QUESTIONS AND ANSWERS 11 16 22 NO 1.docx
DOCX document 13 KB Posted
- Attached to
- MARAD DGO SHORE POWER BREAKER REPLACEMENT
- Solicitation number
- 69727623Q000001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FullSizeRender 4.jpg | JPG image | |
| PIC 4.jpg | JPG image | |
| PIC 2.jpg | JPG image | |
| PIC 3.jpg | JPG image | |
| PIC 1.jpg | JPG image | |
| warehouse SP breaker.jpg | JPG image | |
| SP Breaker Service Info Plate.jpg | JPG image | |
| DGO POLAND STREET FACILITY SHORE POWER BREAKER REPLACEMENT SOW.pdf | ||
| PROVISIONS AND CLAUSES DGO REMOVAL BREAKER WH 11 10.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
11/16/2022
NUMBER 1
1. Are you needing a Manually Operated or Electrically Operated breaker?
a. If you need an electrically operated breaker, what is the control voltage needed?
The old Westinghouse breakers are manually “push button” operated, but operating springs are electrically charged up.
2. Is this breaker bolted in or is it draw out?
The Westinghouse breaker is draw out.
3. Does this breaker have any accessories? (bell alarm, shunt trip, aux switch, etc.)
a. If so what are the voltages needed on the accessories?
It has a shunt, 24/28 VDC.
4. What trip functions are you needing on the programmer? Do you have a preference of programmer?
Undervoltage and over load to start with. We have no programmer preference, although GE would be sufficient.
We also want to prevent losing a leg or phase. We’ve had problems with these old breakers losing a phase leg and not tripping.
5. How soon do you need to get the breaker delivered?
We are aiming for January 2023.