About this file

MTO VOR SPECIFICATIONS (pdf)

View the file

Other files

File Type Posted
Site Photos.pdf PDF
MTO VOR Drawing Set- 903248.pdf PDF
MTO VOR SPECIFICATIONS.pdf PDF
00093 SIR Amendment 0005.pdf PDF
SIR Amendment 0004 00270.pdf PDF
FINAL 6973GH-18-R-00270.pdf PDF
Wage Determination IL180002.pdf PDF
AmendSolicitation 0001.pdf PDF
00270 Amend Solicitation P00002.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
Experience Information Form.pdf PDF
Amend Solicitation P00003.pdf PDF
QUESTIONS AND ANWSERS.docx DOCX document
00093 SIR Amendment 0005.pdf PDF
Experience Information Form.pdf PDF
MTO VOR Drawing Set- 903248.pdf PDF
Amend Solicitation P00003.pdf PDF
Site Photos.pdf PDF
00270 Amend Solicitation P00002.pdf PDF
AmendSolicitation 0001.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
SIR Amendment 0004 00270.pdf PDF
QUESTIONS AND ANWSERS.docx DOCX document
FINAL 6973GH-18-R-00270.pdf PDF
Wage Determination IL180002.pdf PDF
Wage Determination IL180002.pdf PDF
MTO VOR Drawing Set- 903248.pdf PDF
QUESTIONS AND ANWSERS.docx DOCX document
AmendSolicitation 0001.pdf PDF
Site Photos.pdf PDF
MTO VOR SPECIFICATIONS.pdf PDF
SIR Amendment 0004 00270.pdf PDF
00270 Amend Solicitation P00002.pdf PDF
Experience Information Form.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
FINAL 6973GH-18-R-00270.pdf PDF
Amend Solicitation P00003.pdf PDF
AmendSolicitation 0001.pdf PDF
Amend Solicitation P00003.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
FINAL 6973GH-18-R-00270.pdf PDF
Experience Information Form.pdf PDF
00270 Amend Solicitation P00002.pdf PDF
MTO VOR Drawing Set- 903248.pdf PDF
Wage Determination IL180002.pdf PDF
QUESTIONS AND ANWSERS.docx DOCX document
MTO VOR SPECIFICATIONS.pdf PDF
Site Photos.pdf PDF
Site Photos.pdf PDF
Experience Information Form.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL AVIATION ADMINISTRATION June 5th, 2018

MTO VOR – SHELTER REPLACEMENT AND VOR DECOMISSIONING

00 01 10 – TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 SUMMARY OF WORK

01 31 00 PROJECT MANAGEMENT AND COORDINATION

01 33 00 SUBMITTAL PROCEDURES

01 60 00 PRODUCT REQUIREMENTS

01 71 33.10 PROTECTION OF WORK AND PROPERTY

01 73 00 EXECUTION

01 77 00 CLOSEOUT PROCEDURES

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 26 – ELECTRICAL

26 00 01 GENERAL PROVISIONS FOR GOVERNMENT FURNISHED EQUIPMENT (GFE)

26 05 00 COMMON WORK RESULTS FOR ELECTRICAL

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

DIVISION 31 – EARTHWORK

31 10 00 SITE CLEARING

31 20 00 EARTH MOVING

APPENDIX – ATTACHMENTS

ATTACHMENT 1 EOSH Impacts

Asbestos Work Permit CSA EOSH Checklist Form 3900-17 Form 3900-18 Form 3900-19

ATTACHMENT 2 DRAWINGS

END OF SECTION 00 01 10

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 10 00 SUMMARY

PART 1 – GENERAL

1.1 SUMMARY

A. Furnish the equipment, labor, materials, and tools required to remove the VOR Antenna and replace the shelter at County Memorial Airport (MTO) in accordance with specification and contract drawings.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: MTO VOR

1. Project Location: 432 Airport Rd, Mattoon, IL 61938

B. FAA POC: Sary Sancen, 847-294-7100

C. The work consists of, but not limited to the following:

1. Coordinate with local SSC to locate existing underground utilities and cabling prior to start of any construction.

2. Remove existing VOR Antenna. Remove all equipment inside shelter and store at approved location, with exception of the ARMS equipment.

3. Pull back VASI power and control cables and re-terminate at new power distribution panel in new pre-fabricated shelter.

