693KA8-23-R-00014 Section J Attachment J-2 - CDRLs.pdf
PDF 856 KB Posted
- Attached to
- FAA Tower Simulation Systems Support - Technical Refresh Acquisition Federal contract opportunity
- Solicitation number
- 693KA8-23-R-00014
About this file
This solicitation seeks proposals for a Tower Simulation Systems support contract. The Federal Aviation Administration requires contractor support for operating, maintaining, supporting and supplying Tower Simulation Systems used for technical and operational air traffic controller training at selected air traffic control towers. Offerors must provide these services and follow submission instructions in the attachments. Proposals are due by May 15, 2023 and must be emailed to the Contracting Officer, Manish Patel, by 1PM Eastern. The Government will award an indefinite-delivery indefinite quantity contract for a base year and four option years to a single contractor. The principal NAICS code is 541512. Questions are due by April 19, 2023 and must be emailed to the Contracting Officer. The Government will respond to all questions via amendment.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
693KA8-23-R-00014
Tower Simulation System
(TSS) Support Services
Contract Data Requirements List (CDRL)
Attachment J-2
March 24, 2023 V4.1
PART III – SECTION J-2
CONTRACT DATA REQUIREMENTS LIST (CDRL)
TSS Contract Data Requirements List (CDRL) January 18, 2023
CDRL Number CDRL Name SOW Reference
Program Documents
A001 Program Management Plan (PMP)
3.2.1 – 3.2.4, 3.2.9, 3.2.13, 3.5.2.10
A002 Monthly Program Status Report 3.2.1 – 3.2.4 A003 Contractor Transition Plans 3.13 A004 Meeting Agenda 3.2.1 – 3.2.4 A005 Meeting Minutes 3.2.1 – 3.2.4 A006 Reserved
Configuration Management Documents
A007 Configuration Management (CM) Plan
3.2.10 – 3.2.12,
3.5.2.2 – 3.5.3.8, 3.6
A008 Request for Deviation / Waiver 3.2.10 – 3.2.12 A009 Specification Change Notice 3.2.10 – 3.2.12
A010 Engineering Change Proposal (ECP) 3.2.10 – 3.2.12 A011 Contract Change Proposal 3.2.10 – 3.2.12
Logistics Support Documents
A012 Integrated Logistics Support Plan (ILSP) 3.3 A013 Obsolete Parts List 3.2.7, 3.2.8 A014 Recommended Site Spares List 3.2.6
Site Documents
A015 Site Survey Plan 3.8 A016 Site Notification Letter 3.8 A017 Facility Design Criteria 3.8 A018 Site Survey In-Brief 3.8 A019 Site Survey Report 3.8
A020 As Built Drawings 3.8
PART III – SECTION J-2
Test Documents
A021 Test Plan - Factory Acceptance Test (FAT) 3.9, 3.10, 3.11, 3.16
A022 Test Procedures – FAT 3.9, 3.10, 3.11, 3.16
A023 Test Report – FAT 3.9, 3.10, 3.11, 3.16
A024 Reserved A025 Reserved
A026 Test Plan - Site Installation Verification (SIV) Test
3.2.8, 3.5.2.2, 3.5.2.3, 3.5.2.4, 3.5.2.8, 3.8, 3.12, 3.16
A027 Test Procedures – SIV
3.2.8, 3.5.2.2, 3.5.2.3, 3.5.2.4, 3.5.2.8, 3.8, 3.12, 3.16
A028 Test Report – SIV
3.2.8, 3.5.2.2, 3.5.2.3, 3.5.2.4, 3.5.2.8, 3.8, 3.12, 3.16
Training Documents
A029 Training Materials 3.2.3, 3.3, 3.4, 3.5.2.6, 3.6
A030 Reserved A031 Reserved
Technical Documents
A032 Visual Database Design Document (VDDD) 3.5.2.4 A033 Engineering Services Request 3.14
A034 Engineering and Technical Services Report
3.5.1, 3.5.2.1, 3.5.2.8, 3.6, 3.7, 3.14
693KA8-XX-D-XXXXX
PART III- SECTION J-2
General Guidelines:
The Contractor must deliver all Contract Data Requirements List (CDRL) documents for the Tower Simulation System (TSS) contract via electronic means. The Government reserves the right to request a hard copy version of any CDRL; therefore, the CDRL delivery requirement in Block 14 for a hard copy version will not reflect any “Reproducible” copies.
