METALLIC CONDUIT
ON EACH SIDE OF COUPLING UNLESS COUPLING IS INTERNALLY GROUNDED.
7. CONCRETE CABLE/DUCT MARKERS SHALL BE INSTALLED WHERE INDICATED ON THE DRAWINGS.
CABLE/DUCT MARKERS SHALL BE PIGMENTED ORANGE AND SHALL NOT EXTEND MORE THAN 1 INCH ABOVE FINAL GRADE.
8. BACKFILL FDR CABLE OR DUCT TRENCHES OR FOR OTHER EXCAVATIONS SHALL BE PLACED IN LAYERS NOT EXCEEDING 8 INCHES AND EACH LAYER SHALL BE THOROUGHLY COMPACTED TO WITHIN 95% OF MAXIMUM DENSITY OF OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH AASHTO T-180. WHERE FILL IS REQUIRED IN THE RUNWAY/TAXIWAY SAFETY AREA, WORK SHALL COMPLY WITH FAA AC 150/5370-10. IF REQUIRED, THE CONTRACTOR SHALL ARRANGE FOR AN
INDEPENDENT FIELD TEST TO VERIFY PROPER COMPACTION.
9. THE EXISTING GRADE SURROUNDING THE FOUNDATION OR TRENCH WORK SHALL BE STABILIZED AND PROTECTED FROM EROSION DURING AND IMMEDIATELY AFTER COMPLETION OF THE FOUNDATION OR CONDUIT INSTALLATION AND ALL
REQUIRED EXCAVATION AND BACKFILL.
10. ALL DISTURBED AREAS SHALL BE RESTORED TD PRIOR CONDITION AT A MINIMUM. FINAL CONDITION SHALL BE
APPROVED BY THE FAA AND THE AIRPORT.
FOUNDATION WORK:
1. ALL CONCRETE WORK SHALL COMPLY WITH ACI-304, "RECOMMENDED PRACTICE FOR MEASURING, MIXING AND PLACING CONCRETE", AC l -308, "STANDARD PRACTICE FOR CUR ING CONCRETE", AND AC I -347, "RECOMMENDED
PRACTICE FOR CONCRETE FORMWORK".
2, CAST IN PLACE CONCRETE SHALL BE 3000 PSI @ 28 DAYS, 3/4" MAX STONE IN MIX.
7 6
5 4 3
EQUIPMENT INSTALLATION:
1. ASSEMBLE EQUIPMENT PER MANUFACTURER'S INSTRUCTIONS.
2. USE ANTI-SEIZE COMPOUND ON ALL THREADED PARTS.
3. ALL CHANNEL SHALL BE STAINLESS STEEL UNISTRUT OR APPROVED EQUAL.
4. ALL HARDWARE SHALL BE STAINLESS STEEL, UNLESS OTHERWISE INDICATED.
ELECTRICAL WORK:
1. ALL ELECTRICAL WORK SHALL CONFORM TO FAA-C-1217G AND FAA-C-1391D SPECIFICATIONS AND IN NO CASE SHALL
VIOLATE THE NATIONAL ELECTRIC CODE (NFPA 70, ).
2. NOT USED
3. NOT USED
4. ALL CONTROL/DATA CABLE SHALL BE TWISTED PAIRS.
5. ALL CIRCUITS SHALL HAVE INDIVIDUAL NEUTRAL AND GROUNDING CONDUCTORS; NO SHARED NEUTRALS OR GROUNDS
WILL BE PERMITTED.
6. NEUTRAL CONDUCTORS SHALL REMAIN ISOLATED FROM GROUND IN ALL LOCATIONS EXCEPT AT POWER SERVICE ENTRANCE.
7. WHERE POSSIBLE, POWER CABLES AND CONTROL/DATA CABLES SHALL RUN IN CONDUIT INDEPENDENT OF EACH OTHER.
SEPARATE POWER ANO CONTROL/DATA CABLES IN COMMON HANOHOLES, ENCLOSURES ANO SHELTER SQUARE DUCT WIREWAY.
8. ALL CABLES SHALL BE PROPERLY COLOR CODED AND PERMANENTLY LABELED AT EACH END ANO IN EACH HANOHOLE.
ALL CABLES IN HANDHOLES SHALL BE LOOPED AROUND SEVERAL TIMES.
9. A DYNAMOMETER GRADUATED TO ACTUALLY INDICATE THE PROPER TENSION FOR ANY CABLE BEING PULLED THROUGH UNDERGROUND CONDUIT OR DUCT SHALL BE USED UNLESS THE SUBCONTRACTOR ADAPTS A HARNESS OF THE PROPER SIZED ROPE THAT WILL LIMIT THE TENSION OF THE PULL. ANY COMBINATION OF CABLES PULLED IN CONDUIT OR DUCT SHALL NOT EXCEED THE SUM OF THE INDIVIDUAL ALLOWABLE TENSION OF EACH CABLE PLUS 15%.
10. ALL CABLE SPLICES WILL BE APPROVED IN ADVANCE BY FAA.
11. ALL PVC CONDUIT SHALL BE SCHEDULE 40.
ELECTRICAL GROUNDING:
1. GROUNDING AND LIGHTNING PROTECTION SHALL MEET FAA-ST0-019F, "LIGHTNING ANO SURGE PROTECTION, GROUNDING, BONDING ANO SHIELDING REQUIREMENTS FOR FACILITIES AND ELECTRONIC EQUIPMENT".
2. ALL GROUND RODS SHALL BE COPPER CLAD STEEL, 3/4 INCH DIAMETER AND 10 FEET
LONG. GROUND RODS SHALL BE DRIVEN SUCH THAT THE TOP OF ROD IS NO LESS
THAN 12 INCHES BELOW GRADE.
3. ALL UNDERGROUND GROUND CONNECTIONS SHALL BE EXOTHERMICALLY WELDED. WELD INTEGRITY SHALL BE TESTED BY A 4 TERMINAL MILLIOHMMETER. SUCCESSFUL TEST SHALL BE LESS THAN 0.001 OHMS.
4. ALL UNDERGROUND GRSC SHALL BE GROUNDED USING A #2 AWG BARE COPPER GROUND
TD THE GROUNDING COUNTERPOISE AND/DR GROUND ROD AT EACH ENO. ALL CONNECTIONS
TD BE EXOTHERMICALLY WELDED.
5. UNDERGROUND GROUNDING CONDUCTORS SHALL BE 24 INCHES (MINIMUM) BELOW GRADE
EXCEPT AT GROUND RODS AND AS OTHERWISE INDICATED.
6. ALL CABLE SHIELDS SHALL BE GROUNDED AT BOTH ENDS.
7. WHEN INSTALLING MULTIPLE GROUND CONDUCTORS TD ONE GROUND LUG THE SUBCONTRACTOR
MUST USE A CONNECTOR (BURNDY FRAMATONE #YCHC OR EQUAL) AND A "PIGTAIL" TO
SPLICE THE GROUNDS PRIOR TO CONNECTING TO THE LUG.
8. ALL UNUSED CONDUCTORS SHALL BE GROUNDED AT BOTH ENDS.
TESTING:
1. THE SUBCONTRACTOR SHALL TEST ALL EQUIPMENT AND CABLES AS REQUIRED BY FAA STANDARDS
AND SPECIFICATIONS.
2. VOLTAGE TESTS, INSULATION TESTS, AND GROUND RESISTANCE TESTS SHALL BE CONDUCTED ON
ALL CONDUCTORS (AS APPROPRIATE) IN THE PRESENCE OF THE CDR ANO/OR THE RE. TESTS
CONDUCTED WITHOUT THE COTR OR THE RE PRESENT WILL BE REJECTED.
3. ALL TEST RESULTS SHALL BE FORWARDED TO THE FAA IN AN FAA SPECIFIED FORMAT.
2 1
SUBTITLE REFERENCE
REFERENCE LETTER/NUMBER
(PLAN, ELEVATION, SECTION OR DETAIL)
/ )(' xxxxxxxxxxx 10~X SCALE: x~xxx l- '--scALE
SHEET NUMBER(Sl WHERE CALLOUT(Sl TO PLAN, ELEVATION, SECTION DR DETAIL IS/ARE LOCATED
ELEVATION CALLOUT REFERENCE
ELEVATION REFERENCE LETTER
,/ x'',._ \O(X>Y
[HEET NUMBER WHERE
ELEVATION IS LOCATED
SECTION CALLOUT REFERENCE
SECTION REFERENCE LETTER
_____ _j
'?:ET NUMBER WHERE
SECTION IS LOCATED
DETAIL CALLOUT REFERENCE
DETAIL REFERENCE NUMBER
x"
SHEET NUMBER WHERE
DETAIL IS LOCATED
GOVERNMENT FURNISHED MATERIAL (GFMl
NO. ITEM STOCK#
1 10X16 FIBERGLASS MALSR SHELTER
FOR OFFICIAL USE ONLY
QUANTITY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 use 552
H
G
F
E
D
C
PARSCNS~~----~-----4--~_
5 4
PTSI Managed Services Inc ~~~
REV
02/21/2019 CONSTRUCTION, DT •17635
APPROVED
DATE DESCRIPTION
1304494 09/20/2018
JCN REDLINE
DATE
APVD ~~~~ng~i:~~i~~ Ave 11:~i::t~~]I"
781.238. 1010 II v'v , , " 11
1;:11) ~ Y DEPARTMENT OF TRANSPORTATION
'W 0V :l ~ 1/./½ FEDERAL AVIATION ADMINISTRATION ~)~ -----=-, ~ L ________ _:_~· ~~d~=::_jATO - TECHNICAL OPERATIONS EASTERN SERVICE
MALSR
AREA
RELEASED FOR:
ISSUED FOR CONSTRUCTION
2/21/2019
R/W 16 SHELTER REPLACEMENT PROJECT
GENERAL NOTES & GFM LIST
NORTH KINGSTOWN QUONSET ST ATE AIRPORT RI
REVIEWED BY
SUBMITTED BY
B.FOQ/..'/-:1r--1 --
APPROVED BY /4~
G.NEV/LLE_/( I ff#
PROJECT ENGINEER MGR: ENGINEERING 1 CENTER
ISSUED BY DATE 02/21/2019 l JCN 1304494 t---+----+-DRA_W_N -----PL ENGINEERING SERVICES >--D_RA_w-,N-G~No~=~~----=-'-+-R~Ev'-1
INFRASTRUCTURE
DESIGNED
PL
CHECKED
PL 0QU-1304494-G002
2 1 z 0:: ...