3. Remove shelter, wood steps, and concrete foundations in its entirety.

4. Abandon existing RCO and DME foundations and Antenna cables 2ft below grade.

Remove existing RCO and DME antenna poles.

5. A land survey shall be conducted to establish location of DME Antenna, RCO Antenna, and elevation of building foundation.

4. Construct new concrete foundations for shelter, RCO Antenna, and DME Antenna.

5. Place pre-fabricated shelter.

6. Clean project site and work areas daily. Dispose of debris at approved waste site. Restore all areas disturbed by construction activity or vehicles per specifications.

7. Participate in CAI and address punch list items if any.

1.3 TYPE OF PROJECT

A. Project will be constructed under a single contract.

1.4 FAA-FURNISHED PRODUCTS

A. FAA will furnish products indicated. The Work includes providing support systems to receive FAA's equipment and making plumbing electronic connections.

1. FAA will arrange and pay for delivery of pre-fabricated shelter.

2. After delivery, FAA will inspect delivered items for damage. Contractor shall be present for and assist in FAA's inspection.

3. FAA will coordinate with contractor on delivery date of pre-fabricated shelter.

4. Contractor shall review Design Drawings and return them to COR noting discrepancies or anticipated problems.

5. Contractor is responsible for receiving, unloading, and handling FAA-furnished pre-fabricated shelter.

6. Contractor is responsible for protecting FAA-furnished items from damage during storage and handling.

7. If FAA-furnished items are damaged as a result of Contractor's operations, Contractor shall repair or replace them.

8. Additional Government Furnished Materials included in Section B below.

B. FAA-Furnished Products:

1. 10ft x 16ft Pre-fabricated shelter.

2. RCO Antenna

a. 30ft Pole, P/N DSF10-641A300-P3-GV-GG-AB

b. Anchor Bolts

c. Bullhorn, P/N MD112-080-01-Plate-Extension

d. Winch Device, P/N 2136

e. Outdoor Watertight Coaxial Cable, P/N LMR-400-DB (Stock No. 54091)

3. DME Antenna

a. 30ft Pole, P/N DSF10-641A300-P3-GV-GG-AB

b. Anchor Bolts

C. Report to COR immediately and contractor is responsible for repair of any damage on building or damage to any Government Furnished Products caused by construction operations. Protect all products during construction.

1.5 USE OF PREMISES

A. General: Contractor will have limited use of Airport premises for construction operations during construction period. See Construction Safety Plan Drawing.

B. Badging and Use of Site

1. Training will be required for vehicles driving inside the Airport; no badges are required.

2. Key cards will be provided if the alternate staging area to the north is used. Otherwise, the contractor shall provide a lock for the use of the south gate. See Construction Safety Plan Drawing.

3. Limit use of premises to areas within the Contract limits as indicated in the safety plan.

Do not disturb portions of Project site beyond areas in which the Work is indicated.

C. Airport Access Roads: Keep access roads serving premises clear and available to FAA, FAA's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize use of driveways and entrances.

1.6 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7 a.m. to 5 p.m., Monday through Friday, except otherwise indicated.

1. No work will be performed on weekends and federal holidays.

2. Work shall be performed during a scheduled work week of 40 hours.

3. Any work outside of the shift will be considered overtime work. The Contractor may work overtime provided the Contractor notifies the COR a minimum of 48 hours in advance of any weekend, holiday, or overtime work.

4. The start and stop times shall typically be coordinated with the schedules of the FAA COR or facility personnel to minimize or prevent the need for overtime work by FAA personnel.

B. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by FAA without prior approval by FAA.

1. Notify COR no less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without COR's written permission.

C. Expected job duration: Twenty-five business days.

D. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes.

END OF SECTION 01 10 00

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

1.1 COORDINATION

A. Coordination: Each contractor shall coordinate its construction operations with those of other contractors and entities to ensure efficient and orderly installation of each part of the Work.

B. Key Personnel Names: Within 14 calendar days of Notice To Proceed, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list telephone numbers where they can be reached during work hours.

1. Provide COR with list and keep list current at all times.

C. Requests for Information: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified to the COR.

D. All correspondence between the contractor and FAA must be through the FAA’s Contracting Officer (CO) or the Contracting Officer’s Representative (COR).

E. At no expense to the FAA, procure all construction and working permits required by local and state agencies.

F. Pre-Construction Conference: The contractor shall attend a pre-construction conference when required by the contracting officer. The contractor shall abide by all agreements reached at the conference regarding safety practices, access to site, deference to air traffic if necessary, and any other operational procedures.

G. Safety Meeting: Contractor shall hold a tailgate safety meeting prior to commencement of work each day, in the presence of the COR to discuss possible safety hazards and mitigation.

H. Air Traffic Control Safety: The Construction Contractor shall perform all work in a manner which does not conflict with, or adversely affect, the air traffic operational environment. In the event of any actual or potential conflicts, air traffic activities shall have priority over all con-struction activities.

I. All work must be accomplished by experienced workers in accordance with the highest stand-ards of the various work trades involved. Workers must abide by safety requirements, set forth by OSHA, that correspond to the type of work being performed. See EOSH documents in the Attachment 1.

END OF SECTION 01 31 00

SECTION 01 33 00 – SUBMITTAL PROCEDURE

1.1 SUBMITTALS PROCEDURES

A. Contractor shall submit list of materials for FAA approval prior to the commencement of construction.

B. In making a formal request for substitution, the Contractor represents that they have investigated the proposed product and have determined that it is equal to or superior in all respects to that specified.

C. Contractor shall submit a construction schedule which shall be approved by FAA prior to construction.

D. As-Built Drawings: Contractor shall maintain a complete set of construction drawings at the site, and make daily annotations to document as-built conditions. At project completion, and prior to final payment, the contractor shall submit red-lined as-built drawings to COR.

E. Processing Time: Allow 15 days for submittal review. A resubmittal would require additional time. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

F. Procurement Before Approval: The contractor is advised not to procure any item for which submittal approval is required but not yet granted. If approval is denied, the contractor will be prevented from installing the disapproved item(s). The contractor must transmit a new submittal package for the new items replacing the disapproved items, and must procure only approved items. The contractor shall take responsibility for the delivery and installation of any items installed before submittal approval is granted. The FAA reserves the right to discontinue field work on any item furnished without submittal approval. Procuring and/or installing material which is later disapproved could result in substantial losses of money and time for the contractor.

END OF SECTION 01 33 00

SECTION 01 60 00 S – PRODUCT REQUIREMENTS

1.1 QUALITY ASSURANCE

A. Compatibility of Options: If Contractor is given option of selecting between two or more prod-ucts for use on Project, select product compatible with products previously selected, even if previously selected products were also options.

1.2 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions.

B. Delivery and Handling:

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

3. Inspect products on delivery to determine compliance with the Contract Documents and to determine that products are undamaged and properly protected.

C. Storage:

1. Store products to allow for inspection and measurement of quantity or counting of units.

2. Store materials in a manner that will not endanger Project structure.

3. Comply with product manufacturer's written instructions for temperature, humidity, ventilation, and weather-protection requirements for storage.

5. Provide a secure location and enclosure at Project site for storage of materials and equipment by Owner's construction forces. Coordinate location with Owner.

1.3 ASBESTOS FREE CERTIFICATION

A. The contract shall provide the Contracting Officer (CO) a signed statement stating that to the best of his/her knowledge; no asbestos-containing building materials were used during the renovation, and modernization of this facility.

B. If the FAA suspects the presence of asbestos, the FAA will sample the suspect material to verify that no asbestos-containing material was utilized. This testing shall be performed at the expense of the FAA. If asbestos-containing material is subsequently found during the sam-pling of the building materials, the Contractor shall remove and replace the product or materi-al at his/her expense. In addition, the Contractor shall incur the costs of the original testing and/or any re-testing that may be necessary.

C. The Contractor shall submit to the CO Material Safety Data Sheets (MSDS), prior to con-struction, for all materials and/or products to be utilized during the course of the project ac-complishment. During the course of the project, both the COR and the Contractor shall rou-tinely check products utilized on-site to ensure only products which have had MSDS submit-ted are utilized. Copies of all MSDS shall be turned over to the local FAA office for their records.

D. If the Contractor does not submit the required information described above, the FAA shall have a complete building survey performed by a qualified testing firm prior to acceptance.

The cost of the survey and any subsequent removal/replacement of any asbestos-containing material shall be deducted from the Contractor's payment.

1.4 HAZARDOUS MATERIAL AND SAFETY

A. The Contractor shall provide workers protection per OSHA 29 CFR 1926.62.

B. The Contractor shall be responsible for safety on the work site. It is the responsibility of the Contractor to eliminate hazards which may result in tripping, electrical shock, fire, falling ob-jects, environmental hazards, vehicular accidents, etc. The Contractor shall comply with all safety precautions required by OSHA. The Contractor shall have two l5 lb. Class B and C fire extinguishers at the work area through the progress of welding, metal cutting, or any other pro-cess involving a spark or fire hazard.

END OF SECTION 01 60 00 S

SECTION 01 71 33.10 – PROTECTION OF WORK AND PROPERTY

1.1 PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE: The contractor shall be responsible for the preservation of all public and private property. The Contractor shall be responsible for all damage or injury to property of any character, during the prosecution of the work, resulting from any act, omission, neglect, or misconduct in its manner or method of executing the work, or at any time due to defective work or materials, and said responsibility will not be released until the work is completed and accepted. When or where any direct or in-direct damage or injury is done to public or private property by or on account of any act, omis-sion, neglect, or misconduct in the execution of the work, or in consequence of the nonexecu-tion thereof by the Contractor, the Contractor shall restore, at its own expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repair-ing or otherwise restoring as may be directed by the COR, or it shall make good such damage or injury in an acceptable manner, at no additional cost to the Government.

END OF SECTION 01 71 33.10

SECTION 01 73 00 – EXECUTION

1.1 INFORMATIONAL SUBMITTALS

A. Final Property Survey: Elevation of finished ground elevation and concrete footing shall be included with shelter redlines.

1.2 QUALITY ASSURANCE

A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing land-surveying services of the kind indicated.

1.3 EXAMINATION

A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities and other construction affecting the Work.

1. Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping; underground electrical services, and other utilities.

1.4 CONSTRUCTION LAYOUT

A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify COR promptly.

B. General: Lay out the Work using accepted surveying practices.

1. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project.

2. Inform installers of lines and levels to which they must comply.

3. Check the location, level and plumb, of every major element as the Work progresses.

C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement, utility slopes, and rim and invert elevations.

D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and electrical work. Transfer survey markings and elevations for use with control lines and levels.

Level foundations and piers from two or more locations.

1.5 FIELD ENGINEERING

A. Identification: Owner will identify existing benchmarks, control points, and property corners.

B. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations.

1. Do not change or relocate existing benchmarks or control points without prior written approval of COR. Report lost or destroyed permanent benchmarks or control points promptly. Report the need to relocate permanent benchmarks or control points to COR before proceeding.

2. Replace lost or destroyed permanent benchmarks and control points promptly. Base replacements on the original survey control points.

C. Certified Survey: On completion of foundation walls, major site improvements, and other work requiring field-engineering services, prepare a survey showing dimensions, locations, angles, and elevations of construction and sitework.

END OF SECTION 01 73 00

SECTION 01 77 00 – CLOSEOUT PROCEDURES

1.1 GENERAL

A. Before determination of substantial completion, submit punch list items. Items shall include but not be limited to the following:

1. Items to be completed and corrected.

2. Prepare and submit redline drawings, including final elevations of shelter. Deliver tools, spare parts, extra materials, and similar items to location designated by FAA. Label with manufacturer's name and model number where applicable.

3. Complete final cleaning requirements.

PART 2 – EXECUTION

2.1 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

c. Remove tools, construction equipment, machinery, and surplus material from Project site.

d. Sweep floors broom clean in unoccupied spaces.

e. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency.

Replace burned-out bulbs, and those noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.

f. Leave Project clean and ready for occupancy.

C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on FAA's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION 01 77 00

FEDERAL AVIATION ADMINISTRATION FEBRUARY 15, 2018

DIVISION 3 - CONCRETE

SECTION 03 30 00 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes, for the following:

1. Footings.

2. Foundation walls.

3. Slabs-on-grade.

4. Concrete toppings.

1.2 DEFINITIONS

A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Design Mixtures: For each concrete mixture.

1. Indicate amounts of mixing water to be withheld for later addition at Project site.

1.4 QUALITY ASSURANCE

A. Installer Qualifications: A qualified installer who employs on Project personnel qualified as ACI-certified Flatwork Technician and Finisher and a supervisor who is an ACI-certified Concrete Flatwork Technician.

B. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."

C. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from one source, and obtain admixtures through one source from a single manufacturer.

D. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents:

1. ACI 301, "Specification for Structural Concrete," Sections 1 through 5.

2. ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."

E. Concrete Testing Service: Engage a qualified independent testing agency to perform material evaluation tests and to design concrete mixtures.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.

PART 2 - PRODUCTS

2.1 FORM-FACING MATERIALS

A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.

1. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:

a. Medium-density overlay, Class 1 or better; mill-release agent treated and edge sealed.

B. Forms for Cylindrical Columns, Pedestals, and Supports: Metal, glass-fiber-reinforced plastic, paper, or fiber tubes that will produce surfaces with gradual or abrupt irregularities not exceeding specified formwork surface class. Provide units with sufficient wall thickness to resist plastic concrete loads without detrimental deformation.

C. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.

D. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.

1. Formulate form-release agent with rust inhibitor for steel form-facing materials.

E. Form Ties: Factory-fabricated, removable or snap-off metal or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.

1. Furnish units that will leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.

2. Furnish ties that, when removed, will leave holes no larger than 1 inch in diameter in concrete surface.

3. Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing or waterproofing.

2.2 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.

B. Deformed-Steel Welded Wire Reinforcement: ASTM A 497, flat sheet.

2.3 REINFORCEMENT ACCESSORIES

A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire according to CRSI's "Manual of Standard Practice"..

2.4 CONCRETE MATERIALS

A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:

1. Portland Cement: ASTM C 150, Type I/II. May supplement with the following:

a. Fly Ash: ASTM C 618

b. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 120.

B. Silica Fume: ASTM C 1240, amorphous silica.

C. Normal-Weight Aggregates: ASTM C 33, Class 3S coarse aggregate or better, graded.

1. Maximum Coarse-Aggregate Size 3/4 inch nominal.

2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

D. Water: ASTM C 94/C 94M and potable.

2.5 ADMIXTURES

A. Air-Entraining Admixture: ASTM C 260.

B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.

1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.

2. Retarding Admixture: ASTM C 494/C 494M, Type B.

3. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.

5. High-Range, Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type G.

6. Plasticizing and Retarding Admixture: ASTM C 1017/C 1017M, Type II.

2.6 CURING MATERIALS

A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.

B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

C. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating.

1. Products:

a. Anti-Hydro International, Inc.; AH Curing Compound #2 DR WB.

b. Burke by Edoco; Aqua Resin Cure.

c. ChemMasters; Safe-Cure Clear.

d. Conspec Marketing & Manufacturing Co., Inc., a Dayton Superior Company;

W.B. Resin Cure.

e. Dayton Superior Corporation; Day Chem Rez Cure (J-11-W).

f. Euclid Chemical Company (The); Kurez DR VOX.

g. Kaufman Products, Inc.; Thinfilm 420.

h. Lambert Corporation; Aqua Kure-Clear.

i. L&M Construction Chemicals, Inc.; L&M Cure R.

j. Meadows, W. R., Inc.; 1100 Clear.

k. Nox-Crete Products Group, Kinsman Corporation; Resin Cure E.

l. Symons Corporation, a Dayton Superior Company; Resi-Chem Clear Cure.

m. Tamms Industries, Inc.; Horncure WB 30.

n. Unitex; Hydro Cure 309.

o. US Mix Products Company; US Spec Maxcure Resin Clear.

p. Vexcon Chemicals, Inc.; Certi-Vex Enviocure 100.

2.7 CONCRETE MIXTURES, GENERAL

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.

1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.

B. Cementitious Materials: Use fly ash, pozzolan, ground granulated blast-furnace slag, and silica fume as needed to reduce the total amount of portland cement, which would otherwise be used, by not less than 40 percent. Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:

1. Fly Ash: 25 percent.

2. Combined Fly Ash and Pozzolan: 25 percent.

3. Ground Granulated Blast-Furnace Slag: 50 percent.

4. Combined Fly Ash or Pozzolan and Ground Granulated Blast-Furnace Slag: 50 percent portland cement minimum, with fly ash or pozzolan not exceeding 25 percent.