For all CDRLs requiring Government approval, if the Contractor does not receive the FAA’s comments after sixty (60) calendar days of document delivery and the Contractor is not notified that comments are pending, the CDRL will be considered to be approved.
Detailed Guidance for CDRL Form Blocks:
The following guidance and explanations are provided for the CDRL forms that identify the Data Items required for the TSS contract.
Block 1 – Data Item Number:
This block provides the unique identification number of the CDRL.
Block 2 – Title of Data Item:
This block provides the title of the CDRL.
Block 3 – Subtitle of Data Item:
This block provides the Subtitle, if applicable, of the CDRL.
Block 4 – Authority:
This block provides the number of the Data Item Description (DID), military specification, or military standard that defines the data content and format requirements for the CDRL.
Block 5 – Contract Reference:
This block provides the section or paragraph in the Statement of Work (SOW) or Specification that identifies the requirement for the CDRL.
Block 6 – Requiring Office:
This block provides the Government office responsible for ensuring adequacy of the CDRL and the approval authority of the CDRL.
Block 7 – DD 250 Required:
This block provides the specific requirement for inspection/acceptance of the CDRL by the Government.
Block 8 – Approval Code:
This block indicates requirement for Government approval of the CDRL. Requirements are indicated by a one or two-character code as follows:
Code Meaning
A Formal, written approval by the Government Contracting Officer (CO) or the Government
Contracting Officer Representative (COR) is required prior to final acceptance of the data item by the Government. A review and approval/disapproval recommendation for each CDRL will be provided by the Government Program Management Office (PMO) to the Government CO or COR. If the Government determines that certain of the contractual requirements for this data item are not satisfied, the Government will notify the Contractor of each deficient area and will withhold final acceptance pending corrections of all deficiencies by the Contractor. Any revisions to approved documents must also require formal written approval by the Government CO or COR.
In the event of conflict between the approved document(s) and the contract, including the TSS Specification, SOW and all referenced documents, the contract must take precedence.
N/A No Approval Required.
Block 9 – Distribution Statement Required:
This block specifies the requirement for the Contractor to mark the appropriate distribution statement on the CDRL. Each CDRL delivered under this contract must be delivered with one of the following codes as specified in each CDRL:
Code Description
A Unlimited distribution
B US Government agencies only
C US Government agencies and their contractors
D FAA and FAA contractors only
E Not applicable
F Only as directed by the FAA contracting office
X US Government agencies, private individuals, or enterprises eligible to obtain export-controlled Technical data
TBD To Be Determined, Block 16 will be used to explain when it will be determined.
Block 10 – Frequency:
This block specifies the frequency of submittal for the data item. Data of a recurring type must be submitted at the end of the reporting period established in this field unless otherwise indicated in Block 11 or 16. Codes are as follows:
Code Meaning MTHLY Monthly QRTLY Quarterly ANNLY Annually SEMIA Every six months OTIME One time ONE/R One time with revisions ASREQ As required ONE/P One time preliminary & revisions
Block 11 – As of Date:
This block will not be used.
Block 12 – Date of First Submission:
This block contains the date that the initial CDRL submission is to be delivered to the Government. This date may be an actual CALENDAR date or keyed to an event. Codes are as follows:
Code Meaning
DAC Days After Contract MAC Months After Contract DARC Days After Receipt of Comments DARO Days After Receipt of Order
Numbers used with review abbreviations indicate that the document is due X months after the specified formal review. For example, 30 DAC means that the document is due 30 days after contract award. All references to days are calendar days unless otherwise specified.
Block 13 – Date of Subsequent Submission:
For data that is submitted more than once, this block contains the requirements for all submissions after the initial submittal. Codes used are the same as those used for Block 12.
