Price Model_Amendment 0001.xlsx
XLSX spreadsheet 91 KB Posted
- Attached to
- Screening Information Request (SIR) for Dual Frequency Operations (DFO) Segment 2 Federal contract opportunity
- Solicitation number
- 693KA8-21-R-00001
About this file
This Screening Information Request (SIR) solicits proposals for the Wide Area Augmentation System (WAAS) Dual Frequency Operations Segment 2 (DFO-2) program. The Federal Aviation Administration (FAA) intends to utilize GPS L1, L2, and L5 signals to maintain existing single frequency services and provide new dual frequency services for its mission critical WAAS navigation system.
Under DFO-2, the selected contractor will be required to perform technical refresh of major WAAS processing components, transition network infrastructure from dedicated circuits to FAA cloud-based services, and continue sustainment of the WAAS geostationary satellite constellation. The SIR includes a pricing model, task orders covering program management and technical refresh/enhancement activities, and historical information links. Proposals are due by the dates specified in the attached materials. The FAA aims to begin work under DFO-2 in Fiscal Year 2022 through a new contract award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DFO Segment 2 TO2_Amendment 0001.pdf | ||
| FAA_Vendor_QA_Responses_Final.pdf | ||
| FAA_SIR_693KA8-21-R-00001_DFO2_Amendment_0001.pdf | ||
| DFO Segment 2 TO1_Amendment 0001.pdf | ||
| DFO Segment 2 TO2.pdf | ||
| FAA_SIR_693KA8-21-R-00001_DFO2.pdf | ||
| DFO Segment 2 TO1.pdf | ||
| Price Model_Final.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
Instructions for Completion of Price Bid Model
There are seven (7) separate worksheets in this workbook. All seven must be completed, although not all prices will be used to calculate the Total Evaluated Price (TEP) for the DFO-2 procurement.
The TEP will be calculated by adding the proposed prices of Task Order 0001 and Task Order 0002. The labor rates will be evaluated for reasonableness, but not included in the TEP.
Tab 1. Rate Build-Up
This spreadsheet provides both the base labor rates for the Cost Reimbursable Task Order 002, as well as the fully burdened labor rates (FBLR) that will provide the basis for the Firm Fixed Price, Time and Materials and Labor Hour task orders, including Task Order 001.
The Offeror must populate the base labor rate for each labor category in both Column C and Column J. In Row 5, the Offeror must populate its indirect rates for fringe, overhead, and G&A for both work at a Government site and at the Offeror's own location (Contractor Site). A profit percentage must also be populated in Row 5, Column G and Column M. Based on the numbers inputted, fully burdened labor rates will be calculated for both locations.
These rates will automatically populate the Year 1 columns of tabs 5 and 6.
Tab 2. Task Order 001 - Program Management
This task order is T&M. The Offeror must select the labor categories it believes are required to perform the SIR requirements for Program Management. The Key Personnel for this task order have been pre-populated, but the Offeror may add any labor categories it deems necessary. The rates should match those from tab 5. If a discount is being offered, the discounted rate should be identified in Column D. If no discount is being offered, Column D should match Column C. The Offeror must populate Column E with the hours for each labor category for each year. The labor costs will calculate automatically.
Travel is a Not-to-Exceed amount that is inclusive of any indirect costs. The Offeror should not change the line for Travel.
Tab 3. Task Order 002 - Technical Refresh and Enhancement
This is a cost plus fixed fee task order.
Labor
The Offeror must select the labor categories it believes are required to perform the SIR requirements for Technical Refresh and Enhancement. The Key Personnel for this task order have been pre-populated, but the Offeror may add any labor categories it deems necessary. The Base Period - Year 1 direct labor rates rates should match the direct labor rates from tab 1, as should the indirect rates (Row 4). Any differences in the base year direct labor rates or indirect rates must be identified and explained in the Price Narrative. The Offeror must populate Column I with the hours for each labor category for each year. The labor costs will calculate automatically. Rows 58, 110, 163, 216, and 268 should all be populated with labor escalation in Column C and the appropriate indirect rates in Columns D, E, F, and G. The labor costs will populate automatically.
