69727619Q000004-Amend_No._0003.pdf

PDF 138 KB Posted

Attached to
TS GENERAL RUDDER FY19 Drydock and Special Survey
Solicitation number
69727619Q000004
Issued by

View the file

Other files

File Type Posted
69727619Q000004-Amend_No._0004.pdf PDF
69727619Q000004-Amend_No._0002.pdf PDF
TSGR_Quotation_Pricing_Sheet.xlsx XLSX spreadsheet
69727619Q000004-Amend_No._0001.pdf PDF
Ref. 16-DWG 562-0000030 PDF
DWG BT550.Asm 35431T Bow Thruster.pdf PDF
Ref. 26-DWG 111-0000007 Scantling Profile.pdf PDF
Ref. 20-DWG 801 5988703 General Arrangement Above Main Deck.pdf PDF
Ref. 14-DWG 114-0000023C Skeg.PDF PDF
Ref. 10-DWG_243-0000224 SHAFTING DETAILS -(1 OF 2).pdf PDF
603-0000129 Draft Marks.pdf PDF
Ref. 18-DWG 801-0000036 Guidance Docking Plan.pdf PDF
Ref. 19-DWG 801-0000155 Inboard Profile Inner Bottom.pdf PDF
Ref. 9-DWG 53711-243-0000225_SHAFTING ASSY -(3 of 3).pdf PDF
Ref. 9-DWG 53711-243-0000225_SHAFTING ASSY -(2 of 3).pdf PDF
Ref. 11-DWG_243-0000224 SHAFTING DETAILS -(2 OF 2).pdf PDF
DWG. Fig. 8.3 Stern Tube Lube Oil Pipieline.pdf PDF
DWG 131-0000009 Main Deck Plating & FR.pdf PDF
Ref. 13-DWG 506-5987287 Aux Seawater System & Sea Valves.pdf PDF
Ref. 24-DWG 835-5988704 Inboard Profile.pdf PDF
Ref. 21-DWG 801-5988702 General Arrangement Main Deck & Below .pdf PDF
Ref. 25-DWG 835-5988706 Outboard Profile.pdf PDF
Ref. 27-DWG 101-0000008 Scantling Profile_C.pdf PDF
DWG No. C9911569 Waukesha Bearings Corp.pdf PDF
Ref. 22-DWG 1355-S62-1-1_Electrical One Line Diagram_RevB_80484164.pdf PDF
RFQ_69727619Q000004_TS_RUDDER_FY19_Drydock_and_Special_Survey_7.pdf PDF
Ref. 15-DWG 561-0000222F Steering Gear Arrangemnet & Details PDF
Ref. 9-DWG 53711-243-0000225_SHAFTING ASSY -(1 of 3).pdf PDF
Ref. 17-DWG 633-0000120B Cathodic Protection Schedule.pdf PDF
Tank Vent Locations.pdf PDF
DWG 631-0000119 Paint Schedule.pdf PDF
Ref. 12-DWG 243_0000228 Propulsion Shafting Allignment Procedures.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

69727619Q000004 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NEW ORLEANS LA 70130-3396

500 POYDRAS STREET SUITE 1223

MARAD-00093

HALE BOGGS BUILDING

MAR 3803

GULF ACQUISITION OFFICE

USDOT MARITIME ADMINISTRATION

01/31/20190003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/31/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

GENERAL RUDDER - FY19 DRYDOCK and SPECIAL SURVEY NO. 7

The purpose of this Amendment No. 0003 is to incorporate the following revisions to specification language.

1. Item 304: Revise Statement of Work subparagraph 5.5 to read, "5.5 Provide labor, material and equipment to hydro blast or sand blast to SSPC/SP10 near white metal blast the tank in its entirety; interior surfaces including all structural members, piping, ladders, platforms, etc., to bare metal surface. Then, the cleaned surfaces shall be high-pressure washed (3000 psi) with fresh water; all residues shall be removed and discarded by

Contractor.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Carolyn Quinn

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

02/21/2019

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

69727619Q000004/0003

2. Item 306: Revise Statement of Work subparagraph 5.2.1 to read, "Blast the entire area (approx. 3,000 sq ft.) to include six (6) inches up both sides of bulkheads and bulwarks and all associated Tank Vent Containment Barriers to SSPC/SP10 Near white metal blast."

3. Item 307: Revise Statement of Work subparagraph 5.3 to read, "Replace approx. 157 ft of 1-1/4 copper nickel piping starting at the lift station in the Motor room running forward and then up through the Refer room then over to dead end into the MSD tank. Piping shall be class

200 coated."

Additionally, the following answers to questions submitted in writing are provided:

1. Item 201: Dry docks are acceptable provided the dock is certified and provides adequate capacity so that sufficient access is provided to the vessel for all areas of the hull/rudders, propellers, anchor chains, etc.

2. Item 206, Rudder and Stern frame examination, Statement of Work 5.2.5 asks for rudder palm bolts and nuts inspections. Question: For quoting propose can we assume as a definite item the rudder removal? Answer: The base requirement is to inspect the rudders; in the event a condition is found that would require rudder removal, additional costs associated with rudder removal would be authorized in writing under the

Supplemental Growth Work clause.

3. Item 207, Propeller Inspection, maintenance and repairs (ABS). Question: The item references

Drawing No 113-1-2201-0544 and Drawing No

S3-124-123. Could you please provide those two drawings? Answer: The referenced drawings are on board the vessel and can be reviewed there.

4. Item 209, Port and Stbd stern tube and tail shaft removal/ 4.0 Owner furnished equipment / material / services Indicate Owner furnished

Stern tube lube oils seals and stern tube lube oil. Question: The statement of work 5.3.5 asks the contractor to furnish and replace fwd. and aft Kemel compact seal rings. Please clarify if

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

69727619Q000004/0003 shipyard will provide the seals? Answer: MARAD is providing the SEALS and OIL.

5. Items 301 and 302, Top End Overhaul ¿ Main

Generator / 4.0 Owner furnished equipment / materials / services. Question: Please let us know who will supply the parts. The item 4.0 doesn¿t mention either owner or shipyard furnished the parts. Answer: The Contractor shall provide parts and material for engine overhaul.

Quoters are to acknowledge receipt of this amendment by signing and returning a copy with their quotation submission.

IT Related Pur: NO

Period of Performance: 03/08/2019 to 04/19/2019

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it.