Block 14 – Distribution and Addresses:
This block specifies the addresses and the number of copies each addressee is to receive. The number of printed copies, if requested, is to the left of the slash. All copies will be of camera ready/reproducible quality, i.e.;
reproduced copies are legible and easily readable. The number of copies required in electronic format is indicated to the right of the slash. Unless otherwise indicated on the CDRL, the electronic format will be delivered via email or FTP server, compatible with Microsoft Windows/Office Suite of products, and as approved by the Government. Electronic submissions must be in accordance with FAA Order 1600.75. The designation "LT" indicates that a copy of the Letter of Transmittal only is required for that addressee. For CDRLs containing color, drawings and/or paper size other than 8 x 11, Contractor must provide a hard copy of the entire CDRL delivery to the appropriate office(s) as identified in block 14, if requested. All Electronic submissions will be the property of the FAA and the FAA reserves the right to reproduce all documents for FAA use.
Copies of CDRLs must be provided electronically to the following Government personnel as follows:
• AJI-4130 (PB): Palmer.Bryan@faa.gov
• AJI-2110 (MP): Michael.Pasquini@faa.gov
• AAQ-310 (WM): Manish.Patel@faa.gov
Block 15 – Total Copies:
This block specifies the total number of copies required. It should be the sum of the number of copies sent to each addressee.
Block 16 – Remarks:
This block contains pertinent data item information not specified elsewhere on the form. It also contains amplification and clarification data for other blocks.
mailto:Palmer.Bryan@faa.gov mailto:Michael.Pasquini@faa.gov mailto:Manish.Patel@faa.gov
CONTRACT DATA REQUIREMENTS LIST
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A001 PROGRAM MANAGEMENT PLAN (PMP) N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-PM-001 (SEE BLOCK 16) SOW 3.2 THRU 3.2.13 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ONE/R
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A 30 DAC (SEE BLOCK 16) SEE BLOCK 16
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
AJI-4130 (PB) 0 1 0
AAQ-310 (MP) 0 1 0
(A) TOTAL 0 3 0 (B) TOTAL 0 0 0
15. TOTAL OF A & B 0 / 3 / 0
16: REMARKS
4: DISCUSSION OF “PRODUCTION MANAGEMENT” TO BE CONCENTRATED ON EFFORTS TO PROVIDE COTS/NDI PRODUCTS VERSUS
CUSTOMIZED OR DESIGNED PRODUCTS.
13: SUBMIT REVISED PMP AS REQUIRED WITHIN 30 DAYS OF ANY CHANGE BEING IDENTIFIED DURING CONTRACT PERIOD.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
FAA / AJI-2110
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A002 MONTHLY PROGRAM STATUS REPORT N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-PM-002 SOW 3.2.1 – 3.2.4 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A N/A D MTHLY
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 SEE BLOCK 16
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
16: REMARKS
12 & 13: ALL SUBMISSIONS ARE DUE WITHIN 15 DAYS AFTER THE LAST DAY OF THE PRECEDING MONTH.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 15 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE CDRL AS REQUIRED AND RESUBMIT THE CDRL WITHIN 15 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A003 CONTRACTOR TRANSITION PLAN N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-PM-003 SOW 3.13 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ONE/R
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A (SEE BLOCK 16) SEE BLOCK 16
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
(A) TOTAL 3 0 (B) TOTAL 0 0 0
12: GUIDANCE PROVIDED IN SECTION 3.13 OF THE TSS SOW.
13: GUIDANCE PROVIDED IN SECTION 3.13 OF THE TSS SOW.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A004 MEETING AGENDA N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-PM-004 SOW 3.2.1 – 3.2.4 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D EACH EVENT
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
10: SUBMIT AGENDAS FOR ALL FORMAL CONFERENCES, MEETINGS, REVIEWS, AUDITS AND EVALUATIONS INVOLVING FAA
PERSONNEL.
12: SUBMIT AGENDA FOR GOVERNMENT APPROVAL NLT 10 DAYS PRIOR TO EVENT.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 4 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR MUST
UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 4 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A005 MEETING MINUTES N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-PM-005 SOW 3.2.1 – 3.2.4 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D EACH EVENT
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
AJI-4130 (PB) 0 1 0
ATTENDEES SEE BLK 16
16: REMARKS
10: SUBMIT MINUTES FOR ALL FORMAL CONFERENCES, MEETINGS, REVIEWS, AUDITS AND EVALUATIONS INVOLVING FAA
PERSONNEL.
12: SUBMIT MINUTES FOR GOVERNMENT APPROVAL NLT 10 DAYS AFTER EACH EVENT.
14: DISTRIBUTION – ELECTRONIC COPY TO EACH ATTENDEE.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 10 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 10 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A007 CONFIGURATION MANAGEMENT (CM) PLAN N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-CM-001 SEE BLOCK 16 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ONE/R
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A 30 DAC SEE BLOCK 16
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
5: SOW 3.2.10 – 3.2.12, 3.5.2.2 – 3.5.3.8, 3.6
13: SUBMIT UPDATED CDRL REVISED AS REQUIRED WITHIN 30 DAYS OF ANY CHANGE BEING IDENTIFIED DURING CONTRACT PERIOD.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A008 REQUEST FOR DEVIATION / WAIVER N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-CM-002 SOW 3.2.10 – 3.2.12 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A ASREQ N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
(A) TOTAL 3 0 (B) TOTAL 0 0 0
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS. THE
CONTRACTOR MUST SUBMIT A REQUEST FOR DEVIATION OR WAIVER TO THE CO, COR, OR DESIGNEE PRIOR TO DEPARTING FROM THE
APPROVED BASELINE FOR A SPECIFIC NUMBER OF UNITS OR A SPECIFIED PERIOD OF TIME, IAW THE GUIDANCE CONTAINED IN THE
VERSION OF FAA-STD-021 SECTION 4.6 THAT IS IN EFFECT ON THE DATE OF THE RELEASE OF THIS SIR. DEVIATIONS AND WAIVERS
MUST BE FOR LESS THAN THE PRODUCTION QUANTITY OF THE ITEM, AND MAY NOT REQUIRE CHANGES TO ANY BASELINE
DOCUMENTATION.
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A009 SPECIFICATION CHANGE NOTICE N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-CM-003 SOW 3.2.10 – 3.2.12 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A ASREQ N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A010 ENGINEERING CHANGE PROPOSAL (ECP) N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-CM-004 SOW 3.2.10 – 3.2.12 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A ASREQ N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
4: THE ECP MAY BE PREPARED IN CONTRACTOR FORMAT. ECP CONTENT TO USE MIL-HDBK-61 AS A GUIDE, CONFIGURATION
MANAGEMENT GUIDANCE.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A011 CONTRACT CHANGE PROPOSAL N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-CM-005 SOW 3.2.10 – 3.2.12 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A ASREQ N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-X-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A012 INTEGRATED LOGISTICS SUPPORT PLAN (ILSP) N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ILS-001 SEE BLOCK 16 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ONE/R
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A 60 DAC SEE BLOCK 16
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
5: SOW 3.3
13: SUBMIT UPDATED CDRL REVISED AS REQUIRED WITHIN 30 DAYS OF ANY CHANGE BEING IDENTIFIED DURING CONTRACT
PERIOD.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A013 OBSOLETE PARTS REPORT N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ILS-002 SOW 3.2.7, 3.2.8 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D QRTLY
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 SEE BLOCK 16
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
4: THE OBSOLETE PARTS REPORT MAY BE PREPARED IN CONTRACTOR FORMAT IN ACCORDANCE WITH THE CONTRACTOR’S
PROCESSES AND PROCEDURES, OR AS SPECIFIED IN THIS CONTRACT.