Materials, Travel and ODCs
Materials, Travel and ODCs are Not-to-Exceed amounts that are inclusive of any indirect costs. The Offeror should not change the lines for Materials, Travel or ODCs.
Fee
The Offeror must populate the fee amount for each of the six periods.
Tabs 4 and 5. Labor - GS and Labor - CS
The Offeror must populate Row 6 with the escalation percentages for each year on each tab. The rates will calculate automatically. These rates will become the ceiling rates for T&M and Labor Hour task orders, and the basis for any labor on future FFP task orders.
Tab 6. Materials
The Offeror should list all materials needed to satisfy its proposed approach to the requirements, including part name, number, manufacturer, and price for the base year. Escalation should be added to Row 3 and the years after year 1 will calculate accordingly.
Tab 7. Other Direct Costs
The Offeror should list all Other Direct Costs (ODC) and provide prices for each year. Rows may be added. A column may be added if the Offeror would like to identify which Task Order the ODCs belong to. The ODCs will not be included in the TEP.
1. Rate Build-Up
Government Site and Contractor Site Base Year Buildup
| Indirect Rates - Year 1 | 0.00% | 0.00% | 0.00% | 0.00% | 0.000% | 0.00% | 0.00% | 0.00% | 0.00% | 0.000% | ||||
| Labor Category | Base Rate | Fringe | Overhead | G&A | Profit | COM | T&M Rate | Base Rate | Fringe | Overhead | G&A | Profit | COM | T&M Rate |
| Government Site | Contractor Site | |||||||||||||
| Lead Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Electrical Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Electrical Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Field Implementation Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Field Implementation Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Human Factors Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Contracts Administration Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Risk Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Quality Assurance Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Quality Assurance Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| RMA Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SATNAV Subject Matter Expert | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Security Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Security Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Safety Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Safety Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Lead Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Mid-level Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Junior Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Test Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Test Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Test Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Network Engineering Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Network Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Mid-level Network Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Certification Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Tools Development Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Repair Depot Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Logistician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Repair Depot Engineer/REA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Database System Administrator | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| LRU Test Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Material Coordinator | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Configuration Management Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Configuration Management Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Writer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Hardware Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Hardware Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Contract Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Contract Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Earned Value Management Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Administrative Support | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Administrative Support | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Business Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subcontract Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Supply Chain Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Supply Chain Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Senior Scheduler | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Scheduler | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Certification Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Automated Requirement Test Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
2. Task Order 001
| Base Period - Year 1 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Contract Manager | $ - 0 | |||
| Technical Director | $ - 0 | |||
| Senior Scheduler | $ - 0 | |||
| Senior Contracts Administration Analyst | $ - 0 | |||
| Risk Manager | $ - 0 | |||
| Quality Assurance Manager | $ - 0 | |||
| Quality Assurance Technician | $ - 0 | |||
| RMA Engineer | $ - 0 | |||
| Database System Adminstrator | $ - 0 | |||
| Material Coordinator | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| Contract Specialist | $ - 0 | |||