<I) z ii 0 ...
<I)
"' "' "' "' "' 0 f
N 0 :
A~ ..
G
F
E
D
C
B
C • 0 C , j
6,~ A ~-" -0 r g~ NO -" . -ON g;, LEGEND:
POWER CABLE
AN-FPN/28 & SERIS CONTROL CABLE
AN-FPS/8 & SERIS CONTROL CABLE
AN-FPN/28 CONTROL CABLE
COMMUNICATION CONTROL CABLE
ASR-5 CONTROL CABLE
-+-------+-- POLE LINE
0 A-< l AIRPORT MANHOLE <COMMUNICATION & RADAR)
0 EMH-( l
HH
ELECTRIC MANHOLE (POWER)
CABLE SPLICE 50 PR•19-COMM.
HANDHOLE
ANTENNA
OH-30/ 4 WIRE
EMH 11E11
0 EMH "B"
C-22
EMH "Au
EMH A-43
"" ?i° A-42 ~\ -"' 0
RT SITE <::i" '--t'~C c'.f' EMH A-42
NAS QUONSET PT.
A-41
EMH A-41
CHH A-45
I
EMH A-46 CHH A-46
MALSR \ / EMH A-47
SUBSTATION
SHELTER
I AL7
/ CHH A-47
L. ""''"'"""' ,., 7
6 5
---~-Z-~~-_• _• _• ~"'° I
CHH-1A
ASR-5 CHH-1
STA 21•32
C
CHH-2
3 POLES GANG OPERATED
OIL FUSE CUTOUTS
(ASR-5 PWR) 30A FUSES
C-19 A-23
A-37
2-WAY ED
6 5
CFWJ
A-21
SITE NO. 4
A-45
A-17
LXFMR VAULT
TACAN BLDG
A-4~
A-18
*A-19
EMH-29A
EMH-29D EMH-29B
C-15---,""
EMH-29C -...,._,.
300' 0 300' 600' ------SCALE: 1" • 300'
EMH1-8~/
EMH A-7
,,,_,,-EMH ~
EMH A-2
PARSONS
PTSIManaged Services 1200 District Ave Burlington, MA
781.238. 7070
A-28
C-14
*A-29
C-20
EMH-21
4-WAY ED
'o_-,a--A-30
REV
A-27~
~SITE N0.2
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
02/21/2019 CONSTRUCTION, DT •17635 1304494 09/20/2018
APPROVED
DATE DESCRIPTION JCN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
REDLINE
DATE
H
G
F
E
D
C
APVD
z Q ...
L--------~~~~~jATO - TECHNICAL OPERATIONS EASTERN SERVICE
MALSR
AREA 0 <o ::, ,n 0:: n ... ,n
fl) n
RELEASED FOR,
ISSUED FOR CONSTRUCTION
2/21/2019
R/W 16 SHELTER REPLACEMENT PROJECT
AIRPORT LAYOUT PLAN
NORTH KINGSTOWN
REVIEWED BY
B.
PROJECT ENGINEER
DESIGNED
PL
DRAWN
PL
CHECKED
PL
QUONSET STATE NRPORT
ISSUED BY
ENGINEERING SERVICES
INFRASTRUCTURE
I
APPROV~D BY
G.NEVI
02/21/2019 JCN
DRAWING NO
0QU-1304494-G003
RI
1304494
REV
z ii:.
0 ...
IJJ
fl)
C
~{'-' r0
',a w
Tl--tlS DRAWING PRnnucrn ()~,) N'.W F!~GI ~,Nn QFrin.t! HWRO~T_AT\f'~-1 C:':'C:TfM
F
E
D
C
B
A
INSTALL
3" GRSC
POWER SERVICE
MAIN ENTRANCE
E/G RECEPTACLE -
(GFM)
INSTALL
( 3) 1 /C #3/0 &
( 1 ) 1 /C #2 GRND
IN 3" GRSC FROM
POWER HANDHOLE
GROUND ROD~
FIBERGLASS HOOD
(GFM)
MOUNT HVAC
D
:-'l}""..!L'-- _.,.! __ .i ··t>· •. ~·., ... \> •
FIBERGLASS
DOOR HOOD
( GFM)
ALUMINUM
DOOR AND FRAME
(GFM)
A MALSR SHELTER NORTH ELEVATION
A001 SCALE: 3/8" = 1'-0"
SHELTER
EXHAUST
VENT WITH
HOOD (GFM)
UN IT ( GFM) ---++-----------i =I
6 5
INSTALL 4" X 4" X 4"
PVC JUNCTION BOX --
HVAC UNIT
(GFM)
SHELTER
GROUND LWC
HVAC UNIT -----i--<
( GFM)
INSTALL NEW
2" GRSC
STEADY BURN
POWER TO
HANDNOLE ----
#4/0 BARE COPPER
CABLE TO
COUNTERPOISE
CLASS 2 COPPER
DOWN CONDUCTOR
TO COUNTERPOISE
INSTALL
GIG
ANTENNA
(GFM)
INSTALL
A/G
ANTENNA
( GFM)
INSTALL 1" GRSC
RISER W/ WEATHERHEAD
INSTALL 4" X 4" X 4"
PVC JUNCTION BOX
INSTALL
INSTALL NEW
2" GRSC TO
FLASHER CONTROL
INSTALL NEW
2" GRSC TO
FLASHER POWER
2" GRSC TO HANDHOLE
3 - 1 /C #2 AWG
1 - 1 /C #8 AWG
TO FLASHERS
INSTALL
1 " GRSC
RISER
E/G RECEPTACLE
2" GRSC CONDUIT
SLEEVE (CAPPED)
INSTALL
(2) 250 KCMIL CABLES FROM
HIGH ENERGY TRANSIENT BWS
TO COUNTERPOISE
SHELTER GROUND LUG
INSTALL
2" GRSC TO HANDHOLE
CONTAINS 6 PR
#19 TO FLASHERS
2-250 MCM EXOTHERMICALLY
WELDED TO 4/0 COUNTERPOISE
MALSR SHELTER SOUTH ELEVATION
A001 SCALE: 3/8" = 1'-0"
INTAKE FAN &
LOUVER WITH HOOD
GFM
INSTALL
3" GRSC
POWER
SERVICE
ENTRANCE
,___LIGHTNING
PROTECTION
SYSTEM
(SEE NOTE 5)
_ _,--FIBERGLASS COATING OVER PLYWOOD
(ORANGE & WHITE STRIPES)
FIBERGLASS
HOOD
E/G RECEPTACLE
2 1
0 0 0
MALSR SHELTER
( 1 0 1 X 1 6 1
0 0 ~
_" ,4._ - • h
A ... •
1 MALSR SHELTER PLAN (LEFT CONFIGURATION)
A001 SCALE: 3/8" = 1'-0"
NOTES:
C A001
5/8" ANCHOR
BOLTS (6 PL)
1, CONTRACTOR SHALL INSTALL EXPANSION COUPLINGS ON ALL EXTERIOR,
VERTICAL GRS CONDUITS,
2, CONTRACTOR SHALL CONNECT SHELTER TO COUNTERPOISE IN SEVEN LOCATIONS,
#4/0 AWG CONNECTED TO SHELTER FRAME WITH A DOUBLE BOLT CONNECTOR
AND EXOTHERMICALLY WELDED TD COUNTERPOISE,
3. SHELTER IS BOLTED DOWN AT SIX ANCHOR BOLT LOCATIONS.
4. INCOMING POWER SOURCE, 3" GRSC WITH (3) 3/0 AWG AND
#2 AWG GREEN GROUND CABLE, CONTRACTOR SHALL
RECONNECT INCOMING POWER SERVICE.
5. LIGHTNING PROTECTION SYSTEM COMPONENTS ARE GFM AND
INSTALLED BY CONTRACTOR, REFERENCE DWG, coo1.
LEGEND:
CD SEE NOTE 1, ETC,
UNDISTURBED EARTH
BACKFILL MATERIAL
[iii,~ CRUSHED STONE
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
TOP OF
FOUNDATION
TOP OF
FOUNDATION
PROVIDE EXPANSION
COUPLING (TYPl PARSCNSr-r--~----~----4--~ b • ,. . ,. .
C MAL SR SHELTER WEST ELEVATION
A001 SCALE: 3/8" = 1'-0"
8 7
STONE,
INSTALL
GEOTEXTILE FABRIC
(ENGINEERING FABRIC)
UNDER FINISHING STONE
CRUSHED STONE
D A001
INSTALL
#4 GROUNDS TO
COUNTERPOISE
FROM SERVICE
ENTRANCE INSIDE
MAL SR SHELTER EAST ELEV A TION
SCALE: 3/8" = 1'-0"
5 4
INSTALL
3/4" X 10'
COPPER CLAD
GROUND ROD
<TYP)
PTSI Managed Services Inc.
1200 District Ave Burlington, MA
781.238. 7070
RELEASED FOR,
ISSUED FOR CONSTRUCTION
2/21/2019
REV
02/21/2019 CONSTRUCTION. DT •17635 1304494 09/20/2018
APPROVED
DATE DESCRIPTION JCN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
REDLINE
DATE
APVD
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
MALSR
R/W 16 SHELTER REPLACEMENT PROJECT
SHELTER EXTERIOR ELEVATIONS
NORTH KINGSTOWN QUONSET STATE AIRPORT
REVIEWED BY
SUBMITTED BY APPROVED BY
G.NEVI
PROJECT ENGINEER MGR: ENGINEERING CENTER
RI
PL ISSUEDBY DATE 02/21/2019 JCN 1304494
1----1---+D-RA_W_N-----'-"-i ENGINEERING SERVICES >-o-RA_w_1NG-N~o~~~~---~-=-..c.,~RE'---'-'v
DESIGNED
INFRASTRUCTURE PL
CHECKED PL OQU-1304494-A001
2 I 1 ·,-,.,<' ()Pf""''!"' OD(',f)l'n(""r, ,,, l•W ., -
H
G
F
E
D
C z
"' I-z ii:.
w :, !!I e-
"' " "' " 0
C u
' A;
s o
G 0 I ~
' 0 -
.C -F
E
D
C
B
A
H H
2'-0"
D g -~
I
7 6
16'-o"
(LJ) [:] I I DI] D D
I ., I
I
(o~? (o~}
I' ., I L ,-1 . I
I I 0 n~
I u
1 , SHELTER FLOOR PLAN
' A002 1 SCALE: 1/2" = 1'-0"
q -f--
:(;I
FINISHED CEILING
I• ] MAIN INSTALL
l;J. . GROUND INSTALL 4"X4"X4" PVC
• · • PLATE 1" EMT--,.._ ni-- JUNCTION BOX ________ r-
1 ~ INSTALL ' 1==!@~6::-1== ,--= _= _= _=_ =_, =~/-1" EMT~
12" EMT -cr'-rr-rr-rr-rr' ct+=:J::P-----,q:p---q:ip----q:=i:=w--t-r- INSTALL
3/4" EMT
L~--~__Jf=i~====, F F= = i==I \_3/4" ~----,-/----~
INSTALL
2" EMT
,-,.nA--
EMT L I NS TALL 6 "X6"
'--INSTALL 2" EMT ~
FLASHER CONTROL
INSTALL 2" EMT ~2" EMT
FLASHER POWER STEADY BURN POWER
WIREWAY
1-,1 _F_I N_I_S_H_E_D_F_L_O_O_R ________ __c1_,e6_' _-0'-'-' _______________ !
/ B' SHELTER INTERIOR ELEV
,A002 SCALE: 1/2" = 1'-0"
7 6
5 4
16 1 /2"
FINISHED CEILING
I I
Ill [ l tJ
<.O <.O
FINISHED FLOOR
-/A\ SHELTER INTERIOR
,A002) SCALE: 1/2" = 1'-0"
FINISHED CEILING
I
I I
DJ 0 - J
N "' -. - [J]
FINISHED FLOOR
/ C \ SHELTER INTERIOR ELEV
1 A002' SCALE: 1/2" = 1'-0" ' .,, -
1' 0
I a
ELEV
I I I I
1' 2'
SCALE: 1/2" =
5 + 4
I
IX
1'-0"
RELEASED FOR,
2 1
FINISHED CEILING
Ill ~
VINSTALL (j)
D 2" EMT
@ V
I I 1 I I I I I
IX
CJ (V
FINISHED FLOOR
/ D' A002
SHELTER INTERIOR ELEV
SCALE: 1/2" = 1'-0"
FACILITY COMPONENT SCHEDULE
ITEM# DESCRIPTION
1 MAIN DISCONNECT 200AMP HD SUPPLIED W/SHELTER
2 TVSS SUPPLIED W/SHELTER
MAIN TRANSFER SWITCH SUPPLIED W/SHELTER
SHELTER POWER DISTRIBUTION PANEL SUPPLIED W/SHELTER
MALSR PCA SALVAGED
A/G RECEIVER SALVAGED
MALSR TRANSFORMER SALVAGED
MALSR POWER DISTRIBUTION PANEL SALVAGED
INTERFACE SALVAGED
DECODER SALVAGED
GIG RECEIVER SALVAGED
NOTES:
1, CONTRACTOR TO RE-MOUNT SALVAGED FAA EQUIPMENT AND PROVIDE
NEW CONDUIT AND WIRING BETWEEN EQUIPMENT. FAA SHALL TERMINATE
WIRING AT ALL FAA EQUIPMENT. CONTRACTOR TO MAKE ALL
REV
OTHER CONNECTIONS.
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 use 552
02/21/2019 CONSTRUCTION, OT •17635 1304494 09/20/2018
APPROVED
DATE DESCRIPTION JCN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
REDLINE
DATE APVD
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
MALSR
ISSUED FOR CONSTRUCTION
2/21/2019
R/W 16 SHELTER REPLACEMENT PROJECT
SHELTER FLOOR PLAN
AND DETAILS
NORTH KINGSTOWN QUONSET STATE AIRPORT , , RI
REVIEWED BY SUBMITTED BY 1 _..
1--~--18.F~ .,-;~ ,-; /
APPROVED BY /4/$
. G.NEV/1 IF-",,-(~~
PROJECT ENGINEER MGR: ENGINEERING CENTER
ISSUED BY DATE 02/21/2019 IJCN 1304494
1---+---+-DRA_W_N ____ ~PL ENGINEERING SERVICES r.o==RA~w:cc,NCC"G~Noc=-~~~---~~r:R::cEv'c1
DESIGNED
INFRASTRUCTURE PL
CHECKED
PL 0QU-1304494-A002
3 2
H
G
F
E
D
C z i==
"' ::, "' "' n I- "' V) n z 0
0 0
0 ~ ii Lu V)
!ll
' C ;,--. .g N
A~ " 0 n ' 0
F
E
D
C
B
A
3/16 CHOPPED FIBERGLASS
WITH WHITE GEL COAT ON ROOF
1/15/32 A.C. PLYWOOD
6-1/2" FIBERGLASS
INSULATION R-19
2x6 ROOF JOISTS
AT 12" O.C.
(CUT FOR SLOPE
OF 3/8" PER FOOT)
GENERAL NOTES
1. ALL FIBERGLASSED OPENINGS TO OVERLAP
EDGES OF THE OPENINGS AND DOOR A MINIMUM
OF 1"
5 4
ELECTRICAL NOTES
1 •
2.
3.
' llll
KANT-SAG CLIPS #RT-7
OR EQUAL TO CONNECT
TOP PLATE TO JOISTS
(EACH SIDE)
2. ALL FAN, A/C AND LOUVER OPENINGS IN WALL
TO BE CUT OUT AND FINISHED WITH INTERIOR
AND EXTERIOR BOARDS COMPLIMENTARY TO THE
SHELTER WHEN ITEMS ARE NOT INSTALLED WHEN
SHELTER WAS ORDERED
4.
5.
6.
ALL INTERIOR ELECTRICAL WORK IS SURFACE MOUNT IN
EMT CONDUIT, MINIMUM IS SIZE3,4", SEE CONDUIT LEGEND
ALL 15 & 20 AMP CIRCUITS HAVE #12 THHN WIRING
EXTERIOR GROUNDING SYSTEM METER AND SERVICE BY THE
ELECTRICAL CONTRACTOR
PANEL BOARD ENCLOSURE GROUNDING BAR AND SERVICE
ENTRANCE RACEWAY SHALL BE EFFECTIVELY BONDED TOGETHER
BROTHERS LABELING FOR ALL CIRCUITS AND ITEMS
~1/2 PLYWOOD
2x BLOCKING
WITH WHITE FRP FINISH
3/4 PLYWOOD WITH WHITE FRP FINISH
r----3" R-MAX ( R-22 l
1 1/2 R-MAX (R-11 l
1/8 INDUSTRIAL GRADE TILE I~
II l
ONE LAYER OF 1 1/8
T & G FLOORING
2 3/4 x 1 1/2 JOISTS
LAID FLAT AT 16 O.C.
11/32 B.C. PLYWOOD
1/8 CHOPPED FIBERGLASS
r 1/4 x 3 S.S. BOLT
AT 16 O.C.
l"----2x4 TOP PLATES 3. THE EXTERIOR STRIPES ARE AS FOLLOWS:
i'_ 3/16 CHOPPED
FIBERGLASS WITH
WHITE GEL COAT
AND ORANGE STRIPES
15/32 A.C. PLYWOOD
AND NAILED
"'--2x4 STUDS AT 8 O.C.
(6) 50 3/8 LONG STEEL
STRAPS WITH (29l 10d NAILS (EACH
CORNER AND ON BOTH
SIDES OF DOOR) *
lr2x4 BOTTOM PLATE
3x2x 11 GAUGE
SQUARE TUBING
LENGTH= 4' STRIPES W/ DOOR AREA WHITE
8' WIDE= 4' STRIPES
10' WIDE= 5' STRIPES
6' WIDE= 3' STRIPES
CORNERS ARE TO BE OPPOSITE
ROOF IS SOLID WHITE
DOOR TO MATCH STRIPE LAYOUT
NAILING SCHEDULE
ROOF: USE 8d NAILS AT 6" DC
AND 4" DC ON 4' ENDS
FLOOR: USE 10d NAILS AT 6" DC
AND 4" DC ON 4' ENDS
SHEAR WALLS: USE 6d NAILS AT 4" DC
LONG WALLS: USE #66G NAILS AT 4" DC
HOLES
7.
8.
9.
1 o.
11.
1 2.
1 3.
NEUTRAL BAR SHALL BE ISOLATED FROM THE GROUNDING
BAR IN PANEL BOARD. ONLY AT THE SERVICE DISCONNECT
SHALL NEUTRAL AND GROUND BAR BE BONDED TOGETHER
FLEXIBLE NONMETALLIC CONDUIT SHALL NOT BE USED
(EXCEPT ON FLEX USED WITH EXTERIOR HVAC UNIT).
USE FLEXIBLE METAL CONDUIT IF NECESSARY
ALL FEEDER ANO BRANCH CIRCUITS INCLUDING NEUTRAL
CONDUCTORS SHALL BE IDENTIFIED AT BOTH ENOS OF
CONDUCTOR W/ PANEL ANO CIRCUIT NUMBER INDICATED
PANEL BOARD ANO DISCONNECT SHALL HAVE NAME PLATES
SHOWING PERTINENT INFORMATION MADE OF RIGID PLASTIC,
AND ENGRAVED WI TH 3,a" TEXT A TT ACHED WI TH WEATHER
PROOF BONDING MATERIAL
HEATER AND A/C UNIT ARE TO BE CONNECTED SO THAT
BOTH DO NOT OPERATE AT THE SAME TIME
HEX CRIMP TO BE USED ON GROUNDING
GROUNDING TO HAVE SILICONE BRONZE BOLTS ANO NUTS
ON DOOR USE SS BOLTS AND NUTS
ALL CIRCUIT WIRING ON LINE #1 TO BE BLACK AND LINE
#2 TO BE RED
ALUMINUM STANDOFF
BRACKET
I
RED INSULATORS
SCHEDULE - PANEL
PANEL GIA 120/240V 1 PHASE
200 AMP, MAIN LUG SURFACE MOUNT
DESCRIPTION # LOAD #1 DESCRIPTION
LIGHTS , 1 ~ 2:-; HVAC UNIT
SPARE , 3 4 ,
RECEPTACLES ., 5 " 0 • RECEPTACLES
SPARE 7 a 2 GFC I RECEPT
SPARE , • 10
, 11 12
I, 13 141/ ,15 161/ t.1 17 18j/
, 19 201/
I/ ~1 221/ I, ~3 1241/
!/ 27 281/
/ 29 301/
PHASE LOAD 3430 1440
TOTAL LOAD 4870W / 240 V = 20.29 AMPS
FINISHED CEILING
L L1;4 X 6
HWH TEK
2x2 #2 EDGE
RAIL CONT.
PLT
W/W
~C3
AT
x 4.1 CHANNEL 16 o.c.
S6x12,5 BEAM
(4) 5/16" MOUNTING
r ( 20 l 3/8" HOLES
1 2
/ 7
6 11 X 12 11 X 1/4"
COPPER GROUND BAR /~ /IT RED INSULATORS
CONSTRUCTION DETAIL
SCALE: 1/2" = 1'-0"
I--
N
N
1 /2 1 1 /2
) --t-t------+
1/2 1 1/2
GROUND BAR FRONT VIEW
\.---1,-L------< c ====ccc=t==cic7==tc!Pf" ,,,,--7" X 15" PLEXIGLAS
V PROTECTION COVER
SIDE VIEW
STAINLESS STEEL
HEX HEAD BOLTS
GROUND BAR DETAILS
N
N
' I') lO
' ,,-1 /8" TH I CK STRAP .
• r-(29)-10d X 1 1/2"
- -1 /8" TH I CK STRAP
J -(29)-1Qd X 1 1/2" I- I--
TS3"x 2"x 11 GAUGE
C3 X 4,1 CHANNEL\
SCALE: 3" = 1'-0"
"' z -_J -w u Cl w :c z -u..
f78l7:f-----,_~...l=====~
DI __::-,,_
I
4"x6"x1/4" PLATE \ w/ 1 1 / 4" HOLE\ E~~:;====-"l"'~===j
FRONT VIEW SIDE VIEW
NOTE: STRAP ON EACH CORNER * ( 6 REQUIRED l
STRAP DETAILS
SCALE: 1" = 1'-0"
~G)-
I
~S6x12,5
BEAM
LIFTING EYE
SCALE: 1 1/2" = 1'-0"
I
I I I I I
I I I I
I I I I
0::
_J u..
Cl w :c z -u.. I ©i 16
CK#6 1 >-----'
----~ --- 5 i----
0~ N '-N - - i...- JV')
- <D Ir- o
N
I
-7 1/2 r-7 I
1 /2
6 6-- 000 0 0
1--------:'..ff------------------------:'...l!ll!J-
CK#6 I CK#5T
L-1
I I
I
I
I• i ! ~ , I
I , FINISHED FLOOR
72 1
@CK#1
0 CK#1 !
I I I I I I I I I
I I
9- . j
@CK#1
I I
0 CK#1
@I o' -ff_
~----------+--------"- I ~'-----:=:::-"':-c-,.--+------,,=-1--------------------' @ UCK#1 ,---;:::,· f;:==:;:;::=:::::::;:::;:::::=::::;::;==:::;::;:=:::::::;;:;:::=:::;:;::::=::;:;:==;::;:==:::::;::;::::==:::;:;:==:;::;::=:':JI ,--,--- COPPER GROUND r-- _,- LUG FOR 4/0 AWG
N
I') lO
I 96
WIRE (TYP 3l
STUDS ON EACH
-'-,_ ~ CORNER ( TYP 5 l
~ND BY DOOR
~J.U--~- S6 x 1 2. 5 BEAM
1t--+l---+l-l--~~- C3 x 4.1 CHANNEL
10' X 16 1 SKID PLAN
NOT TO SCALE
I RON 16" O. C.
S6 x 12,5 BEAM
1,1 /T.S. /i/ 3"x2"x11GAUGE
LIFTING EYES
( 4 TYP. l
CONDUIT LEGEND
1 " PVC
3/4" CONDUIT
FLEX CONDUIT
SHIP LOOSE LIST
(4) LIGHT COVERS AND BULBS
(6l TIE-DOWN PLATES (1 l FIBERGLASS DOOR HOOD W/
SILICONE AND SCREWS
(1 l EMERGENCY LIGHT BATTERY
DESIGN LOADS
400 PSF - LIVE FLOOR
70 PSF - LIVE ROOF
150 MPH - WIND
ZONE 4 - SEISMIC
- .. . :' : . : -~1""~1 ' .• ~-- '~" _,' \, . ~ / - . -. \,~· .•. ,; -·' \':.~.,,,f j,..,...,,J v'::,· .;p .r""'
·-r-,-----.-----..---------,,--------------,------,-, : FINISHED FLOOR 1
<D 26 1/2 -
I@
[ ~ CK#8
I 32 f'i"\ :: \_}__/ ..