12 & 13: SUBMIT CDRL QRTLY WITHIN 30 DAYS AFTER THE END OF EACH THIRD MONTH OF THIS CONTRACT.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A014 RECOMMENDED SITE SPARES LIST N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ILS-003 SOW 3.2.6 FAA / AJI-2220
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ONE/R
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A 60 DAC SEE BLOCK 16
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
15. TOTAL OF A & B 2 +
4: THE RECOMMENDED SITE SPARES LIST MAY BE PREPARED IN CONTRACTOR FORMAT IN ACCORDANCE WITH THE CONTRACTOR’S
13: SUBMIT REVISED CDRL AS REQUIRED WITHIN 30 DAYS OF ANY CHANGE BEING IDENTIFIED DURING CONTRACT PERIOD.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A015 SITE SURVEY PLAN N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ENG-001 SOW 3.8 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ONE/R
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A 30 DAC SEE BLOCK 16
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
15. TOTAL OF A & B 2 +
4: THE SITE INSTALLATION PLAN MAY BE PREPARED IN CONTRACTOR FORMAT IN ACCORDANCE WITH THE CONTRACTOR’S
13: SUBMIT UPDATED CDRL REVISED AS REQUIRED WITHIN 30 DAYS OF ANY CHANGE BEING IDENTIFIED DURING CONTRACT PERIOD.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A016 SITE NOTIFICATION LETTER N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ENG-002 SOW 3.8 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A N/A N/A ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
AJI-4130 (PB) 0 1 0
SEE BLOCK 16 0 1 0
(A) TOTAL 0 4 0 (B) TOTAL 0 0 0
15. TOTAL OF A & B 0 / 4 / 0
4: THIS CDRL MAY BE PREPARED IN CONTRACTOR FORMAT IN ACCORDANCE WITH THE CONTRACTOR’S PROCESSES AND
PROCEDURES, OR AS SPECIFIED IN THIS CONTRACT.
12: SITE NOTIFICATION LETTER MUST BE SUBMITTED NLT 45 DAYS IN ADVANCE OF THE TSS INSTALLATION AT A SITE.
14: A COPY OF THE SITE NOTIFICATION LETTER MUST BE SENT TO THE FAA FACILITY RECEIVING THE TSS.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A017 FACILITY DESIGN CRITERIA N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ENG-003 SOW 3.8 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
AJI-4130 (PB) 0 1 0
12: SUBMITTAL IS DUE WITH EACH ORDER FOR A TSS SITE INSTALLATION. POWER AND HVAC REQUIREMENTS MUST BE ADDRESSED.
14: COPY OF THIS CDRL MUST BE PROVIDED TO FAA SITE RECEIVING THE TSS INSTALLATION.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A018 SITE SURVEY IN-BRIEF N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ENG-004 SOW 3.8 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
AJI-4130 (PB) 0 1 0
12: SUBMIT FOR GOVERNMENT APPROVAL NLT 10 DAYS PRIOR TO EVENT.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 4 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR MUST
UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 4 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A019 SITE SURVEY REPORT N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ENG-005 SOW 3.8 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ONE FOR EACH SITE VISIT
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
AJI-4130 (PB) 0 1 0
12: FIRST SUBMISSION DUE 30 DAYS AFTER SITE SURVEY IS COMPLETE.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 45 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A020 AS BUILT DRAWINGS N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ENG-005 SOW 3.8 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ONE FOR EACH SITE INSTLN
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
AJI-4130 (PB) 0 1 0
12: FIRST SUBMISSION DUE 30 DAYS AFTER TSS SYSTEM INSTALLATION IS COMPLETED.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 45 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A021 TEST PLAN – FACTORY ACCEPTANCE TEST (FAT) N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-TEST-001 SOW 3.9, 3.10, 3.11, 3.16 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D EACH FAT
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
12: CDRL MUST BE SUBMITTED FOR GOVERNMENT APPROVAL AT LEAST 90 DAYS PRIOR TO START OF FAT.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A022 TEST PROCEDURES - FAT N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-TEST-002 SOW 3.9, 3.10, 3.11, 3.16 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
