DGO POLAND STREET FACILITY SHORE POWER BREAKER REPLACEMENT SOW.pdf

PDF 211 KB Posted

Attached to
MARAD DGO SHORE POWER BREAKER REPLACEMENT Federal contract opportunity
Solicitation number
69727623Q000001
Issued by
Department of Transportation Maritime Administration

View the file

Other files for this federal contract opportunity

Other files attached to MARAD DGO SHORE POWER BREAKER REPLACEMENT, newest first.
File Type Posted
FullSizeRender 4.jpg JPG image
PIC 3.jpg JPG image
PIC 1.jpg JPG image
QUESTIONS AND ANSWERS 11 16 22 NO 1.docx DOCX document
SP Breaker Service Info Plate.jpg JPG image
warehouse SP breaker.jpg JPG image
PIC 4.jpg JPG image
PIC 2.jpg JPG image
PROVISIONS AND CLAUSES DGO REMOVAL BREAKER WH 11 10.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DGO POLAND STREET FACILITY SHORE POWER BREAKER REPLACEMENT

ITEM 001-SHORE POWER BREAKER REPLACEMENT

1. ABSTRACT

1.1. This item describes the requirement to replace existing circuit breakers located at the DGO

Poland Street Facility.

2. REFERENCES / ENCLOSURES

2.1. REFERENCES

2.1.1. International Electrotechnical Commission (IEC) 62271. Standard for High-Voltage Switchgear and Control Gear.

2.1.2. Institute of Electrical and Electronics Engineers (IEEE) C37. Standard Test Procedures for AC High-Voltage Circuit Breakers.

2.1.3. Occupational Safety and Health Administration (OSHA). 29 CFR 1910. Subparts I, R, and S.

2.2. ENCLOSURES

2.2.1. None

3. ITEM LOCATION / DESCRIPTION

3.1. MARAD Warehouse

Poland Street Facility New Orleans, LA 70146

4. GOVERNMENT FURNISHED EQUIPMENT / MATERIAL / SERVICES

4.1. Two (2) existing Eaton DS air frame circuit breakers

5. STATEMENT OF WORK

5.1. The Contractor shall furnish and deliver three (3) new modern 1600-amp circuit breakers to the MARAD Warehouse located at the Poland Street Facility.

5.2. The Contractor shall remove the existing inboard vessel Eaton DS air frame circuit breaker located at the Poland Street Facility as referenced in this statement of work. Upon removal of this breaker, the Contractor shall clean the electrical panel and install one (1) new modern breaker that was furnished in 5.1.

5.3. The Contractor shall remove the existing outboard vessel Eaton DS air frame circuit breaker located at the Poland Street Facility as referenced in this statement of work. Upon removal of this breaker, the Contractor shall clean the electrical panel and install one (1) new modern breaker that was furnished in 5.1.

5.4. Upon installation, the Contractor shall test each circuit breaker for proper operation as per IEEE C37 and IEC 62271 electrical standards.

5.5. The third new modern breaker furnished in 5.1 shall be stored in the MARAD Warehouse located at the Poland Street Facility.

6. DRAWINGS

7. DELIVERABLES

7.1. Safety Procedure

7.1.1. The Contractor shall outline all steps that will be followed to ensure the safety of personnel around the worksite. The steps shall include protection against an electrical hazard as per 29 CFR 1910.

7.1.2. The Contractor shall implement a Lock Out Tag Out procedure as per 29 CFR 1910.

7.2. Warranty

7.2.1. The Contractor shall provide a minimum 3-year warranty against all parts and workmanship within this statement of work.

7.3. Gate List

7.3.1. The Contractor shall provide a list of personnel that will require access to the Poland Street

Facility at least 24 hours prior to arrival at the facility. The list shall include First Name, Last Name, and Driver’s License State/Number.

7.4. Communication

7.4.1. The Contractor shall coordinate at least 72 hours in advance with the vessels’ Port

Engineer to schedule the power outage required to complete this statement of work. If a power outage lasting longer than 8 hours is required, the Contractor shall communicate this requirement to the Contracting Officer’s Representative and the vessels’ Port Engineer.

8. DISPOSAL

8.1. The Contractor shall be responsible for the clean-up and proper disposal of any byproduct or waste as a result of the work performed under this statement of work. Proper disposal of byproducts or waste shall follow federal, state, and local regulations.

8.2. The Contractor shall be responsible for the proper disposal of the two (2) Eaton DS air frame circuit breakers removed in 5.2 and 5.3.

9. FEDERAL HOLIDAYS

The Contractor is not required to provide service on the following U.S. Federal holidays:

New Year’s Day Labor Day Martin Luther King Jr. Day Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day