N 39-1/4"X86-1/2"
~ 1, l- 1- ,N rn-~
I 23 i
I ' ' I
MULTI-POINT
Ii Ii@
FINISHED CEILING 23
FLOOR PLAN
SCALE= 1/2" = 1'-0"
ITEM#OTY VENDOR/PART#
1 1 DUPONT
2 1 HW TH522001003
3 2 #CBS20
4 4 COOPER #WS240A
5 1 4074
6 3 #BR20
7 5 -
8 2 CUSTOM
9 1 SQ, D #H224N
NLN 200
1 0 1 BARD
WA121-A03-XP1XXJ
11 1 SO. D
#NQOD30L225CU
MH32BE CAN
MHC32SHR COVER
MATERIAL LIST
DESCRIPTION
3'-0" X 6'-8" HEAVY DUTY DOOR HINGE RIGHT WITH
A DOOR CLOSURE, THREE-POINT LATCH, BEST CORE,
YALE LOCKSET, 24" DEEP FIBERGLASS DOOR SHIELD,
PADLOCK EYES, PAINTED WHITE, T-LATCH AND TOP
HINGE KEYCOVER WITH (2l KEYS AND (1) CORE KEY
HVAC THERMOSTAT
120V LIGHT SWITCH, 20 AMP, COMMERCIAL GRADE
4' 2-BULB FLUORESCENT LIGHTS MOUNTED ON UNISTRUT
200 A DOUBLE THROW ANO 2-1/2" ENTRANCE/ PLATE
125V RATED QUAD RECEPTACLES, 20 AMP, BROWN,
COMMERCIAL GRADE
4" THREADED NIPPLE
1" GRAY PVC EXIT AT 45" WITH SQUARE CUT EXTERIOR
END 3" CLEAR OF FIBERGLASS FOR FIELD CONNECTION
200 AMP FUSIBLE DISCONNECT 2-1/2" ENTRANCE
WITH PLATE
<NEC GROUND CONNECTED BY ELECTRICAL
CONTRACTOR IN FIELD) 2 FUSES SHIPPED LOOSE
1-TON HVAC UNIT WITH 3,6kW HEAT STRIP
STANDARD
200 AMP. MAIN LUG 20" PANEL W/ 30 CIRCUITS,
BOLT ON BREAKERS AND #CB23 GROUND LUG KIT
12 1 RAYVOSS 200A - 240V SINGLE PHASE SURGE ARRESTOR,
#120-2S-N1-3-06-A CLOSE DISCONNECT, NO 90"'s
13 1 - 100AMP ENGINE GENERATOR PLUG
14 2 - 15 - - 16 - -
1 7 1 #BXVP-1 0-DGC
18 1 #6MM-ELW-2E
19 1 #BR20
20 2 DUPONT
21 - -
22 1 CUSTOM
23 - - 24 2 6696G, 2 L060690
25 1 DUPONT
26 1 CUSTOM
27 2 CUSTOM
28 - -
29 1 CUSTOM
2" ENTRANCE WITH PLATE
2 1/2" ENTRANCE WITH PLATE
EXTERIOR LIGHT WITH PHOTOCELL WITH
4 11/16 x 2 1/4 J-BOX
EMERGENCY LIGHT
GFI BREAKER PROTECTED RECEPTACLE
6" x 12" x 1/4" GROUND BAR W/ RED INSULATORS &
STANDOFFS ON INTERIOR WITH PLASTIC COVER. MGB TO
CONNECT TO BREAKER PANEL USING #2/0 THHN GREEN
1-1/2" PVC EXITS THROUGH FLOOR
6" X 96" WIREWAY
6X8 WIREWAY ELBOW
DOOR GROUNDING
FOR GROUNDING #2 THHN GREEN IN 1" PVC
CONDUIT FROM WIREWAY TO GROUND BAR
1-1/2" PVC CONDUIT FOR GROUNDING
1" CONDUIT FOR DOOR GROUNDING
VENDOR,
ITEM#QTY PART# DESCRIPTIOI
H
G
F
E
1---------------------'N ' 1- - - - ;:-;_ O=~====== ,-~, - 30 :~
I L.J --------- I', I 1.0
: CK#2, 4 I w : i !
I I I I ~ I I ® : I I '
31 ~ <---+---1----+-------n
66 ' 1 1 I '---------!------ I I --------~'--------1 I
-z -(/)
:c /Tl
"Tl r ;o
35 D
I I I ' I I
© ! /-n 3" 0 3" 6" 9" -•------------------------bi~ ------ I --
N
REV
CK#5 Ii~
I /Tl lo I
I ' /Tl ,I ;::
111_
IZ
I'"' : !
02/21/2019 CONSTRUCTION, DT#17635
APPROVED
DATE DESCRIPTION
SCALE: 3" = 1'-0"
1' 9" 6" 3" 0
SCALE= 1 1/2" = 1'-0"
1'
1' 0 ---- 0 1'
SCALE: 1" = 1'-0"
1' 2'
SCALE= 1/2" = 1'-0"
1304494 09/20/2018
JCN REDLINE
DATE
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
1'
2'
5' I
APVD
ATO -TECHNICAL OPERATIONS EASTERN SERVICE AREA
MALSR
R/W 16 SHELTER REPLACEMENT PROJECT
10' X 16' DUPONT SHELTER
NORTH KINGSTOWN QUONSET STATE AIRPORT , RI
REVIEWED BY SUBMITTED BY . . ,AGPP.RO::'ED ::''LL£ /4,,#
8. li--;>,- ~i},(/ ·. ,v, v" ·_A(' a:#7 PROJECT ENGINEER MGR: ENGINEERING CliliiTER
DESIGNED
PL
DRAWN
ISSUED BY DATE 02/21/2019 jJCN 1304494 ENGINEERING SERVICES 1--D_RA_W_IN_G_N_o-==""--'"--L-------'-"=R"'Ev'--'
PL
CHECKED
PL
INFRASTRUCTURE OQU-1304494-A003
2 1
C
11.
w
THIS DRAWING PRODUCED ON NEW ENGLAND REGION M!CROSTATlON SYSTEM
G
F
E
D
C
B
A
-N-
7 6
EXISTING POWER
MANHOLE----
TO BE REUSED EXISTING STEADY BURN [
EXISTING 6 PR, #19 (DEB)
FLASHER CONTROL CABLE
£ POWER CABLES (DEB)
TO BE REUSED ------- ------------------ ___________ } _____ -
-- -----------..1 ~~
EXISTING FLASHER
POWER CABLES <DEB)
REMOVE 3"
GRSC RISER
TO BE REUSED ~----
EXISTING POWER I
SERVICE CABLES
TO BE REUSED ( SEE NOTE 3 ) I
CONDUIT TO BE ABANDONED---
ABANDONED
XFMR VAULT
TO REMAIN
EXISTING
POWER MANHOLE
TO REMAIN---
I
EXISTING I
WOOD FRAMED
MALSR SHELTER
10' X 12'
TO BE REMOVED
( SEE NOTE 1 )
FF]
CONCRETE SLAB
TO REMAIN
(SEE NOTE 2)
E'.i:±iJ"'"''--DE MOL I s H
CONCRETE STOOP
POWER MANHOLE j
TO REMAIN~------_...., ___ J _____________ MAL SR POWER_ SERVICE DUCTBANK _____ TO UTIL !TY
I ----------------------------------0----------------HIGH VOLTAGE_DUCTBANK _______________ _
~ GRAVEL PERIMETER ROAD~
1 DEMOLITION PLAN
D001 SCALE: 1/4" = 1'-0"
POLE #12
" REMOVE 2" RISER
CONDUITS AND DISPOSE,
I
~r- REMOVE 2" RISER
CONDUITS.AND DISPOSE,
CABLES TO BE REUSED
CABLES TO BE REUSED
E TAG DESCRIPTION ------
REMOVE 3" RISER
CONDUIT AND DISPOSE,
SERVICE CABLE TO BE REUSED
D001
I
CD
• I> > .. ,~ • I> •
SHELTER INTERIOR DEMOLITION
SCALE: 1/ 4" = 1'-0"
A MAIN DISCONNECT
B MAIN PANEL
C MALSR PCA
D A/G RCVR
E TRANSFORMER
F MALSR DIST. PNL
G INTERFACE
H DECODER
I G/G RCVR
J 2-DOOR CAB
K 2-DOOR CAB
L WORKBENCH
M A/G ANTENNA
N GIG ANTENNA
0 OFFICE CHAIR
DISPOSITION
REMOVE
REMOVE
SALVAGE
SALVAGE
SALVAGE
SALVAGE
SALVAGE
SALVAGE
SALVAGE
SALVAGE
SALVAGE
SALVAGE
SALVAGE
SALVAGE
SALVAGE
3 2 1
NOTES:
1. REMOVE OR SALVAGE EQUIPMENT SHOWN ON INTERIOR DEMOLITION
PLAN. REMOVE SPARE PARTS AND OTHER MISCELLANEOUS ITEMS AS
DIRECTED BY THE RE. PROVIDE CLEAN, DRY, STORAGE CONTAINER FOR
ALL SALVAGED MATERIALS.
2. CONCRETE BUILDING SLAB TO REMAIN. USE CARE NOT TO DAMAGE
SLAB DURING BUILDING DEMOLITION.
3. POWER SERVICE CABLES TO BE REUSED. HAND DIG CABLES AND PULL
BACK TO NEAREST MANHOLE. REMOVE CONDUIT TO EXTENT POSSIBLE.
REMAINING TO BE ABANDONED IN PLACE.
4, REVIEW HAZMAT REPORT PRIOR TO ANY DEMOLITION. PROCEED WITH
DEMOLITION AFTER ALL REQUIRED PERMITS AND CONDITIONS ARE
APPROVED BY FAA.
5. FAA WILL DISCONNECT INTERNAL WIRING FOR MALSR EQUIPMENT.
COORDINATE WITH RE.
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PARSONS~~----~---+--~
PTSI Managed Services 1200 District Ave Burlington, MA
781.238. 7070
REV
02/21/2019 CONSTRUCTION, DT •17635 1304494 09/20/2018
APPROVED
DATE DESCRIPTION JCN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
REDLINE
DATE Af'VD
L--------_:~~~~jATO - TECHNICAL OPERATIONS EASTERN SERVICE
MALSR
AREA
RELEASED FOR:
ISSUED FOR CONSTRUCTION
2/21/2019
R/W 16 SHELTER REPLACEMENT PROJECT
DEMOLITION PLAN
NORTH KINGSTOWN QUONSET STATE ~RPORT RI
REVIEWED BY
SUBMITTl:D BY APPROVED BY
G.NEVI
PROJECT ENGINEER MGR: ENGINEERING CENTER
ISSUEDBY DATE 02/21/2019 JCN 1304494
1----+---+o_RA_W_N ____ '-"-'PL ENGINEERING SERVICES '--o_RA_w-,N-G -"No""'-'"-"-'"-"-'"-L----'-"-"--'--'-'R'-'-'Ev
DESIGNED
INFRASTRUCTURE PL
CHECKED
PL OQU-1304494-D001
H
G
F
E
D
C z j::
z ii 0 ...
Lu ::, !!l
<O
"" "' "' 0
C u u ' A~ s o ' 0
G
F
E
D
C
B
A
INSTALL
EXISTING MALSR FLASHER
CONTROL, 6 PR #19 (DEB)
IN 2" GRSC, 10 FEET BEYOND EES
INSTALL
EXISTING MALSR
FLASHER POWER (DEB)
IN 2" GRSC,
10 FEET BEYOND EES
INSTALL 3" GRSC
POWER SERVICE
ENTRANCE---~
ABANDONED
TRANSFORMER
PAD TO REMAIN
EXISTING
POWER
MANHOLE
I I I
/ I
C002
F ~+-C-0-0-24 HANDHOLE
PROPOSED
MALSR SHELTER
(10' X 16')
EXISTING / I
__ l:2:i!ce -¥------ i _______________ _._ TO
CONCRETE
DOOR STOOP
METER
RACK
------------ HV ---------
EXISTING
HV POWER
MANHOLE
HIGH ENERGY GROUND BUS (GFM)
ON INSIDE WALL INSTALL (2)
250 KCMIL INSULATED
CABLES TO COUNTERPOISE
INSTALL --4/0 BARE COPPER
1 MALSR SHELTER GENERAL SITE PLAN
C001 SCALE: 1/4" = 1'-0"
INSTALL
EXISTING MALSR
STEADY BURN
POWER CABLES (DEB)
IN 2" GRSC,
10 FEET BEYOND EES
6" LAYER OF 3/4" CRUSHED STONE
OVER GEOTEXTILE FABRIC
4 FEET OUT FROM SHELTER ON
ALL SIDES
GRAVEL
PERIMETER ROAD
COUNTERPOISE
2' BGL - ALL AROUND ~---~=-r- B GROUND ROD
-~C-0_0_2__. DETAIL (TYP)
1 ', \ I
INSTALL ~- ) \ #4/0 BARE COPPER , -,, 1 /
(TO SKID LUG) , \ ,
I
' I I I I I I
1 I SHELTER ~~~-, 1
1 FOUNDATION S001 1
INSTALL
#4 INSULATED
GROUND WIRE
I I I I I I I
INSTALL 1 ~-
M
I \
// I \ / / I
~ / .,..- .,,, I I ,.......- \ I ., I /
I I I I I I
3" GRSC c;;,, -
POWER SERV I CE ~ J~ ----- fet:~::!!:::;::::=::!!::=:::::;:::~==:::!!:==::::!~.J ~ I _, I I I I I I I
I
I
I
I I I I I I I I
I I I I I
V" \_. / \
/ I / \
\ I ', TO
MANHOLE
INSTALL
GROUND ROD
(TYP AROUND
SHELTER)
I / I / 1/
D C002
C001
...., ' ' I ' I
GROUND WELL
l EX I ST I NG ACCESS ROAD J
MALSR SHELTER GROUNDING PLAN
SCALE: 1/4" = 1'-0"
INSTALL
STEEL MAST W/AIR
TERMINAL (2 PL)
PROVIDE
#4/0 BARE COPPER
(TO SKID LUG)
3 2 1
NOTES:
1, INSTALL A 6" LAYER OF 3/4" CRUSHED STONE MATERIAL OVER NEW GEOTEXTILE
FABRIC AROUND SHELTER ONCE THE NEW SHELTER FOUNDATION IS INSTALLED. 3/4" CRUSHED STONE
MATERIAL SHALL EXTEND PER PLANS. EXISTING GRASS AND GRADE SHALL BE EXCAVATED AS
NECESSARY TO ACCOMODATE NEW STONE.
2, INSTALL #4/0 BARE COPPER COUNTERPOISE WITH 4 GROUND RODS AROUND SHELTER.
EXOTHERMICALLY WELD 4/0 BARE COPPER COUNTERPOISE TO GROUND RODS. BOND
ALL GRSC AND SHELTER TD COUNTERPOISE WITH A #2 BARE COPPER CABLE. #2 BARE COPPER SHALL BE EXOTHERMICALLY WELDED AT BOTH COUNTERPOISE & GRSC. THE CONNECTIONS AT THE SHELTER CAN BE
VIA A MECHANICAL CLAMP.
3, COMPLETE AN UNDERGROUND UTILITY SWEEP TO CONFIRM CONDUIT AND CABLE LOCATIONS THEN
HAND DIG TO EXPOSE THE EXISTING MAIN POWER CABLES, THE EXISTING MALSR
POWER AND CONTROL CABLES, THE MAIN POWER CONDUIT WILL BE REPLACED WITH A NEW 3" GRSC TO THE NEW SHELTER, CABLES TO THE SHELTER SHALL BE PULLED BACK, CAREFULLY COILED, AND PROTECTED AND STORED FOR REUSE.
4, LOCATE EXISTING DEB MALSR CABLES, HAND DIG AND PULL BACK, PROTECT EXPOSED CABLES DURING SHELTER WORK. INSTALL 2" GRS CONDUIT FROM SHELTER TO 5' BEYOND COUNTERPOISE, ROUTE EXISTING CABLES THRU CONDUIT INTO SHELTER, RECONNECT ALL CABLES TO EQUIPMENT
IN SHELTER. BOND GRS CONDUIT TO EES WITH #2 BARE COPPER CABLES EXOTHERMICALLY
WELDED ON BOTH ENDS,
5. COORDINATE WITH SSC AND THE POWER COMPANY TO HAVE THE POWER SHUTDOWN TO
THE LDC SHELTER. INSTALL A NEW 3" GRSC LB WITH CONDUIT OFF THE NEW SHELTER
EXTERIOR WALL TO THE EXISTING MANHOLE ONSITE . COORDINATE WITH SSC AND THE
POWER COMPANY TO HAVE THE POWER TURNED BACK ON TO THE SHELTER.
6.
7.
8.
COORDINATE WITH AND ASSIST THE FAA SSC SITE TECHNICIAN WITH RELOCATING
AND INSTALLING THE EXISTING ELECTRONIC EQUIPMENT, AND ENVIRONMENTAL CONTROLS
FROM THE EXISTING LDC SHELTER TO THE NEW SHELTER. ALL EQUIPMENT TO BE
RELOCATED MUST BE PRTOECTED.
REMOVE THE EXISTING SHELTER AND CONCRETE STEPS AND DISPOSE OF LEGALLY OFFSITE,
COORDINATE WITH THE FAA SSC TECHNINICAN FOR ALL EQUIPMENT AND MATERIAL TO
RELOCATED. REFER TO DWG G003 FOR GFM EQUIPMENT AND DWG A002 FOR PROPOSED
EQUIPMENT LOCATIONS,
9. COORDINATE WITH THE FAA SSC AND AIR TRAFFIC BEFORE TAKING THE MALSR OUT OF SERVICE.
FAA SHALL ALSO COORDINATE WITH AT AND THE SSC PRIOR TO ANY CRANE ACTIVITY,
10, LAYOUT THE EQUIPMENT SHELTER CONCRETE PAD FOUNDATION SO THAT THE NORTHWEST
CORNER OF THE SHELTER REMAINS IN THE EXACT SAME LOCATION,
GROUNDING NOTES:
1, INSTALL NEW EARTH ELECTRODE SYSTEM (EES).
2. ALL UNDERGROUND GRSC SHALL BE GROUNDED USING A #2 AWG BARE COPPER GROUND TO THE
GROUNDING COUNTERPOISE AND/OR GROUND ROD AT EACH END.
3, EES SYSTEM CONNECTIONS TO THE SHELTER SHALL BE 24 INCHES (MINIMUM) BELOW GRADE, 4, PROVIDE AND INSTALL TWO #2 AWG BARE COPPER FACILITY SKID GROUNDS
FROM THE BUILDING SKID TO THE EES.
5, PROVIDE AND INSTALL #4 AWG INSULATED GREEN COPPER CONCUCTORS FROM THE
SHELTER DISCONNECT SWITCH, DOUBLE THROW E/G SWITCH AND TVSS TO FACILITY EES
6, CONNECT 2-250 MCM MAIN GROUND (COLOR CODED GREEN)
CONDUCTOR EXTENDING BETWEEN THE INTERIOR MAIN GROUND PLATE TO THE EES.
LIGHTNING PROTECTION NOTES:
1, INSTALL GFM CLASS 2 LIGHTNING PROTECTION (L.P.) RING AROUND TOP OF THE NEW SHELTER.
2. INSTALL TWO 24" HARGER 1224CUAT GFM AIR TERMINALS ON OPPOSITE
(CENTER) ENDS OF THE SHELTER ROOF.
3, AIR TERMINALS SHALL BE MOUNTED TO 2" GRSC RISERS, 10" ABOVE HIGHEST ANTENNA,
4, EXTEND TWO DOWN CONDUCTORS FROM L,P, RING TO THE EES SYSTEM. EXOTHERMICALLY WELD
DOWN CONDUCTORS TO GROUND ROD AT THE EES SYSTEM.
5. ADHERE L,P. SYSTEM TO NEW SHELTER BY USE OF ADHESIVE CABLE HOLDERS
AND BASES.
6, INSTALL LIGHTNING PROTECTION SYSTEM IN ACCORDANCE WITH FAA-STD-019F: LIGHTNING AND SURGE PROTECTION, GROUNDING, BONDING AND SHIELDING REQUIREMENT FOR FACILITIES AND
ELECTRONIC EQUIPMENT OR LATEST EDITION,
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PARSONS
PTSI Managed Services 1200 District Ave Burlington, MA
781.238. 7070
REV
02/21/2019 CONSTRUCTION, OT •17635 1304494 09/20/2018
APPROVED
DATE DESCRIPTION JCN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
REDLINE
DATE APVD
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
RELEASED FOR,
ISSUED FOR CONSTRUCTION
2/21/2019
MALSR
R/W 16 SHELTER REPLACEMENT PROJECT
PROPOSED SITE PLAN
NORTH KINGSTOWN QUONSET STATE ~RPORT
REVIEWED BY
SUBMITTED BY APPROVED BY
B G.NEVI
PROJECT ENGINEER
DESIGNED
RI
ISSUED BY DATE 02/21/2019 JCN PL
ENGINEERING SERVICES
1304494
DRAWN DRAWING NO REV
PL INFRASTRUCTURE
CHECKED OQU-1304494-C001 PL
H
G
F
E
D
C z Q ...
0:: ...
fl) z {i
LL
w fl)
!!l
"' <D
"' 0
C u ' A"¾ " 0
' 0
" 0
G
F
E
D
C
B
A
COMPACTED BACKFILL
WARN I NG TAPE-------+----
3" GRSC WITH EXISTING
POWER SERVICE CABLES
3"
TYP
9"
TRENCH DETAIL
NOT TO SCALE
IMPRESSED
LETTERING-----i:i==
DYED CONCRETE IF~~
(ORANGE) !DUCT
ARROWS MAY VARY TO [Ml /fe,~ ® lffi I ND I CA TE CHANGE OF 'ti_fp) 1?3)_/F" DIRECTION OF OUCT----.._1 U IJ, it;, ~
1 INCH
CHAMFER
N
INSCRIPTION MAY VARY
DEPENDING ON LOCATION
OF DUCT MARKER
VERIFY INSCRIPTION
WITH COTR/RE
C CONCRETE DUCT MARKER
C002 SCALE: 3/ 4"=1'-0"
COMPACTED BACKFILL----.._
WARN I NG TAPE-------+------,--
(4) 2" GRSC WITH MALSR
STEADY BURN POWER
3"
TYP
E
1"
TYP
TRENCH DETAIL
NOT TO SCALE
N
1/0 AWG BARE
COPPER GUARD WIRE
GRADE LINE~
:; z o_
6 AWG OR 2 AWG GROUND
B coo
~4/0 AWG BARE COPPER
/ _ COUNTERPOISE
'----,c___-
~-----EXOTHERMIC WELD
--314" X 10'-0" COPPER
CLAD STEEL GROUND ROD
TYPICAL GROUND ROD INSTALLATION
NOT TO SCALE
PVC GROUND WELL W/STEEL --.,
COVER (HARGER #362PBSJ
GROUND ROD --
6"
1 '-0"
N
GROUNDING WELL DETAIL
NOT TO SCALE
COMPACTED BACKFILL
WARN ING TAPE-------+----
2" GRSC
G C002
3"
TYP
9"
N
TRENCH DETAIL
NOT TO SCALE
HANDHOLE COVERS IDENTIFIED
WI TH "FAA-POWER" OR "FAA-CONTROL"-..___..___,,,----.._
28" HANDHOLE F-44'°0/f, COVERS c~
28" DIA
OPENING
1" CHAMFER
3/4" HOLE
(FOR #2. BARE
COPPER GNDJ
45 II
I I
I s -- ---+--- -- lO
I ,,.
I
I
• ··,--,,..~---'-•c.,·.
4 11 WALL " ,,
KNOCKOUTS
(AS REQDJ •
6,, ~ -1-"---,H-- (_) (_) 0 s . "' "' •
28"
3/4" CRUSHED STONE
WELL COMPACTED-~
KNOCKOUTS
( AS REOD J
GEOTEXTILE FABRIC
CONCRETE HANOHOLE NOTES:
1 • 2.
3.
4.
5.
6.
7.
8.
CONCRETE COMPRESSIVE STRENGTH - 5,000 PSI MINIMUM .
STEEL REINFORCEMENT - ASTM A615, GRADE 60. 1" MINIMUM COVER.
MINIMUM DESIGN LOAD - AASHTO HS20-44.
CAST IRON HANDHOLE FRAME AND COVER SHALL BE LEBARON LE-285L
AND L28C5.
INSTALLED A CRUSHED STONE SUMP UNDER ALL HANDHOLES, TOP, SIDES
AND BOTTOM OF SUMP LINED WITH A WATER PERMEABLE ENGINEERING FABRIC.
AFTER INSTALLATION OF CONDUITS THROUGH KNOCKOUTS, GROUT
AROUND CONDUIT.
CABLE SLACK LOOPS INSTALLED IN ALL HANDHOLES.
INSTALLED CABLE RACKS IN HANDHOLE, 2 SIDES MINIMUM.
F CONCRETE HANDHOLE
NOT TO SCALE
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PARSCNS~--r-------4----4--~ PTSI Managed Services 1200 District Ave Burlington, MA
781.238. 7070
REV
02/21/2019 CONSTRUCTION, OT •17635 1304494 09/20/2018
APPROVED
DATE DESCRIPTION JCN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
REDLINE
DATE APVD
L---------~~~~:__jATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
MALSR RELEASED FOR,
ISSUED FOR CONSTRUCTION
2/21/2019
R/W 16 SHELTER REPLACEMENT PROJECT
SITE DETAILS
NORTH KINGSTOWN QUONSET STATE ~RPORT RI
REVIEWED BY
APPROVED BY
G.NEVILLE
PL ISSUEDBY DATE 02/21/2019 JCN 1304494
t---+--+o=-=RAcccWccNc------'-=-1 ENGINEERING SERVICES t--D~RA-W-,N~G-NO~~~~---~~>'-'R'---'--<EV
PL INFRASTRUCTURE
DESIGNED
CHECKED PL OQU-1304494-C002
H
G
F
E
D
C z
N ::, © er: n
>- ITT
V) n z 0
0 0
0 i1)
0 ...., iil
IQ
C u N
' A! ..
'2 ' 0
:i 0 w
F
E
D
C
B
C
B C , 0:
* 0
C iii ~·· A '1:! ;::
I !:e
MO
- C' :!JN go, I
I
I I I
I
I I I I I I I I I I I
I I I
NEW MALSR
SHELTER
(GFM)
-EXISTING
POWER
MANHOLE
V INSTALL EXISTING
FEEDERS IN NEW
U. G. CONDUIT, SEE NOTE 1.
__,---3" GRSC
~ PROVIDE AND INSTALL
(GFM)
100 AMP PLUG IN FOR
PORTABLE GENERATOR
(GFM)
r---- P4 c 200A, 240VAC c \ > DOUBLE THROW
' C GFM l
P2f------L--, SERVICE ENTRANCE
TVSS
(GFM) ~ li)1
MALSR MAIN (GFM)
SAFETY SWITCH 200A, 2P
FUSED AT 100A
~ tw ~ NEC REQUIRED L__-t----_J.!.1. NEUTRAL-GROUND
~ BOND
[Z] t----/,___ __ --, ~ CONNECTED DIRECTLY
- TO COUNTERPOISE
EXOTHERMICALLY WELDED
2 AWG INSULATED GREEN
SCHEDULE - PANEL
PANEL GIA 120/240V 1 PHASE 200 AMP, MAIN LUG SURFACE MOUNT
DESCRIPTION # LOAD DESCRIPTION
LIGHTS 3
1 2
4 1/ HVAC UNIT
SPARE
RECEPTACLES 5 3I 6 RECEPTACLES
f-;R;is;RC~[N;'i;TE""R~FA'""CEa---lr,Jv E:-7f-360 ----==- 8 GFCI RECEPT
MALSR 9 ~ 101..-, FAN/LOUVER
i~ 11 38-40 1230
PHASE LOAD
TU (Al I OAD
13 141/ 17-
1-
5-
29-
1. 11 7200
18.310 / 240 V = 76.29 AMPS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I I I L-------------------------------------------------------~
ELECTRICAL DIAGRAM
NOT TO SCALE
ONELINE DIAGRAM NOTES:
1, INSTALL EXISTING FACILITY FEEDERS FROM THE NEAREST MANHOLE
INSTALL NEW CONDUIT, MINIMUM 3" GRSC.
(GFM)
2. ALL PENETRATIONS SHALL BE GROUTED ON THE OUTSIDE OF THE CONDUIT AND SEALED
ON THE INTERIOR WITH A REMOVABLE SEALING COMPOUND AFTER INSTALLATION
3.
OF CONDUIT AND CONDUCTORS.
ALL CONDUCTORS SHALL BE MINIMUM COPPER, THWN, 600V RATED. ALL BOLTED
CONNECTIONS SHALL BE VIA HYDRAULICALLY CRIMPED TWO HOLE LUGS UTILIZING
BELLVILLE WASHERS. REFER TO FAA-STD-019F FOR MECHANICAL CONNECTION
REQUIREMENTS.
EXISTING MALSR FLASHER
CONTROL, 6 PR #19 CDEBl
INSTALL GRSC CONDUIT TO
10' BEYOND EES
-41(- - - - _ ____/n\p ~---
EXISTING MALSR
2" GRSC >----<· >-----+-~-+--~
INSTALL GRSC CONDUIT
HANDHOLE
4-2" GRSC
EXISTING MALSR
STEADY BURN
P5
POWER CABLES COEBl
INSTALL GRSC CONDUIT
TO HANDHOLE
FLASHER POWEr~(~D~EB~l '.___~-~---:==J EX IS TI NG POWER CONDUIT TO H ANDHOLE ~ _ ___,_.,_,_,____...u ___ .,_,_.,_,_L.J...L...,_ ___ ~
TO BE ABANDONED IN PLACE-------__,, ~ __
3" GRSC
P1
• 1-3"
ABANDONED
TRANSFORMER
I
I
PAD TO REMAIN ~--i
EXISTING
POWER
MANHOLE
I p
EXISTING / I
FAA-P
PROPOSED
MALSR SHELTER
<10' X 16')
POWER I
_"'N"°''-~------1---------------~ TO
METER
RACK
------------ HV ---------
POLE #11
EXISTING
HV POWER
MANHOLE
THOMPSON ROAD
ED01
ELECTRICAL SITE PLAN
SCALE: 1/4"=1'-0"
---x---x----+--.~+-x-1-oo---FENCE LI NE
POLE #12 GATE
WI 3-1/C #3/0 AWG & METERING & DISCONNECT PEDESTAL
A-41
W/ 1-1 /C #2 CU GND ---
MANHOLE
SYSTEM
MALSR
SHELTER
200A DISCONNECT
W/100A FUSES
HIGH VOLTAGE
MANHOLE SYSTEM
3-1/C #3/0 AND
1-1/C #2 CU GRD IN
A 3" GRSC
3 CABLE LAYOUT
E001 NOTTO SCALE
5 4
GRAVEL
PERIMETER ROAD
PARSONS
PTSI Managed Services Inc.
1200 District Ave Burlington, MA
781.238. 7070
RELEASED FOR,
ISSUED FOR CONSTRUCTION
2/21/2019
2 1
CONDUIT/CABLE SCHEDULE
P1 3" GRSC W/3-1/C #3/0 POWER SERVICE
& 1--#2 GREEN GROUND (EXISTING) ENTRANCE
P2 2" EMT (GFMl TRANSFER SWITCH
P3 2 " EMT (GFM) MAIN DIST. PANEL
P4 1 " EMT (GFM) EG PLUG
P5 4 - 2" GRSC STEADY BURN POWER
P6 2 " GRSC FLASHER
P7 2 " GRSC FLASHER
NOTES:
1. CONTRACTOR SHALL MOUNT ALL EQUIPMENT AND PROVIDE ALL
CONDUIT AND WIRING REQUIRED FOR MALSR EQUIPMENT
RE-INSTALLATION, FAA WILL MAKE FINAL TERMINATIONS OF
ALL CABLES IN MALSR EQUIPMENT,
FOR OFFICIAL USE ONLY
COMM.
POWER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
02/21/2019 CONSTRUCTION, DT#17635 1304494 09/20/2018
APPROVED
DATE DESCRIPTION JCN
DEPARTMENT OF TRANSPORTATION
FEDERAL A VIA TI ON ADMINISTRATION
REDLINE
DATE APVD
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
MALSR
R/W 16 SHELTER REPLACEMENT PROJECT
ELECTRICAL PLAN
NORTH KINGSTOWN QUONSET STATE AIRPORT
REVIEWED BY
SUBMITTED BY
(I
APPROVED BY
G. NEVILL
PROJECT ENGINEER
DESIGNED ISSUED~Y DAT~ JCN
PL 02/21/2019
DRAWN ENGINEERING SERVICES DRAWING NO
PL INFRASTRUCTURE
CHECKED OQU-1304494-E001 PL
2 1
RI
1304494
REV
H
G
F
E
D
C
C
Al I I " 0
THIS DRAWING PRODUCED ON NEW ENGLAND REGION MICROSTATION SYSTEM
H ~
G
F
E
D
C
B
A
7 6
12'-o" 4'-0 11
EXISTING PROPOSED
CONCRETE CONCRETE
FLOOR SLAB FLOOR SLAB
ELEV: 26.5' ELEV: 26.5'
' 0 I -0
1 FOUNDATION PLAN
S001 SCALE: 1/2" = 1'-0"
EQUIPMENT SHELTER
' 'J ';/ ·, _'2._ ___ _1:_· ___ _y> _ _y __
~~~~·' -:-~;-:--- ' '' ~. ";' ~1/·-~ ,v4k~iwo'ltwJ~'J&{fli~•
S001
~12" THICK LAYER OF 3/4"
CRUSHED STONE OVER
GEOTEXTILE FABRIC
CONCRETE DOOR STEP DET~L
SCALE: 3/4" = 1'-0"
SHELTER DOOR
THRESHOLD
CONCRETE STEP
5' x 5' x 12" DEEP
WITH WIRE MESH
6" LAYER OF 3/4"
CRUSHED STONE OVER
GEOTEXTILE FABRIC
APPLY BONDING
AGENT TO JOINT
I
EXISTING
CONCRETE SLAB
#4 DOWELS@ 12" DC
6"
4'-0"
1'-6"
3 " t:, ' t:, '
' t:, ' t:, t:, ' t:, PROPOSED
CONCRETE SLAB
#4 REBAR
@ 12" DC
t:, ' t:, 3 "
.. [> ,{> I>
' 0 I
EL: 26.50
2 1
#4 REBAR @ 12" DC 12" COMPACTED
GRAVEL BASE
1'
1' 0 "-**-- 1' 0
FOUNDATION SECTION
SCALE: 1" = 1'-0"
0 1' 2'
SCALE: 1" = 1'-0"
1' 2' 3'
SCALE: 3/4" = 1'-0"
1' 2' 5'
SCALE: 1/2" = 1'-0"
NOTES:
1. OFFLOAD EQUIPMENT SHELTER WHEN IT ARRIVES ON SITE.
2.
3.
4.
5.
COORDINATE WITH AIRPORT AND SSC PRIOR TO CRANE ARRIVING ON SITE.
SHELTER IS TO BE OFF LOADED PER DUPONT (SHELTER MANUFACTURER)
METHOD.
TOP OF CONCRETE STOOP SHALL BE LEVEL WITH AND ALIGNED ACCORDINGLY
WITH SHELTER FOUNDATION. PLACE STOOP AFTER SHELTER IS IN POSITION.
SHELTER FOUNDATION SHALL BE FINISHED 3" ABOVE EXISTING GRADE.
6. COUNTERPOISE SHALL BE CONNECTED TO NEW SHELTER FRAME IN TWO
PLACES WITH DOUBLE BOLT CONNECTORS.
7.
8.
9.
CONCRETE SHALL DEVELOP 3000 PSI IN 28 DAYS WITH A MAXIMUM
SLUMP OF 3 INCHES AND A MAXIMUM AGGREGATE SIZE OF 3/4 INCHES.
ALL CONCRETE WORK SHALL COMPLY WITH ACl-304, "RECOMMENDED
PRACTICE FOR MEASURING, MIXING, AND PLACING CONCRETE": ACI-308,
"STANDARD PRACTICE FOR CURING CONCRETE": AND ACl-347, "RECOMMENDED PRACTICE FOR CONCRETE FORMWORK".
ALL REINFORCEMENT STEEL SHALL COMPLY WITH ASTM A-615, GRADE 60.
THE EXISTING GRADE SURROUNDING THE FOUNDATION SHALL BE STABILIZED
AND PROTECTED FROM EROSION DURING AND IMMEDIATELY AFTER THE
FOUNDATION INSTALLATION. GRADE SHALL BE SLOPED AWAY FROM THE SHELTER
FOUNDATION FOR DRAINAGE.
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
PARSONS~--+-----~~-~
PTSIManaged Services 1200 District Ave Burlington, MA
781.238. 7070
REV
02/21/2019 CONSTRUCTION, DT •17635
APPROVED
DATE DESCRIPTION
DEPARTMENT OF TRANSPORTATION
1304494 09/20/2018
JCN
REDLINE
DATE
FEDERAL AVIATION ADMINISTRATION
APVD
L----------=~~~~jATO - TECHNICAL OPERATIONS EASTERN SERVICE
MALSR
AREA
RELEASED FOR,
ISSUED FOR CONSTRUCTION
2/21/2019
R/W 16 SHELTER REPLACEMENT PROJECT
FOUNDATION PLAN
NORTH KINGSTOWN QUONSET STATE AIRPORT RI
REVIEWED BY
SUBMITTED BY APPROVED BY
--~-- G.NEVILLE.
PROJECT ENGINEER
02/21/2019 JCN 1304494
DRAWING NO REV
DESIGNED ISSUED BY
PL
ENGINEERING SERVICES DRAWN
OQU-1304494-S001
DG INFRASTRUCTURE
CHECKED
PL
2 1
H
G
F
E
D
C z Q:
I-
"' z
0 ...
l,J
"' !!l
"' "' "' 0
" Q
| oqu-1304494-g001 |
| oqu-1304494-g002 |
| oqu-1304494-g003 |
| oqu-1304494-a001 |
| oqu-1304494-a002 |
| oqu-1304494-a003 |
| oqu-1304494-d001 |
| oqu-1304494-c001 |
| oqu-1304494-c002 |
| oqu-1304494-e001 |
| oqu-1304494-s001 |