12: CDRL SUBMISSION IS DUE NLT 60 DAYS PRIOR TO START OF FAT.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A023 TEST REPORT – FAT N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-TEST-003 SOW 3.9, 3.10, 3.11, 3.16 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
12: CDRL SUBMISSION IS DUE NLT 10 DAYS AFTER COMPLETION OF FAT FOR EACH TSS.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A026 TEST PLAN – SITE INSTALLATION VERIFICATION (SIV)
TEST
N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-TEST-001 SEE BLOCK 16 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D EACH SIV TEST
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
5: SOW 3.2.8, 3.5.2.2, 3.5.2.3, 3.5.2.4, 3.5.2.8, 3.8, 3.12, 3.16
12: CDRL MUST BE SUBMITTED FOR GOVERNMENT APPROVAL AT LEAST 90 DAYS PRIOR TO START OF SIV TEST.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR MUST
UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A027 TEST PROCEDURES - SIV N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-TEST-002 SEE BLOCK 16 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D EACH SIV TEST
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
12: CDRL SUBMISSION IS DUE NLT 60 DAYS PRIOR TO START OF SIV TEST.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR MUST
UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A028 TEST REPORT - SIV N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-TEST-003 SEE BLOCK 16 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D EACH SIV TEST
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
12: CDRL SUBMISSION IS DUE NLT 10 DAYS AFTER COMPLETION OF SIV TEST FOR EACH TSS.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A029 TRAINING MATERIALS N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ILS-004 (SEE BLOCK 16 ALSO) SOW 3.2.3, 3.3, 3.4, 3.5.2.6, 3.6 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 SEE BLOCK 16
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
16: REMARKS
4: THE CONTRACTOR MUST PROVIDE COMMERCIALLY AVAILABLE TRAINING MATERIAL WHERE APPROPRIATE. WHEN TRAINING
MATERIAL NEEDS TO BE DEVELOPED, GUIDANCE FOR CONTENT CAN BE FOUND IN FAA-STD-028C, CONTRACTOR TRAINING
PROGRAMS, APPENDIX 1 DID 4.
12: TRAINING MATERIALS MUST BE DELIVERED WITH EACH TSS.
13: PROVIDE REVISED/UPDATED MATERIALS WITHIN 30 DAYS AFTER EACH SYSTEM BASELINE CHANGE.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 45 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR MUST
UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
(1 DATA ITEM)
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A032 VISUAL DATABASE DESIGN DOCUMENT (VDDD) N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ENG-006 SOW 3.5.2.4 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
12: SUBMIT VISUAL DATABASE DESIGN DOCUMENT (VDDD) FOR EACH TSS SITE NLT 15 DAYS AFTER SITE SURVEY IS COMPLETED.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 15 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
MUST UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 15 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A033 ENGINEERING SERVICES REQUEST N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ENG-007 SOW 3.14 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
12: SUBMIT ASREQ WHEN TASKING IS PROVIDED BY THE GOVERNMENT CONTRACTING OFFICER.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR
FORM APPROVED OMB NO.
0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X001 A TDP TM X OTHER
D. SYSTEM / ITEM E. CONTRACT / PR NO. F. CONTRACTOR
TOWER SIMULATION SYSTEM (TSS) 693KA8-XX-D-XXXXX TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE OF DATA ITEM
A034 ENGINEERING AND TECHNICAL SERVICES REPORT N/A
4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-FAA-TSS-ENG-008 SEE BLOCK 16 FAA / AJI-2110
7. DD 250 REQUIRED 8. APP CODE 9. DIST STATEMENT REQUIRED 10. FREQUENCY
N/A A D ASREQ
11. AS OF DATE 12. DATE OF FIRST SUBMISSION 13. DATE OF SUBSEQUENT SUBMISSION
N/A SEE BLOCK 16 N/A
D I S T R I B U T I O N
B. COPIES B. COPIES
A. ADDRESSEE FINAL A. ADDRESSEE FINAL
DRAFT REG REPRO DRAFT REG REPRO
AJI-2110 (MP) 0 1 0
5: SOW 3.5.1, 3.5.2.1, 3.5.2.8, 3.6, 3.7, 3.14
12: SUBMIT ASREQ WHEN TASKING IS PROVIDED BY THE GOVERNMENT CONTRACTING OFFICER.
NOTE: GOVERNMENT REVIEW COMMENTS WILL BE PROVIDED WITHIN 30 DAYS AFTER EACH CDRL SUBMISSION. CONTRACTOR MUST
UPDATE AS REQUIRED AND RESUBMIT THE CDRL WITHIN 30 DAYS OF RECEIPT OF GOVERNMENT COMMENTS.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE: