Instructions
| The FAA has password protected cells that do not require contractor input. The cells requiring input from the Offerors are green colored. | |
| Fixed Priced CLINs | For each FFP CLIN (X001, X002, X003, X004, X005, and X006, the Offerors must input the proposed monthly price in the Base and Option Period Tabs of the Section B Workbook. |
Cost Plus Fixed Fee The Cost-Type CLINs worksheet (CPFF Detail CLINs 0007, and 1007) of the cost/price workbook is for cost detail summary information organized by CLIN. The proposed pricing for the Cost Type CLINs must match and be linked to the corresponding CLIN pricing in the Base and Option Period I Tabs. The provided Cost-Type CLIN worksheets are templates containing the required level of detail for each Cost CLIN. However, the Offeror can submit its own format if it includes the required level of detail, and it is linked to the corresponding Base and Option Periods Tabs in the Section B Workbook. The Cost/Price date must be provided in Excel format with all formulas visible and unprotected. Failure to do so could possibly result in your proposal being determined as non-responsive.
Sect. B.1 and B.2 Introduction
| B.1 | General |
| The Contractor must provide all necessary services and deliver all required materials and documentation as described in the Contract Line Item Numbers (CLIN), the terms and conditions of the contract schedule and any supporting attachments. The base period of performance for System of Airports Reporting (SOAR) is one (1) year from contract award, with the option to exercise three (3), two (2) year option periods for a maximum performance period of seven (7) years. Offerors should refer to Section C – Statement of Objectives (SOO) and Section J – Appendices for related attachments and artifacts applicable to each CLIN. The Government may at any time before the dates set forth in Section F exercise any or all options by giving written notice to the Contractor. The Contractor must update all documentation and modify other support (e.g., training and maintenance) to reflect the most current configuration of the SOAR system when any options are exercised. |
| B.2 | Contract Type |
| This is an Indefinite Delivery Requirements contract which will utilize fixed price, cost plus fixed fee (CPFF), and cost reimbursable contract types to meet the requirements of the Performance Work Statement (PWS). This contract is not an order for supplies or services. Orders for supplies and services under this contract will be ordered by issuance of separate delivery/task orders. See Section I for ordering instructions. Delivery/task orders may consist of varying contract types such as fixed price, and cost reimbursable. All work must be performed at the Contractor work location or approved telework site with equivalent security and connectivity, with the exception of meetings requiring onsite participation. |
Section B.7 and B.8 Summary
| B.7 | Contract Price Summary Table | |
| B.3 - Base Period | $ 90,985.16 |
| B.4 - Option Period I | $ 184,591.68 |
| B.5 - Option Period II | $ 115,996.42 |
| B.6 - Option Period III | $ 124,306.06 |
| Total Contract Price | $ 515,879.32 |
| B.8 | Ceiling Price | $ 515,879.32 |
| The ceiling price for this contract, inclusive of options, is $TBD. The Contractor is not authorized to exceed this ceiling price without the authorization of the Contracting Officer. The Federal Aviation Administration (FAA) reserves the right to exercise some, none or all options. | |
End Section B
Section B.3 Base Period
| B.3 | Contract Line Item Numbers (CLINs) Base Period 2024 - 2025 | | | | | |
| CLIN | Description | Contract Type | Qty | Monthly Unit Price | Total Price |
| Work Area 1 | | | | | |
| 0001 | Transition In and Out | FFP | 12 | $ - 0 | $ - 0 |
| 0002 | Program Management | FFP | 12 | $ - 0 | $ - 0 |
| Work Area 2 | | | | | |
| 0003 | Operations and Maintenance | FFP | 12 | $ - 0 | $ - 0 |
| 0004 | Reporting | FFP | 12 | $ - 0 | $ - 0 |
| 0005 | Help Desk | FFP | 12 | $ - 0 | $ - 0 |
| 0006 | Security | FFP | 12 | $ - 0 | $ - 0 |
| Work Area 3 | | | | | |
| CLIN | Description | Contract Type | Total Estimated Cost | Fixed Fee | Total Estimated Cost Plus Fixed Fee (CPFF) |
| 0007 | Transform and Migrate Legacy SOAR modules | CPFF | $ - 0 | $ - 0 | $ - 0 |
| Note see Section G for detailed CLIN description and invoicing instructions | | | | | |
| CLIN | Description | Contract Type | Qty/Unit | Total Price |
| 0008 | Travel and Other Direct Cost (ODCs) | CR | 1 lot | $90,985.16 |
| BASE PERIOD TOTAL PRICE | | | | $ 90,985.16 |
Section B.4 Option Period 1
| B.4 | Contract Line Item Numbers (CLINs) Option Period I 2025 - 2027 | | | | | |
| CLIN | Description | Contract Type | Qty | Monthly Unit Price | Total Price |
| Work Area 1 | | | | | |
| 1001 | Transition In and Out | FFP | 12 | $ - 0 | $ - 0 |
| 1002 | Program Management | FFP | 12 | $ - 0 | $ - 0 |
| Work Area 2 | | | | | |
| 1003 | Operations and Maintenance | FFP | 12 | $ - 0 | $ - 0 |
| 1004 | Reporting | FFP | 12 | $ - 0 | $ - 0 |
| 1005 | Help Desk | FFP | 12 | $ - 0 | $ - 0 |
| 1006 | Security | FFP | 12 | $ - 0 | $ - 0 |
| Work Area 3 | | | | | |
| CLIN | Description | Contract Type | Total Estimated Cost | Fixed Fee | Total Estimated Cost Plus Fixed Fee (CPFF) |
| 1007 | Transform and Migrate Legacy SOAR modules | CPFF | $ - 0 | $ - 0 | $ - 0 |
| Note see Section G for detailed CLIN description and invoicing instructions | | | | | |
| CLIN | Description | Contract Type | Qty/Unit | Total Price |
| 1008 | Travel and Other Direct Cost (ODCs) | CR | 1 lot | $ 184,591.68 |
| OPTION PERIOD I TOTAL PRICE | | | | $ 184,591.68 |
Section B.5 Option Period 2
| B.5 | Contract Line Item Numbers (CLINs) Option Period II 2027 - 2029 | | | | | |
| CLIN | Description | Contract Type | Qty | Monthly Unit Price | Total Price |
| Work Area 1 | | | | | |
| 2001 | Transition In and Out | FFP | 24 | $ - 0 | $ - 0 |
| 2002 | Program Management | FFP | 24 | $ - 0 | $ - 0 |
| Work Area 2 | | | | | |
| 2003 | Operations and Maintenance | FFP | 24 | $ - 0 | $ - 0 |
| 2004 | Reporting | FFP | 24 | $ - 0 | $ - 0 |
| 2005 | Help Desk | FFP | 24 | $ - 0 | $ - 0 |
| 2006 | Security | FFP | 24 | $ - 0 | $ - 0 |
| Work Area 3 | | | | | |
| Reserved | | | | | |
| CLIN | Description | Contract Type | Qty/Unit | Total Price |
| 2008 | Travel and Other Direct Cost (ODCs) | CR | 1 lot | $ 115,996.42 |
| OPTION PERIOD I TOTAL PRICE | | | | $ 115,996.42 |
Section B.6 Option Period 3
| B.6 | Contract Line Item Numbers (CLINs) Option Period III 2029 - 2031 | | | | | |
| CLIN | Description | Contract Type | Qty | Monthly Unit Price | Total Price |
| Work Area 1 | | | | | |
| 3001 | Transition In and Out | FFP | 24 | $ - 0 | $ - 0 |
| 3002 | Program Management | FFP | 24 | $ - 0 | $ - 0 |
| Work Area 2 | | | | | |
| 3003 | Operations and Maintenance | FFP | 24 | $ - 0 | $ - 0 |
| 3004 | Reporting | FFP | 24 | $ - 0 | $ - 0 |
| 3005 | Help Desk | FFP | 24 | $ - 0 | $ - 0 |
| 3006 | Security | FFP | 24 | $ - 0 | $ - 0 |
| Work Area 3 | | | | | |
| Reserved | | | | | |
| CLIN | Description | Contract Type | Qty/Unit | Total Price |
| 3008 | Travel and Other Direct Cost (ODCs) | CR | 1 lot | $ 124,306.06 |
| OPTION PERIOD I TOTAL PRICE | | | | $ 124,306.06 |
CLIN 0007 Transf. and Migrate
| *Contractor may add/move rows (but not columns) based on contractor’s accounting practice or to include additional cost elements. | | | | | |
| CLIN 0007 | Insert POP Period | | | | |
| Direct Labor Category / Skill Level | | SOAR WBS | Direct Labor Rate | Hours | Total Dollars |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| TOTAL DIRECT LABOR | | - 0 | $ - 0 |
| Cost Base | Rate | Total |
| Fringe Benefits | $ - 0 | 0.00% | $ - 0 |
| Labor Overhead | $ - 0 | 0.00% | $ - 0 |
| G&A | $ - 0 | 0.00% | $ - 0 |
| TOTAL INDIRECTS | | | $ - 0 |
| CLIN 0007 | Insert POP Period | | |
| Subcontractor Labor | | SOAR WBS | Total Dollars |
| Subcontractor 1 | | | $ - 0 |
| Subcontractor 2 | | | $ - 0 |
| Subcontractor 3 | | | $ - 0 |
| Subcontractor 4 | | | $ - 0 |
| Subcontractor 5 | | | $ - 0 |
| Subcontractor 6 | | | $ - 0 |
| Subcontractor 7 | | | $ - 0 |
| Subcontractor 8 | | | $ - 0 |
| Subcontractor 9 | | | $ - 0 |
| Subcontractor 10 | | | $ - 0 |
| | | $ - 0 |
| TOTAL SUBCONTRACTOR LABOR | | | $0.00 |
| Material Handling* | Cost Base | Rate | Indirect Cost | Total |
| Subcontractor Material Handling | $ - 0 | 0.00% | $ - 0 | $ - 0 |
| Materials | $ - 0 | | $ - 0 | $ - 0 |
| Subtotal | | | | $ - 0 |
| G&A* | | | | |
| G&A | $ - 0 | 0.00% | $ - 0 | $ - 0 |
Subtotal Costs (Fee Base) $ - 0
| | | | Total |
| FIXED FEE | | | | $ - 0 |
| Cost | $0.00 | $ - 0 | |
| Fixed Fee % | 0% | $ - 0 | |
CLIN 1007 Transf. and Migrate
| *Contractor may add/move rows (but not columns) based on contractor’s accounting practice or to include additional cost elements. | | | | | |
| CLIN 1007 | Insert POP Period | | | | |
| Direct Labor Category / Skill Level | | SOAR WBS | Direct Labor Rate | Hours | Total Dollars |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| $ - 0 | - 0 | $ - 0 |
| TOTAL DIRECT LABOR | | - 0 | $0.00 |
| Cost Base | Rate | Total |
| Fringe Benefits | $ - 0 | 0.00% | $ - 0 |
| Labor Overhead | $ - 0 | 0.00% | $ - 0 |
| G&A | $ - 0 | 0.00% | $ - 0 |
| TOTAL INDIRECTS | | | $ - 0 |
| CLIN 1007 | Insert POP Period | | |
| Subcontractor Labor | | SOAR WBS | Total Dollars |
| Subcontractor 1 | | | $ - 0 |
| Subcontractor 2 | | | $ - 0 |
| Subcontractor 3 | | | $ - 0 |
| Subcontractor 4 | | | |
| Subcontractor 5 | | | |
| Subcontractor 6 | | | |
| Subcontractor 7 | | | |
| Subcontractor 8 | | | |
| Subcontractor 9 | | | |
| Subcontractor 10 | | | |
TOTAL SUBCONTRACTOR LABOR $0.00
| Material Handling* | Cost Base | Rate | Indirect Cost | Total |
| Subcontractor Material Handling | $ - 0 | 0.00% | $ - 0 | $ - 0 |
| Materials | $ - 0 | | $ - 0 | $ - 0 |
| Subtotal | | | | $ - 0 |
| G&A* | | | | |
| G&A | $ - 0 | 0.00% | $ - 0 | $ - 0 |
Subtotal Costs (Fee Base) $ - 0
| | | | Total |
| FIXED FEE | | | | $ - 0 |
| Cost | $ - 0 | $ - 0 | |
| Fixed Fee % | 0% | $ - 0 | |
Indirect Rate (CR CLINs) Indirect Rate (Name) Base Year Option Period 1 Option Period 2 Option Period 3