5. Silica Fume: 10 percent.

6. Combined Fly Ash, Pozzolans, and Silica Fume: 35 percent with fly ash or pozzolans not exceeding 25 percent and silica fume not exceeding 10 percent.

7. Combined Fly Ash or Pozzolans, Ground Granulated Blast-Furnace Slag, and Silica

Fume: 50 percent with fly ash or pozzolans not exceeding 25 percent and silica fume not exceeding 10 percent.

C. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement.

D. Admixtures: Use admixtures according to manufacturer's written instructions.

1. Use water-reducing or plasticizing admixture in concrete, as required, for placement and workability.

2. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.

3. Use water-reducing admixture in pumped concrete and concrete with a water-cementitious materials ratio below 0.50.

4. Use corrosion-inhibiting admixture in concrete mixtures where indicated.

2.8 CONCRETE MIXTURES FOR BUILDING ELEMENTS

A. Footings: Proportion normal-weight concrete mixture as follows:

1. Minimum Compressive Strength: 3000 psiat 28 days.

2. Maximum Water-Cementitious Materials Ratio: 0.50.

3. Slump Limit: 4 inches, plus or minus 1 inch.

4. Air Content: 6percent, plus or minus 1.5 percent at point of delivery for 3/4-inch nominal maximum aggregate size.

B. Foundation Walls: Proportion normal-weight concrete mixture as follows:

1. Minimum Compressive Strength: 3000 psi at 28 days.

2. Maximum Water-Cementitious Materials Ratio: 0.50.

3. Slump Limit: 4 inches, plus or minus 1 inch.

4. Air Content: 6percent, plus or minus 1.5 percent at point of delivery for 3/4-inch nominal maximum aggregate size.

C. Slabs-on-Grade: Proportion normal-weight concrete mixture as follows:

1. Minimum Compressive Strength: 3000 psi at 28 days.

2. Minimum Cementitious Materials Content: 470 lb/cu. yd.

3. Slump Limit: 4 inchesplus or minus 1 inch.

4. Air Content: 6percent, plus or minus 1.5 percent at point of delivery for 3/4-inch nominal maximum aggregate size.

2.9 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

2.10 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M and furnish batch ticket information.

1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.

B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Mix concrete materials in appropriate drum-type batch machine mixer.

1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than 5 minutes after ingredients are in mixer, before any part of batch is released.

2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd..

3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added. Record approximate location of final deposit in structure.

PART 3 - EXECUTION

3.1 FORMWORK

A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads.

B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.

C. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as follows:

1. Class D, 1 inchfor rough-formed finished surfaces.

D. Construct forms tight enough to prevent loss of concrete mortar.

E. Fabricate forms for easy removal without hammering or prying against concrete surfaces.

Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.

1. Do not use rust-stained steel form-facing material.

F. Chamfer: exterior corners and edges of permanently exposed concrete.

G. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.

H. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.

I. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.

3.2 EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

1. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC's "Code of Standard Practice for Steel Buildings and Bridges."

3.3 REMOVING AND REUSING FORMS

A. General: Formwork for walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 24hours after placing concrete, if concrete is hard enough to not be damaged by form-removal operations and curing and protection operations are maintained.

1. Leave formwork for slabs, and other structural elements that supports weight of concrete in place until concrete has achieved at least 70 percent of its 28-day design compressive strength.

2. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores.

B. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material will not be acceptable for exposed surfaces. Apply new form-release agent.

C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints.

Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by COR.

3.4 STEEL REINFORCEMENT

A. General: Comply with CRSI's "Manual of Standard Practice" for placing reinforcement.

B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that would reduce bond to concrete.

C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars.

1. Weld reinforcing bars according to AWS D1.4, where indicated.

D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

E. Install welded wire reinforcement in longest practicable lengths on bar supports spaced to minimize sagging. Lap edges and ends of adjoining sheets at least one mesh spacing. Offset laps of adjoining sheet widths to prevent continuous laps in either direction. Lace overlaps with wire.

3.5 JOINTS

A. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by COR.

1. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints, unless otherwise indicated. Do not continue reinforcement through sides of strip placements of floors and slabs.

2. Locate horizontal joints in walls at underside of floors.

3. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.

3.6 CONCRETE PLACEMENT

A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections have been performed.

B. Do not add water to concrete during delivery, at Project site, or during placement unless approved by COR.

C. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301.

1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.

D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated.

Deposit concrete to avoid segregation.

1. Deposit concrete in horizontal layers of depth to not exceed formwork design pressures and in a manner to avoid inclined construction joints.

2. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301.

3. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.

E. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete.

1. Consolidate concrete during placement operations so concrete is thoroughly worked around reinforcement and other embedded items and into corners.

2. Maintain reinforcement in position on chairs during concrete placement.

3. Screed slab surfaces with a straightedge and strike off to correct elevations.

4. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane, before excess bleedwater appears on the surface. Do not further disturb slab surfaces before starting finishing operations.

F. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.

1. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.

2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.

3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.

G. Hot-Weather Placement: Comply with ACI 301 and as follows:

1. Maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.

2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.

3.7 FINISHING FORMED SURFACES

A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and defects repaired and patched. Remove fins and other projections that exceed specified limits on formed-surface irregularities.

1. Apply to concrete surfaces not exposed to public view.

3.8 FINISHING SLABS

A. General: Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.

B. Float Finish: Consolidate surface with power-driven floats or by hand floating if area is small or inaccessible to power driven floats. Restraighten, cut down high spots, and fill low spots.

Repeat float passes and restraightening until surface is left with a uniform, smooth, granular texture.

3.9 CONCRETE PROTECTING AND CURING

A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 for hot-weather protection during curing.

B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.

C. Formed Surfaces: Cure formed concrete surfaces, supported slabs, and other similar surfaces. If forms remain during curing period, moist cure after loosening forms. If removing forms before end of curing period, continue curing for the remainder of the curing period.

D. Cure concrete according to ACI 308.1, by one or a combination of the following methods:

1. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period using cover material and waterproof tape.

a. Moisture cure or use moisture-retaining covers to cure concrete surfaces to receive floor coverings.

2. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period.

a. After curing period has elapsed, remove curing compound without damaging concrete surfaces by method recommended by curing compound manufacturer.

3. Curing and Sealing Compound: Apply uniformly to slabs indicated in a continuous operation by power spray or roller according to manufacturer's written instructions.

Recoat areas subjected to heavy rainfall within three hours after initial application.

Repeat process 24 hours later and apply a second coat. Maintain continuity of coating and repair damage during curing period.

3.10 CONCRETE SURFACE REPAIRS

A. Defective Concrete: Repair and patch defective areas when approved by COR. Remove and replace concrete that cannot be repaired and patched to COR's approval.

B. Repairing Formed Surfaces: Surface defects include texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections on the surface.

1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than 1/2 inch in any dimension in solid concrete, but not less than 1 inch in depth. Make edges of cuts perpendicular to concrete surface. Clean, dampen with water, and brush-coat holes and voids with bonding agent. Fill and compact with patching mortar before bonding agent has dried. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent.

2. Repair defects on surfaces exposed to view by blending white portland cement and standard portland cement so that, when dry, patching mortar will match surrounding color. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching. Compact mortar in place and strike off slightly higher than surrounding surface.

3. Repair defects on concealed formed surfaces that affect concrete's durability and structural performance as determined by COR.

C. Perform structural repairs of concrete, subject to COR's approval, using epoxy adhesive and patching mortar.

D. Repair materials and installation not specified above may be used, subject to COR's approval.

3.11 FIELD QUALITY CONTROL

A. Testing and Inspecting: Engage a special inspector to perform field tests and inspections and prepare test reports.

B. Inspections:

1. Steel reinforcement placement.

2. Steel reinforcement welding.

3. Headed bolts and studs.

4. Verification of use of required design mixture.

5. Concrete placement, including conveying and depositing.

6. Curing procedures and maintenance of curing temperature.

C. Measure floor and slab flatness and levelness according to ASTM E 1155 within 24hours of finishing.

END OF SECTION 03 30 00

DIVISION 26 – ELECTRICAL

SECTION 26 00 01 - GENERAL PROVISIONS FOR GOVERNMENT FURNISHED EQUIPMENT

(GFE)

PART 1 – GENERAL

1.1 SUMMARY

A. Contract drawings are diagrammatic only, and do not give fully dimensioned locations of various elements of work. Determine exact GFE locations from field measurements.

B. Provide the following Electrical Equipment and Systems:

1. Physical placement and securing in place of GFE electrical equipment.

2. Installation of all wiring and associated conduit in accordance with the contract drawings, and manufacturer's recommendations.

3. Special ancillary equipment not included with the product but required for installation shall be provided by the Contractor.

1.2 REFERENCES

A. The publications listed below form a part of this Specification to the extent referenced. The publications listed below are referenced as the latest edition published as of the date of this document. The publications are referred to within the text by the basic designation only.

B. National Fire Protection Association (NFPA)

1. NFPA 70, National Electrical Code.

C. Occupational Safety and Health Administration (OSHA)

1. 29 CFR 1910.7, Definitions and Requirements for a Nationally Recognized Testing Laboratory (NRTL).

D. FAA Orders and Standards:

1. FAA-STD-1217f, Electrical Work, Interior

2. FAA-STD-019e, Lightning and Surge Protection, Grounding, Bonding and Shielding Requirements for Electronic Equipment

1.3 QUALITY ASSURANCE

A. Regulatory Requirements:

1. Perform work to meet or exceed the requirements of all referenced standards indicated in paragraph 1.2 and other applicable statutes, ordinances, codes and regulations of governmental authorities having jurisdiction. Notify the Contracting Officer's Representative (COR) of known or probable code violations discovered during contract performance. Do not proceed with the work until violations have been resolved.

B. Listing and Labeling Ancillary Equipment:

1. Electrical equipment and materials required to complete the installation of GFE equipment shall be UL-listed and labeled. The terms "Listed and Labeled" as defined in NFPA 70, Article 100. Listing and labeling agency qualifications as defined in 29 CFR 1910.7.

1.4 DELIVERY, STORAGE, AND HANDLING

A. The GFE will be delivered to the COR on site. The Contractor and the COR must jointly inspect the equipment before Contractor acceptance. If equipment is deemed acceptable by both parties, the Contractor shall assume the responsibility of safely storing the equipment. The Contractor shall conduct routine inspections and verify the condition of the stored equipment.

The Contractor shall only use factory-installed lifting provisions.

1.5 PROJECT CONDITIONS

A. Determine suitable path for moving equipment out of storage.

B. Layout and coordinate work in advance and prior to any installation to avoid conflicts or interference with other work. Establish the exact location of electrical equipment based on the actual field verified dimensions of equipment furnished.

C. Coordinate conduit rough-in locations into equipment with Government provided approved drawings.

D. Provide conduits, stub-ups, sleeves, anchor bolts, and other similar items to be cast into concrete. Protect open ends of conduit prior to pouring of concrete.

E. Where unknown obstructions are encountered, notify the COR. Do not alter routing of work until approved by the COR. Revise locations and elevations from those indicated only after approval.

F. Electrical equipment sizes indicated on the drawings are generally based on specified manufacturer.

G. Maintain clearances around electrical equipment as required by NFPA 70 and all applicable codes. Establish the exact location of electrical equipment based on the actual field verified dimensions of equipment furnished.

H. Ensure that electrical work is coordinated and compatible with work shown on the civil drawings.

1.6 COORDINATION

A. Layout Work from building, verify, and be responsible for the correctness of measurements in connection with Work. Change made to major overall dimensions shown which affect the physical size, shape, or location of any part of the Work, whether due to field check or changes due to the use of equipment of a manufacturer other than that used as a basis of design shall cause no interference with other Work.

B. Cooperate and coordinate with other trades to insure that the Work can be installed properly as designed and planned without interference with other work or delay. Where interferences may occur and departures from arrangements shown are required, consult with COR.

C. Investigate the structural and finish conditions affecting the Work. Offsets, bends or other items required may not be shown due to the small scale of the Drawings; provide such offsets, bends or other items as required to meet structural or finish condition.

D. Coordinate and be responsible for the required clearances in shafts, chases, double partitions.

E. If work is installed before coordinating with other trades so as to cause interference with the work of other trades, or so as not to provide proper access for maintenance or repair, make necessary changes to correct the condition at no cost to the government.

F. Arrange for conduit spaces, chases, slots, and openings in building structure during progress of construction, to allow for any/all other installations.

G. Coordinate connection of electrical services.

PART 2 - PRODUCTS

2.1 GOVERNMENT FURNISHED EQUIPMENT

A. General: The GFE will be delivered to the COR on site who will inspect the equipment before Contractor acceptance.