QUESTIONS AND ANWSERS.docx
DOCX document 13 KB Posted
- Solicitation number
- 6973GH-18-R-00270
About this file
QUESTIONS AND ANWSERS (docx)
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANWSERS that need to be attached to the SIR on FAACO
1. MTO-D-VOR C001 has a note to remove the metal roof. There are no other notes or details regarding this that I can find in the plans or SOW, could you please clarify intent or scope?
The whole facility shall be demolished. The Antenna or “TeePee” on top of the roof is to be carefully removed and returned to the SSC. All else shall be disposed of.
2. Are their details or spec for the new concrete staircase?
The dimensions to the concrete steps are shown in drawing MTO-D-RCO-C002. It can be precast or cast in place with 5 #4 bent bars equally spaced and #4 horizontal bars spaced at 12” O.C.
3. Are there any site pictures available?
See attached
File details come from the government source that posted it.