About this file

Walk-through questions and answers 02.13.2019 (pdf)

View the file

Other files

File Type Posted
6973GH-19-R-00030 WST clarification 01.docx DOCX document
Payment Bond.pdf PDF
SIR AMENDMENT 2 TO EXTEND CLOSE DATE 00030.pdf PDF
SIR Amendment P00003-00030.pdf PDF
Performance Bond.pdf PDF
FINAL 6973GH-19-R-00030.pdf PDF
00030 Amendment 4.pdf PDF
00030 SIR AMENDMENT 1 TO EXTEND CLOSE DATE.pdf PDF
Experience Information Form.pdf PDF
DRAWINGS TITLED RTR SHELTER REPLACEMENT WESTERY STATE AIRPORT, RI =.pdf PDF
Wage Determination RI180001.pdf PDF
REVISED=SPECIFICATIONS TITLED REMOTE TRANSMITTER RECEIVER (RTR) SHELTER REPLACEMENT.RTR —
Contractor's Release Form DOT F 4220.4.doc DOC document
Contractor's Release Form DOT F 4220.4.doc DOC document
SIR AMENDMENT 2 TO EXTEND CLOSE DATE 00030.pdf PDF
Experience Information Form.pdf PDF
DRAWINGS TITLED RTR SHELTER REPLACEMENT WESTERY STATE AIRPORT, RI =.pdf PDF
00030 SIR AMENDMENT 1 TO EXTEND CLOSE DATE.pdf PDF
Wage Determination RI180001.pdf PDF
Payment Bond.pdf PDF
SIR Amendment P00003-00030.pdf PDF
FINAL 6973GH-19-R-00030.pdf PDF
6973GH-19-R-00030 WST clarification 01.docx DOCX document
REVISED=SPECIFICATIONS TITLED REMOTE TRANSMITTER RECEIVER (RTR) SHELTER REPLACEMENT.RTR —
Performance Bond.pdf PDF
00030 SIR AMENDMENT 1 TO EXTEND CLOSE DATE.pdf PDF
Experience Information Form.pdf PDF
DRAWINGS TITLED RTR SHELTER REPLACEMENT WESTERY STATE AIRPORT, RI =.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
FINAL 6973GH-19-R-00030.pdf PDF
Performance Bond.pdf PDF
Wage Determination RI180001.pdf PDF
SIR AMENDMENT 2 TO EXTEND CLOSE DATE 00030.pdf PDF
Payment Bond.pdf PDF
REVISED=SPECIFICATIONS TITLED REMOTE TRANSMITTER RECEIVER (RTR) SHELTER REPLACEMENT.RTR —
Payment Bond.pdf PDF
REVISED=SPECIFICATIONS TITLED REMOTE TRANSMITTER RECEIVER (RTR) SHELTER REPLACEMENT.RTR —
DRAWINGS TITLED RTR SHELTER REPLACEMENT WESTERY STATE AIRPORT, RI =.pdf PDF
Wage Determination RI180001.pdf PDF
00030 SIR AMENDMENT 1 TO EXTEND CLOSE DATE.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
Performance Bond.pdf PDF
FINAL 6973GH-19-R-00030.pdf PDF
Experience Information Form.pdf PDF
Performance Bond.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
Wage Determination RI180001.pdf PDF
FINAL 6973GH-19-R-00030.pdf PDF
Experience Information Form.pdf PDF
DRAWINGS TITLED RTR SHELTER REPLACEMENT WESTERY STATE AIRPORT, RI =.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6973GH-19-R-00030-Install a new GFM fiberglass building WST RTR, Westerly Airport, RI.

Site Walkthrough Questions

1. How much will the new building weight and when will it be ready for delivery?

The new building will weigh about 9800lbs and will be ready in mid-March.

2. Who will unload building and apply for obstruction evaluation?

The FAA will obtain crane to off load and apply for obstruction evaluation (7460-1). The FAA will only provide one off load. If foundation is not ready for building on agreed upon date and time of delivery, the contractor will be responsible for moving and storing of shelter.

3. Who is responsible for FAA equipment move and cutover?

The FAA will move all electronic equipment and cutover of equipment. The contractor shall provide 2 movers for 8 hours to assist in moving of equipment.

4. Will work requiring electrical or telco outage be night work?

The Providence TRACON uses this RTR facility. Depending on the activities on the date and time of the requested outage, night work may be necessary. However, since the project will be performed during lower traffic season, night work in not likely. The WST airport is a 24 hour airport. The ASOS facility and airport Beacon light are powered by the existing building serves this airport. Again, since this is scheduled for a low traffic season, night work in unlikely.

5. Since removal of existing building is part of the contract, how much does the existing building weight?

The existing building weight approximately 8000 lbs.

6. What is the laydown area?

The FAA request the area below from the Airport Authority. Approval is pending.

7. What are the telco requirements?

Add to the bid package the circled items:

New telco pipe from new handhole to new building. The Telephone Company will install the telco line separately.