| Earned Value Management Analyst | $ - 0 | |||
| Senior Administrative Support | $ - 0 | |||
| Administrative Support | $ - 0 | |||
| Business Manager | $ - 0 | |||
| Subcontract Manager | $ - 0 | |||
| Supply Chain Manager | $ - 0 | |||
| Supply Chain Specialist | $ - 0 | |||
| Scheduler | $ - 0 | |||
| $ - 0 | ||||
| 0 | $ - 0 |
| Base Period - Year 2 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Contract Manager | $ - 0 | |||
| Technical Director | $ - 0 | |||
| Senior Scheduler | $ - 0 | |||
| Senior Contracts Administration Analyst | $ - 0 | |||
| Risk Manager | $ - 0 | |||
| Quality Assurance Manager | $ - 0 | |||
| Quality Assurance Technician | $ - 0 | |||
| RMA Engineer | $ - 0 | |||
| Database System Adminstrator | $ - 0 | |||
| Material Coordinator | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| Contract Specialist | $ - 0 | |||
| Earned Value Management Analyst | $ - 0 | |||
| Senior Administrative Support | $ - 0 | |||
| Administrative Support | $ - 0 | |||
| Business Manager | $ - 0 | |||
| Subcontract Manager | $ - 0 | |||
| Supply Chain Manager | $ - 0 | |||
| Supply Chain Specialist | $ - 0 | |||
| Scheduler | $ - 0 | |||
| $ - 0 | ||||
| 0 | $ - 0 |
| Base Period - Year 3 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Contract Manager | $ - 0 | |||
| Technical Director | $ - 0 | |||
| Senior Scheduler | $ - 0 | |||
| Senior Contracts Administration Analyst | $ - 0 | |||
| Risk Manager | $ - 0 | |||
| Quality Assurance Manager | $ - 0 | |||
| Quality Assurance Technician | $ - 0 | |||
| RMA Engineer | $ - 0 | |||
| Database System Adminstrator | $ - 0 | |||
| Material Coordinator | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| Contract Specialist | $ - 0 | |||
| Earned Value Management Analyst | $ - 0 | |||
| Senior Administrative Support | $ - 0 | |||
| Administrative Support | $ - 0 | |||
| Business Manager | $ - 0 | |||
| Subcontract Manager | $ - 0 | |||
| Supply Chain Manager | $ - 0 | |||
| Supply Chain Specialist | $ - 0 | |||
| Scheduler | $ - 0 | |||
| $ - 0 | ||||
| 0 | $ - 0 |
| Base Period - Year 4 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Contract Manager | $ - 0 | |||
| Technical Director | $ - 0 | |||
| Senior Scheduler | $ - 0 | |||
| Senior Contracts Administration Analyst | $ - 0 | |||
| Risk Manager | $ - 0 | |||
| Quality Assurance Manager | $ - 0 | |||
| Quality Assurance Technician | $ - 0 | |||
| RMA Engineer | $ - 0 | |||
| Database System Adminstrator | $ - 0 | |||
| Material Coordinator | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| Contract Specialist | $ - 0 | |||
| Earned Value Management Analyst | $ - 0 | |||
| Senior Administrative Support | $ - 0 | |||
| Administrative Support | $ - 0 | |||
| Business Manager | $ - 0 | |||
| Subcontract Manager | $ - 0 | |||
| Supply Chain Manager | $ - 0 | |||
| Supply Chain Specialist | $ - 0 | |||
| Scheduler | $ - 0 | |||
| 0 | $ - 0 |
| Base Period - Year 5 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Contract Manager | $ - 0 | |||
| Technical Director | $ - 0 | |||
| Senior Scheduler | $ - 0 | |||
| Senior Contracts Administration Analyst | $ - 0 | |||
| Risk Manager | $ - 0 | |||
| Quality Assurance Manager | $ - 0 | |||
| Quality Assurance Technician | $ - 0 | |||
| RMA Engineer | $ - 0 | |||
| Database System Adminstrator | $ - 0 | |||
| Material Coordinator | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| Contract Specialist | $ - 0 | |||
| Earned Value Management Analyst | $ - 0 | |||
| Senior Administrative Support | $ - 0 | |||
| Administrative Support | $ - 0 | |||
| Business Manager | $ - 0 | |||
| Subcontract Manager | $ - 0 | |||
| Supply Chain Manager | $ - 0 | |||
| Supply Chain Specialist | $ - 0 | |||
| Scheduler | $ - 0 | |||
| 0 | $ - 0 |
| Base Period - Year 6 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Contract Manager | $ - 0 | |||
| Technical Director | $ - 0 | |||
| Senior Scheduler | $ - 0 | |||
| Senior Contracts Administration Analyst | $ - 0 | |||
| Risk Manager | $ - 0 | |||
| Quality Assurance Manager | $ - 0 | |||
| Quality Assurance Technician | $ - 0 | |||
| RMA Engineer | $ - 0 | |||
| Database System Adminstrator | $ - 0 | |||
| Material Coordinator | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| Contract Specialist | $ - 0 | |||
| Earned Value Management Analyst | $ - 0 | |||
| Senior Administrative Support | $ - 0 | |||
| Administrative Support | $ - 0 | |||
| Business Manager | $ - 0 | |||
| Subcontract Manager | $ - 0 | |||
| Supply Chain Manager | $ - 0 | |||
| Supply Chain Specialist | $ - 0 | |||
| Scheduler | $ - 0 | |||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 1 - Year 1 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Contract Manager | $ - 0 | |||
| Technical Director | $ - 0 | |||
| Senior Scheduler | $ - 0 | |||
| Senior Contracts Administration Analyst | $ - 0 | |||
| Risk Manager | $ - 0 | |||
| Quality Assurance Manager | $ - 0 | |||
| Quality Assurance Technician | $ - 0 | |||
| RMA Engineer | $ - 0 | |||
| Database System Adminstrator | $ - 0 | |||
| Material Coordinator | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| Contract Specialist | $ - 0 | |||
| Earned Value Management Analyst | $ - 0 | |||
| Senior Administrative Support | $ - 0 | |||
| Administrative Support | $ - 0 | |||
| Business Manager | $ - 0 | |||
| Subcontract Manager | $ - 0 | |||
| Supply Chain Manager | $ - 0 | |||
| Supply Chain Specialist | $ - 0 | |||
| Scheduler | $ - 0 | |||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 1 - Year 2 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Contract Manager | $ - 0 | |||
| Technical Director | $ - 0 | |||
| Senior Scheduler | $ - 0 | |||
| Senior Contracts Administration Analyst | $ - 0 | |||
| Risk Manager | $ - 0 | |||
| Quality Assurance Manager | $ - 0 | |||
| Quality Assurance Technician | $ - 0 | |||
| RMA Engineer | $ - 0 | |||
| Database System Adminstrator | $ - 0 | |||
| Material Coordinator | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| Contract Specialist | $ - 0 | |||
| Earned Value Management Analyst | $ - 0 | |||
| Senior Administrative Support | $ - 0 | |||
| Administrative Support | $ - 0 | |||
| Business Manager | $ - 0 | |||
| Subcontract Manager | $ - 0 | |||
| Supply Chain Manager | $ - 0 | |||
| Supply Chain Specialist | $ - 0 | |||
| Scheduler | $ - 0 | |||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 2 - Year 1 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Contract Manager | $ - 0 | |||
| Technical Director | $ - 0 | |||
| Senior Scheduler | $ - 0 | |||
| Senior Contracts Administration Analyst | $ - 0 | |||
| Risk Manager | $ - 0 | |||
| Quality Assurance Manager | $ - 0 | |||
| Quality Assurance Technician | $ - 0 | |||
| RMA Engineer | $ - 0 | |||
| Database System Adminstrator | $ - 0 | |||
| Material Coordinator | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| Contract Specialist | $ - 0 | |||
| Earned Value Management Analyst | $ - 0 | |||
| Senior Administrative Support | $ - 0 | |||
| Administrative Support | $ - 0 | |||
| Business Manager | $ - 0 | |||
| Subcontract Manager | $ - 0 | |||
| Supply Chain Manager | $ - 0 | |||
| Supply Chain Specialist | $ - 0 | |||
| Scheduler | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 2 - Year 2 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Contract Manager | $ - 0 | |||
| Technical Director | $ - 0 | |||
| Senior Scheduler | $ - 0 | |||
| Senior Contracts Administration Analyst | $ - 0 | |||
| Risk Manager | $ - 0 | |||
| Quality Assurance Manager | $ - 0 | |||
| Quality Assurance Technician | $ - 0 | |||
| RMA Engineer | $ - 0 | |||
| Database System Adminstrator | $ - 0 | |||
| Material Coordinator | $ - 0 | |||
| Technical Writer | $ - 0 | |||
| Contract Specialist | $ - 0 | |||
| Earned Value Management Analyst | $ - 0 | |||
| Senior Administrative Support | $ - 0 | |||
| Administrative Support | $ - 0 | |||
| Business Manager | $ - 0 | |||
| Subcontract Manager | $ - 0 | |||
| Supply Chain Manager | $ - 0 | |||
| Supply Chain Specialist | $ - 0 | |||
| Scheduler | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Task Order 0001 - Total LOE Hours | ||||||||||
| Base | OY1 | OY2 | Total | |||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Task Order 0001 - Total Costs | |||||||||||
| Cost Elements | Base | Option Period 1 | Option Period 2 | Total | |||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 1 | 2 | 1 | 2 | ||
| Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Travel | $ 16,648.00 | $ 16,981.00 | $ 17,321.00 | $ 17,667.00 | $ 18,021.00 | $ 18,381.00 | $ 18,749.00 | $ 19,124.00 | $ 19,506.00 | $ 19,896.00 | $ 182,294.00 |
| ODCs | $ 551,255.00 | $ 843,420.00 | $ 860,289.00 | $ 877,495.00 | $ 716,036.00 | $ 608,630.00 | $ 620,803.00 | $ 633,219.00 | $ 645,883.00 | $ 658,801.00 | $ 7,015,831.00 |
| Total | $ 567,903.00 | $ 860,401.00 | $ 877,610.00 | $ 895,162.00 | $ 734,057.00 | $ 627,011.00 | $ 639,552.00 | $ 652,343.00 | $ 665,389.00 | $ 678,697.00 | $ 7,198,125.00 |
3. Task Order 002
| Base Period - Year 1 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.000% | |||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | COM | Hourly Rate | Hours | Labor Cost |
| Lead System Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Lead Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Network Engineering Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Certification Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Tools Development Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials - NTE | $ - 0 |
| Travel - NTE | $ 3,902.00 |
| ODC - NTE | $ - 0 |
Proposed Fee $ - 0
Total Price - Year 1 $ 3,902.00
| Base Period - Year 2 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | 0.000% | ||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | COM | Hourly Rate | Hours | Labor Cost |
| Lead System Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Lead Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Network Engineering Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Certification Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Tools Development Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials - NTE | $ 8,066,840.00 |
| Travel - NTE | $ 15,360.00 |
| ODC - NTE | $ 285,012.00 |
Proposed Fee $ - 0
Total Price - Year 2 $ 8,367,212.00
| Base Period - Year 3 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | 0.000% | ||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | COM | Hourly Rate | Hours | Labor Cost |
| Lead System Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Lead Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Network Engineering Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Certification Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Tools Development Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials - NTE | $ 10,519,681.00 |
| Travel - NTE | $ 26,463.00 |
| ODC - NTE | $ 576,084.00 |
Proposed Fee $ - 0
Total Price - Year 3 $ 11,122,228.00
| Base Period - Year 4 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | 0.000% | ||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | COM | Hourly Rate | Hours | Labor Cost |
| Lead System Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Lead Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Network Engineering Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Certification Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Tools Development Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials - NTE | $ 9,375,883.00 |
| Travel - NTE | $ 73,246.00 |
| ODC - NTE | $ 522,626.00 |
Proposed Fee $ - 0
Total Price - Year 4 $ 9,971,755.00
| Base Period - Year 5 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | 0.000% | ||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | COM | Hourly Rate | Hours | Labor Cost |
| Lead System Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Lead Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Network Engineering Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Certification Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Tools Development Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials - NTE | $ 5,210,578.00 |
| Travel - NTE | $ 65,325.00 |
| ODC - NTE | $ 238,733.00 |
Proposed Fee $ - 0
Total Price - Year 5 $ 5,514,636.00
| Base Period - Year 6 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | 0.000% | ||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | COM | Hourly Rate | Hours | Labor Cost |
| Lead System Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Lead Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Network Engineering Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Certification Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Tools Development Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials - NTE | $ - 0 |
| Travel - NTE | $ 47,102.00 |
| ODC - NTE | $ - 0 |
Proposed Fee $ - 0
Total Price - Year 6 $ 47,102.00
| Task Order 0002 - Total LOE Hours | ||||||
| Base Period | Total | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Task Order 0002 - Total Costs | |||||||
| Cost Elements | Base Period | Total | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | ||
| Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Materials | $ - 0 | $ 8,066,840.00 | $ 10,519,681.00 | $ 9,375,883.00 | $ 5,210,578.00 | $ - 0 | $ 33,172,982.00 |
| Travel | $ 3,902.00 | $ 15,360.00 | $ 26,463.00 | $ 73,246.00 | $ 65,325.00 | $ 47,102.00 | $ 231,398.00 |
| ODCs | $ - 0 | $ 285,012.00 | $ 576,084.00 | $ 522,626.00 | $ 238,733.00 | $ - 0 | $ 1,622,455.00 |
| Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ 3,902.00 | $ 8,367,212.00 | $ 11,122,228.00 | $ 9,971,755.00 | $ 5,514,636.00 | $ 47,102.00 | $ 35,026,835.00 |
4. Labor - GS
Government Site Rates
| Yearly Labor Rate Escalation | ||||||||||
| CONTRACT YEARS | ||||||||||
| Fully Loaded Rates | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | YEAR 6 | YEAR 7 | YEAR 8 | YEAR 9 | YEAR 10 |
| Lead Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Electrical Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Electrical Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Field Implementation Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Field Implementation Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Human Factors Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Contracts Administration Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Program Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Risk Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quality Assurance Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quality Assurance Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| RMA Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SATNAV Subject Matter Expert | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Security Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Security Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Safety Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Safety Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Lead Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Mid-level Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Junior Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Test Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Test Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Test Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Network Engineering Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Network Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Mid-level Network Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Certification Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Tools Development Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Repair Depot Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Logistician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Repair Depot Engineer/REA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Database System Administrator | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| LRU Test Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Material Coordinator | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Configuration Management Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Configuration Management Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technical Writer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Hardware Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hardware Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technical Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contract Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contract Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Earned Value Management Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Administrative Support | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Administrative Support | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Business Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Supply Chain Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Supply Chain Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Scheduler | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Scheduler | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Certification Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Automated Requirement Test Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
5. Labor - CS
Contractor Site Rates Site Rates
| Yearly Labor Rate Escalation | ||||||||||
| CONTRACT YEARS | ||||||||||
| Fully Loaded Rates | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | YEAR 6 | YEAR 7 | YEAR 8 | YEAR 9 | YEAR 10 |
| Lead Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Electrical Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Electrical Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Field Implementation Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Field Implementation Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Human Factors Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Contracts Administration Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Program Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Risk Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quality Assurance Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quality Assurance Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| RMA Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SATNAV Subject Matter Expert | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Security Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Security Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Safety Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Safety Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Lead Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Mid-level Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Junior Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Test Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Test Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Test Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Network Engineering Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Network Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Mid-level Network Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Certification Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Tools Development Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Repair Depot Lead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Logistician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Repair Depot Engineer/REA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Database System Administrator | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| LRU Test Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Material Coordinator | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Configuration Management Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Configuration Management Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technical Writer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Hardware Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hardware Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technical Director | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contract Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contract Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Earned Value Management Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Administrative Support | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Administrative Support | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Business Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontract Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Supply Chain Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Supply Chain Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Senior Scheduler | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Scheduler | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Certification Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Automated Requirement Test Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
6. Price List - Materials
| Yearly Escalation | ||||||||||||
| Part | Part Number | Manufacturer | ||||||||||
| YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | YEAR 6 | YEAR 7 | YEAR 8 | YEAR 9 | YEAR 10 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
7. Price List - ODCs Other Direct Cost Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Total
Total $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .