MSBRS SIR Section B - Amendment 0002.docx

DOCX document 110 KB Posted

Attached to
Mode S Beacon Replacement System (MSBRS)Procurement Federal contract opportunity
Solicitation number
693KA7-18-R-00009
Issued by
Department of Transportation Federal Aviation Administration Headquarters

About this file

This document outlines a federal contract for the procurement of a Mode S Beacon Replacement System (MSBRS). The contract will be awarded by the Department of Transportation Federal Aviation Administration Headquarters to provide infrastructure improvements needed to support near-term Air Traffic Control objectives. Key requirements of the contract include design, development, production, testing, implementation and management of the MSBRS over a 12-year period. The contract uses firm-fixed price, time and materials, and cost-reimbursable contract line items for program management, engineering support, site implementation, training, and other services. Estimated maximum value of the contract is to be determined. The first article and production systems must include MSBRS equipment, maintenance and air traffic control terminals, and transponders to be delivered to test and implementation sites.

MSBRS SIR Section B - Amendment 0002 (docx)

View the file

Other files for this federal contract opportunity

Other files attached to Mode S Beacon Replacement System (MSBRS)Procurement, newest first.
File Type Posted
Attachment J-34 - MSBRS OCD Plan Amendment 0003.docx DOCX document
MSBRS SIR Amendment 0003.pdf PDF
MSBRS SIR J Attachments - Amendment 0002.zip ZIP file
Section J Attachments - Part 2 Amendment 0001.zip ZIP file
MSBRS SIR Section A - Amendment 0002.pdf PDF
MSBRS SIR Section G.docx DOCX document
MSBRS SIR - Amendment 0002.pdf PDF
MSBRS SIR - Amendment 0001.pdf PDF
MSBRS SIR Comment-Question Matrix - FAA Response to Vendor Questions.xlsx XLSX spreadsheet
MSBRS SIR Section L - Amendment 0003.docx DOCX document
MSBRS SIR Section E.docx DOCX document
MSBRS SIR Section I - Amendment 0002.docx DOCX document
Section J Attachments - Part 2 Amendment 0001.zip ZIP file
MSBRS SIR - Amendment 0002.pdf PDF
Section J Attachment J-4 DIDs.zip ZIP file
Section J Attachments - Part 1.zip ZIP file
MSBRS SIR Comment-Question Matrix.xlsx XLSX spreadsheet
MSBRS SIR Section C - Amendment 0002.docx DOCX document
MSBRS SIR Section A - Amendment 0002.pdf PDF
MSBRS SIR Section E.docx DOCX document
MSBRS SIR Section A - Amendment 0002.pdf PDF
MSBRS SIR Section H - Amendment 0001.docx DOCX document
MSBRS SIR Section F - Amendment 0002.docx DOCX document
MSBRS SIR Section M - Amendment 0001.docx DOCX document
MSBRS SIR - Amendment 0001.pdf PDF
MSBRS SIR Comment-Question Matrix.xlsx XLSX spreadsheet
Section J Attachments - Part 2 Amendment 0001.zip ZIP file
MSBRS SIR Section C - Amendment 0002.docx DOCX document
MSBRS SIR Section D.docx DOCX document
MSBRS SIR - Amendment 0002.pdf PDF
MSBRS SIR Section K.docx DOCX document
MSBRS SIR Section B - Amendment 0001.docx DOCX document
Section J Attachments - Part 1.zip ZIP file
MSBRS SIR Section M - Amendment 0001.docx DOCX document
MSBRS SIR Section A - Amendment 0001.pdf PDF
Section J Attachments - Part 3.zip ZIP file
MSBRS SIR Section I.docx DOCX document
MSBRS Instructions to Obtain Sensitive Unclassified Information.docx DOCX document
MSBRS SIR Comment-Question Matrix.xlsx XLSX spreadsheet
MSBRS SIR Section E.docx DOCX document
MSBRS SIR Section B.docx DOCX document
MSBRS SIR Section A.pdf PDF
MSBRS SIR Section H.docx DOCX document
MSBRS SIR Section C.docx DOCX document
Section J Attachments - Part 3.zip ZIP file
MSBRS SIR Section F.docx DOCX document
MSBRS SIR Section M.docx DOCX document
Section J Attachment J-4 DIDs.zip ZIP file
MSBRS SIR Section D.docx DOCX document
MSBRS SIR Section G.docx DOCX document
Show all 50

Mode S Beacon Replacement System (MSBRS)Procurement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

TABLE OF CONTENTSi
B.1Introduction2
B.2Type and Term of Contract2
B.3Maximum Contract Price2
B.4CLIN NUMBERING STRUCTURE2
B.5CLIN PRICING TABLES2
BASE PERIOD3
OPTION PERIOD 17
OPTION PERIOD 29
OPTION PERIOD 311
OPTION PERIOD 413
B.6CLIN Descriptions14

Contract Number: XXXX Section B: SUPPLIES OR SERVICES & PRICE/COST

B-1

Introduction The Contractor must provide all necessary labor, materials, equipment, services, and facilities for the SIR Section C, Statement of Work (SOW), which stipulates the requirement to provide for the design, development, production, test, implementation and management of the MSBRS.

Type and Term of Contract The contract uses Firm Fixed Price (FFP), Time and Materials (T&M), Cost Plus Fixed Fee (CPFF), and Cost-Reimbursable Contract Line Item Numbers (CLINs).

The period of performance for this contract is 144 MONTHS from the date of contract award if all option periods are exercised. The base period will be 48 MONTHS from the date of contract award. There will be four (4) 24-month option periods as illustrated below:

Period of Performance

Base Period (Years1-4)
Contract Award + NTE 48 MONTHS
Option Period 1 (Years 5-6)
Base Period + 24 MONTHS

Option Period 2 (Years 7-8) Option Period 1 + 24 MONTHS

Option Period 3 (Years 9-10) Option Period 2 + 24 MONTHS

Option Period 4 (Years 11-12) Option Period 3 + 24 MONTHS

The Government may, at any time during the term of this contract, exercise any or all options in accordance with the contract. All unexercised CLINs are optional.

Maximum Contract Price The estimated maximum ceiling price for the entire performance period of this contract is TBD.

CLIN NUMBERING STRUCTURE

The table below demonstrates the CLIN structure. The first digit in each CLIN series indicates the Option Period in which the CLIN may be ordered. The Base Period is denoted by 0XXX. Option Period 1 is denoted by 1XXX. Option Period 2 is denoted by 2XXX. Option Period 3 is denoted by 3XXX. Option Period 4 is denoted by 4XXX.

CLIN PRICING TABLES

This section lists all CLINs for the supplies and services, which can be ordered under this contract for the contract period of performance including the base and all option periods. References are included with each CLIN to the requirement described in the SOW. Summary descriptions are also provided in Section B.

B-6

BASE PERIOD

CLIN
Supplies/Services
Quantity
Units
Unit Price
Extended Price/Cost
CLIN Type
SOW Para. Section
0001
Program Management
48
MONTHS
$______
$________
FFP
3.1-3.3;

3.4-3.4.7; 3.4.8; 3.4.9; 3.7.3;

3.7.7.2-3.7.7.3;

3.9;

3.10.1;

3.11.1.3;

3.12, 3.12.1-3.12.1.1; 3.12.4.3;

3.14.2 - 3.14.3

0002
System Engineering & Design
Per Milestone Schedule (Section F)
$_____
$________
FFP
3.4.7.1; 3.4.7.2;

3.5 - 3.6;

3.7-3.7.2;

3.7.4-3.7.6 3.7.7.1.1; 3.8

0003
First Article Systems
0003A
First Article Systems –

Contractor Facility for In-Plant DT

1
EA
$_____
$________
FFP
3.13.1.1
0003B
First Article Systems –

Beacon-only/ Adjacent Sensor On-Site

DT

1
EA
$______
$________
FFP
3.13.1.2; 3.14.1; 3.14.4; 3.14.6; 3.14.9-3.14.10
0003C
First Article Systems –

ASR-9 On-Site DT

1
EA
$______
$________
FFP
3.13.1.2; 3.14.1; 3.14.4; 3.14.6; 3.14.9-3.14.10
0003D
First Article Systems –

CARSR On-Site DT

1
EA
$______
$________
FFP
3.13.1.2; 3.14.1; 3.14.4; 3.14.6; 3.14.9-3.14.10
0003E
First Article Systems –

Contractor Facility for Training

1
EA
$______
$________
FFP
3.13.1.3
0004
First Article Systems –

Key Site Systems

0004A
First Article Systems –

Key Site System ASR-9/Mode S – Phoenix, AZ

1
EA
$______
$________
FFP
3.11.2.2 – 3.11.2.4; 3.13.1.4; 3.14.1; 3.14.4-3.14.10
0004B
First Article Systems –

Key Site System CARSR/Mode S – Parker, CO

1
EA
$______
$________
FFP
3.11.2.2-3.11.2.4; 3.13.1.4; 3.14.1; 3.14.4-3.14.10
0004C
First Article Systems –

Key Site System Beacon Only - Rockville, NE

1
EA
$______
$________
FFP
3.11.2.2-3.11.2.4; 3.13.1.4; 3.14.1; 3.14.4-3.14.10
0005
Support System Technical Data
0005A
Support System Technical Data – Depot
1
LOT
$______
$________
FFP
3.12.6.2.14;

3.12.8.4

0005B
Support System Technical Data – Program Support Facility (PSF)
1
LOT
$______
$________
FFP
3.10.2-3.10.2.4
0006
Production

Systems

Min 1/ Max 25
EA
$______
$________
FFP
3.11.1.2.1- 3.11.1.2.3; 3.11.1.5; 3.11.2.2; 3.11.2.4; 3.12.3.1; 3.13.2
0007
Site Implementation/ Activation Services
$______
NTE $14,358,000
T&M
3.10.2.1;-3.10.2.2

3.11.1.2.1 -3.11.1.2.3; 3.11.1.5;

3.11.2.3-3.11.2.4; 3.14.1;

3.14.4 – 3.14.10;

0008
Test &

Evaluation

1
LOT
$______
Total Est. Cost:

Total Fee:

Total Est. Cost Plus Fixed Fee:

CPFF
3.11.1-3.11.1.2.3; 3.11.1.5-3.11.2.1.3; 3.11.2.4; 3.7.7.1.1
0009
Engineering

Services

1
LOT
$______
NTE $706,000
T&M
3.7.7.1.2; 3.11.1.4; 3.15
0010
Interim Contractor Depot Level Support

(ICDLS)

12
MONTHS
$______
NTE $170,000
T&MFFP
3.12.7; 3.12.8;

3.12.8.2

0011
Integrated Logistics Support Data
1
LOT
$______
$________
FFP
3.12.1.2 – 3.12.2; 3.12.3.1; 3.12.3.2 – 3.12.4.3; 3.12.5 – 3.12.6.2.13; 3.12.8.3
0012
Training Development
0012A
Training Development for FAA Field Maintenance

Personnel

1
LOT
$______
$________
FFP
3.16.1 – 3.16.3.2.3
0012B
Training Development for FAA Second Level Personnel
1
LOT
$______
$________
FFP
3.10.2.5.1 – 3.10.2.5.2
0012C
Training Development for FAA Depot Level Personnel
1
LOT
$______
$________
FFP
3.12.9.1
0012D
Training Development for FAA Air Traffic Control (ATC) Personnel
1
LOT
$______
$________
FFP
3.16.1 – 3.16.2.3;

3.16.2.5 – 3.16.2.7

3.16.3 – 3.16.3.2.3 3.16.5.1

0012E
Familiarization Training Development for FAA Test Team Personnel
1
LOT
$______
$________
FFP
3.11.3.1
0013
Course Conduct
0013A
Course Conduct for FAA Field Maintenance Personnel
Min 2/ Max 20
EA
$______
$________
FFP
3.16.4 – 3.16.4.2
0013D
Course Conduct for FAA Air Traffic Control (ATC) Personnel
Min 1/ Max 20
EA
$______
$________
FFP
3.16.5.2
0013E
Familiarization Course Conduct for FAA Test Team Personnel
Min 1/ Max 2
EA
$______
$________
FFP
3.11.3.2
0014
Spares
0014A
FAA Depot

Spares

1
LOT
$______
$________
FFP
3.12.4.4; 3.12.8.1
0014B
Additional LRUs for

Site Level Spares (Option)

Min 1/ Max 25
LOT
$______
$________
FFP
3.12.3.1.1
0015
Information System

Security Services (Option)

1
LOT

Total Est. Cost:

Total Fee:

Total Est. Cost Plus Fixed Fee:

CPFF
3.7.5.1
0016
ODCs/Travel
0016A
Travel –

First Article & Key Site Systems

NTE $572,000

CR

0016B
Travel –

Production Systems

NTE $2,329,000

CR

0016C
Travel –

Program Management (TIMs, Training, PMRs)

NTE $251,000
CR
0016D
Travel –

Testing

NTE $806,000
CR
0016F
Material –

ICDLS

NTE

TBD

CR
3.12.7.3; 3.12.7.4
0019
Additional MSBRS Terminals (Option)
0019A
Additional Maintenance Terminals (Option)
Min 1/ Max 20
EA
$______
$________
FFP
3.13.3
0019B
Additional Air Traffic Terminals (Option)
Min 1/ Max 20
EA
$______
$________
FFP
3.13.3

OPTION PERIOD 1

CLIN
Supplies/Services
Quantity
Units
Unit Price
Extended Price/Cost
CLIN Type
SOW Para. Section
1001
Program Management
24
MONTHS
$_______
$________
FFP
3.1; 3.2

3.3;

3.4-3.4.7; 3.4.8; 3.4.9; 3.7.3;

3.7.7.2-3.7.7.3;

3.9;

3.10.1;

3.11.1.3;

3.12, 3.12.1, 3.12.4.2, 3.12.4.3;3.12.5.2

3.14.2 – 3.14.3

Production Systems
Min 1/ Max 42
EA
$_______
$________
FFP
3.11.1.2.1 - 3.11.1.2.3; 3.11.1.5; 3.11.2.2; 3.11.2.4; 3.12.3.1; 3.13.2
1007
Site Implementation/ Activation Services
$_______
NTE $18,339,000
T&M
3.10.2.1-3.10.2.2;

3.11.1.2.1 - 3.11.1.2.3; 3.11.1.5;

3.11.2.3 – 3.11.2.4; 3.14.1;

3.14.4 – 3.14.10

1009
Engineering Services
1
LOT
$_______
NTE $944,000
T&M
3.7.7.1.2; 3.11.1.4; 3.15
1010
Interim Contractor Depot Level Support

(ICDLS)

12
MONTHS
$_______
NTE $892,000
T&MFFP
3.12.7; 3.12.8;

3.12.8.2

1013A
Course Conduct for FAA Field Maintenance Personnel
Min 2/ Max 20
EA
$_______
$________
FFP
3.16.4 – 3.16.4.2
1013B
Course Conduct for FAA Second Level Engineering

Personnel

Min 1/ Max 5
EA
$_______
$________
FFP
3.10.2.5.3 -3.10.2.5.4
1013C
Course Conduct for FAA Depot Level Personnel
Min 1/ Max 2
EA
$________
$________
FFP
3.12.9.2
1014
Spares
1014A
FAA Depot

Spares

1
LOT
$_______
$________
FFP
3.12.4.4;

3.12.8.1

1014B
Additional LRUs for

Site Level Spares (Option)

Min 1/ Max 42
LOT
$_______
$________
FFP
3.12.3.1.1
1015
Information System

Security Services (Option)

1
LOT

Total Est. Cost:

Total Fee:

Total Est. Cost Plus Fixed Fee:

CPFF
3.7.5.1
1016
ODCs/Travel
1016B
Travel -
NTE $2,766,000
CR
1016C
Travel -

Program

NTE $96,000
CR
1016E
Travel/Material - Equipment Removal & Disposition (Option)

NTE $460,000

CR

1016F
Material –
NTE TBD
CR
3.12.7.3; 3.12.7.4
1017
First Article Unit Refurbishment (Option)
Min 1/

Max 3

EA
$_______
$________
FFP
3.11.2.2; 3.11.2.4; 3.13.1.5;
1018
Equipment Removal & Disposition (Option)
$________
NTE $2,799,000
T&M
3.14.11
1019
Additional MSBRS Terminals (Option)
1019A
Additional Maintenance Terminals (Option)
Min 1/ Max 40
EA
$_______
$________
FFP
3.13.3
1019B
Additional Air Traffic Terminals (Option)
Min 1/ Max 40
EA
$________
$________
FFP
3.13.3
1020
MSBRS

Antenna (Option)

Min 1/Max 3
EA
$________
$________
FFP
3.9.1
1020A
MSBRS First Article

Antenna (Option)

1
EA
$________
$________
FFP
3.9.1
1020B
MSBRS Production

Antenna (Option)

Min 1/Max 3
EA
$________
$________
FFP
3.9.1

OPTION PERIOD 2

CLIN
Supplies/Services
Quantity
Units
Unit Price
Extended Price/Cost
CLIN Type
SOW Para. Section
2001
Program Management
24
MONTHS
$_______
$________
FFP
3.1; 3.2

3.3;

3.4-3.4.7; 3.4.8; 3.4.9; 3.7.3 3.7.7.2-3.7.7.3;

3.9;

3.10.1;

3.11.1.3;

3.12, 3.12.1, 3.12.4.2; 3.12.4.3; 3.12.5.2;

3.14.2 - 3.14.3

2006
Production

Systems

Min 1/ Max 50
EA
$_______
$________
FFP
3.11.1.2.1 - 3.11.1.2.3; 3.11.1.5; 3.11.2.2; 3.11.2.4; 3.12.3.1; 3.13.2
2007
Site Implementation/ Activation Services
$_______
NTE $19,467,000
T&M
3.10.2.1-3.10.2.2;

3.11.1.2.1 - 3.11.1.2.3; 3.11.1.5;

3.11.2.3 - 3.11.2.4; 3.14.1;

3.14.4 - 3.14.10;

2009
Engineering

Services

1
LOT
$_______
NTE $953,000
T&M
3.7.7.1.2; 3.11.1.4; 3.15
2010
Interim Contractor Depot Level Support

(ICDLS)

12
MONTHS
$_______
NTE $742,000
T&MFFP
3.12.7; 3.12.8;

3.12.8.2

2014
Spares
2014A
FAA Depot

Spares

1
LOT
$_______
$________
FFP
3.12.4.4;

3.12.8.1

2014B
Additional LRUs for

Site Level Spares (Option)

Min 1/ Max 50
LOT
$_______
$________
FFP
3.12.3.1.1
2015
Information System

Security Services (Option)

1
LOT

Total Est. Cost:

Total Fee:

Total Est. Cost Plus Fixed Fee:

CPFF
3.7.5.1
2016
ODCs/Travel
2016B
Travel -

NTE $2,862,000

CR

2016C
Travel -

Program

NTE $53,000

CR

2016E
Travel/Material - Equipment Removal & Disposition (Option)

NTE $823,000

CR

2016F
Material –
NTE TBD
CR
3.12.7.3; 3.12.7.4
2017
First Article Unit Refurbishment (Option)
Min 1/

Max 3

EA
$_______
$________
FFP
3.11.2.2; 3.11.2.4; 3.13.1.5
2018
Equipment Removal & Disposition (Option)
$_______
NTE $6,131,000
T&M
3.14.11
2019
Additional MSBRS Terminals (Option)
2019A
Additional Maintenance Terminals (Option)
Min 1/ Max 25
EA
$_______
$________
FFP
3.13.3
2019B
Additional Air Traffic Terminals (Option)
Min 1/ Max 25
EA
$_______
$________
FFP
3.13.3
2020
MSBRS

Antenna (Option) Min 1/ Max 37

$_______
$________
FFP
3.9.1
2020A
MSBRS First Article

Antenna (Option)

1
EA
$________
$________
FFP
3.9.1
2020B
MSBRS Production

Antenna (Option)

Min 1/Max 37
EA
$________
$________
FFP
3.9.1

OPTION PERIOD 3

CLIN
Supplies/Services
Quantity
Units
Unit Price
Extended Price/Cost
CLIN Type
SOW Para. Section
3001
Program Management
24
MONTHS
$_______
$________
FFP
3.1; 3.2

3.3;

3.4-3.4.7; 3.4.8; 3.4.9; 3.7.3;

3.7.7.2-3.7.7.3;

3.9;

3.10.1;

3.11.1.3;

3.12, 3.12.1, 3.12.4.2; 3.12.4.3; 3.12.5.2;

3.14.2 - 3.14.3

3006
Production

Systems

Min 1/ Max 25
EA
$______
$________
FFP
3.11.1.2.1- 3.11.1.2.3; 3.11.1.5; 3.11.2.2; 3.11.2.4; 3.12.3.1; 3.13.2
3007
Site Implementation/ Activation Services
$_______
NTE $19,901,000
T&M
3.10.2.1-3.10.2.2;

3.11.1.2.1 -3.11.1.2.3; 3.11.1.5;

3.11.2.3 – 3.11.2.4; 3.14.1;

3.14.4 – 3.14.10;

3009
Engineering

Services

1
LOT
$_______
NTE $1,011,000
T&M
3.7.7.1.2; 3.11.1.4; 3.15
3014B
Additional LRUs for

Site Level Spares (Option)

Min 1/ Max 25
LOT
$_______
$________
FFP
3.12.3.1.1
3015
Information System

Security Services (Option)

1
LOT

Total Est. Cost:

Total Fee:

Total Est. Cost Plus Fixed Fee:

CPFF
3.7.5.1
3016
ODCs/Travel
3016B
Travel – Production Systems
NTE $2,947,000
CR
3016C
Travel -

Program

NTE $55,000
CR
3016E
Travel/Material - Equipment Removal & Disposition (Option)

NTE $698,000

CR

3017
First Article Unit Refurbishment (Option)
Min 1/

Max 3

EA
$_______
$________
FFP
3.11.2.2; 3.11.2.4; 3.13.1.5;
3018
Equipment Removal & Disposition (Option)
$_______
NTE $5,871,000
T&M
3.14.11
3019
Additional MSBRS Terminals (Option)
3019A
Additional Maintenance Terminals (Option)
Min 1/ Max 25
EA
$______
$________
FFP
3.13.3
3019B
Additional Air Traffic Terminals (Option)
Min 1/ Max 25
EA
$_______
$________
FFP
3.13.3
3020
MSBRS

Antenna (Option) Min 1/ Max 40

EA
$_______
$________
FFP
3.9.1
3020A
MSBRS First Article

Antenna (Option)

1
EA
$________
$________
FFP
3.9.1
3020B
MSBRS Production

Antenna (Option)

Min 1/Max 40
EA
$________
$________
FFP
3.9.1

OPTION PERIOD 4

CLIN
Supplies/Services
Quantity
Units
Unit Price
Extended Price/Cost
CLIN Type
SOW Para. Section
4001
Program Management
24
MONTHS
$_______
$________
FFP
3.1; 3.2

3.3;

3.4-3.4.7; 3.4.8; 3.4.9; 3.7.3;

3.7.7.2-3.7.7.3;

3.9;

3.10.1;

3.11.1.3;

3.12; 3.12.1, 3.12.4.2; 3.12.4.3; 3.12.5.2;

3.14.2 - 3.14.3

4007
Site Implementation/ Activation Services
$_______
NTE $21,102,000
T&M
3.10.2.1-3.10.2.2;

3.11.1.2.1 - 3.11.1.2.3; 3.11.1.5;

3.11.2.3 – 3.11.2.4; 3.14.1;

3.14.4 – 3.14.10;

4009
Engineering

Services

1
LOT
$_______
NTE $1,072,000
T&M
3.7.7.1.2; 3.11.1.4; 3.15
4015
Information System

Security Services (Option)

1
LOT

Total Est. Cost:

Total Fee:

Total Est. Cost Plus Fixed Fee:

CPFF
3.7.5.1
4016
ODCs/Travel
4016B
Travel -

Production Systems

NTE $3,039,000

CR

4016C
Travel -

Program

(TIMs, Training PMRs)

NTE $57,000

CR

4016E
Travel/Material - Equipment Removal & Disposition (Option)

NTE $374,000

CR

4017
First Article Unit Refurbishment (Option)
Min 1/

Max 3

EA
$_______
$________
FFP
3.11.2.2; 3.11.2.4; 3.13.1.5
4018
Equipment Removal & Disposition (Option)
$_______
NTE $3,238,000
T&M
3.14.11
4020
MSBRS

Antenna (Option) Min 1/ Max 20

EA
$_______
$________
FFP
3.9.1
4020A
MSBRS First Article

Antenna (Option)

1
EA
$________
$________
FFP
3.9.1
4020B
MSBRS Production

Antenna (Option)

Min 1/Max 20
EA
$________
$________
FFP
3.9.1

CLIN Descriptions CLIN Descriptions are as follows, see the specific references provided in the tables above for the location in the SOW of the complete descriptions of all requirements:

X001 Program Management: Products and services required for Contractor management, control and reporting for the planning and implementation of all program management functions for the entire program. This includes program management; configuration management, quality management, meetings, reviews, conferences and evaluations; subcontract management; cost, schedule, performance and risk management and reporting; commercial products management; data management; and Risk, Issue, Opportunity (RIO) management, phase-out & close-out activities.

X002 System Engineering & Design: Systems engineering design, System development, Software design, Software development, Hardware design, Hardware development, Contractor support for Functional Configuration Audit (FCA), and Physical Configuration Audit (PCA).

X003A-X003E First Article Systems: All labor, materials, and services required to deliver and install at designated sites a total of Five (5) First Article systems; Four (4) systems for DT and One (1) system for First Article training.

X003A First Article Systems - Contractor Facility for In-Plant DT: Delivery at Contractor Facility for In-Plant DT. The First Article In-Plant DT system must include the following components:

· MSBRS system (as defined by the Contractor’s proposed solution)

· Two (2) Maintenance Terminals

· Two (2) Air Traffic Terminals

· Two (2) Position Adjustable Range Reference Orientation Transponders (PARROT).

X003B First Article Systems - Beacon-only/Adjacent Sensor On-Site DT: Delivery and Implementation Activities for the Beacon-only/ Adjacent Sensor on-site DT at First Article site at the Tech Center. The First Article Beacon-only On-Site system must include the following components:

· MSBRS system (as defined by the Contractor’s proposed solution)

· Two (2) Maintenance Terminals

· Two (2) Air Traffic Terminals

· Two (2) Position Adjustable Range Reference Orientation Transponders (PARROT).

X003C First Article Systems - ASR-9 On-Site DT: Delivery and Implementation Activities for the ASR-9 on-site DT at First Article site at the Tech Center. The First Article ASR-9 On-Site system must include the following components:

· MSBRS system (as defined by the Contractor’s proposed solution)

· Two (2) Maintenance Terminals

· Two (2) Air Traffic Terminals

· Two (2) Position Adjustable Range Reference Orientation Transponders (PARROT).

X003D First Article Systems - Common Air Route Surveillance Radar (CARSR) On-Site DT: Delivery and Implementation Activities for the CARSR on-site DT at First Article site at the Mike Monroney Aeronautical Center. The First Article CARSR On-Site system must include the following components:

· MSBRS system (as defined by the Contractor’s proposed solution)

· Two (2) Maintenance Terminals

· Two (2) Air Traffic Terminals

· Two (2) Position Adjustable Range Reference Orientation Transponders (PARROT).

X003E First Article Systems - Contractor Facility for Training: Delivery at Contractor Facility for First Article training. The First Article Contractor facility for Training system must include the following components:

· MSBRS system (as defined by the Contractor’s proposed solution)

· One (1) Maintenance Terminal

· One (1) Air Traffic Terminal

· One (1) Position Adjustable Range Reference Orientation Transponder (PARROT).

Note: the actual development and conduct of training are included in CLINs X012 and X013 respectively.

X004A-X004C All labor, materials, and services required to deliver and install at designated sites up to a total of Three (3) systems for designated Key Sites.

X004A First Article Systems - Key Site Systems: Delivery and Implementation Activities for the following key site:

· ASR-9/Mode S – Phoenix, AZ.

The First Article Key Sites system must include the following components:

· MSBRS system (as defined by the Contractor’s proposed solution)

· Two (2) Maintenance Terminals

· Two (2) Air Traffic Terminals

· Two (2) Position Adjustable Range Reference Orientation Transponders (PARROT).

X004B First Article Systems - Key Site Systems: Delivery and Implementation Activities for the following key site:

· CARSR/Mode S – Parker, CO.

The First Article Key Sites system must include the following components:

· MSBRS system (as defined by the Contractor’s proposed solution)

· Two (2) Maintenance Terminals

· Two (2) Air Traffic Terminals

· Two (2) Position Adjustable Range Reference Orientation Transponders (PARROT).

X004C First Article Systems - Key Site Systems: Delivery and Implementation Activities for the following key site:

· Beacon-Only – Rockville, NE.

The First Article Key Sites system must include the following components:

· MSBRS system (as defined by the Contractor’s proposed solution)

· Two (2) Maintenance Terminals

· Two (2) Air Traffic Terminals

· Two (2) Position Adjustable Range Reference Orientation Transponders (PARROTs).

X005A Support System Technical Data - Depot: All labor, materials, services, hardware, software, tools, documentation, test equipment to stand up the FAA Depot capability, including the provision of depot test procedures, tools and test equipment. This does not include MSBRS equipment. The system will be purchased under CLIN X006.

X005B Support System Technical Data - Program Support Facility (PSF): All labor, materials, services, hardware, software, tools, documentation, test equipment to stand up the FAA Program Support Facility (PSF), including the provision of manuals, tools, and test equipment. This does not include MSBRS equipment. The system will be purchased under CLIN X006.

X006 Production Systems: Production MSBRS systems, including any production testing at the factory, with any one of the specified configurations as required by site, including support & test equipment, site level spares, technical manuals and consumables and shipping to designated site.

The Production Systems must include the following components:

· MSBRS system (as defined by the Contractor’s proposed solution)

· One (1) Maintenance Terminal

· One (1) Air Traffic Terminal

· Two (2) Position Adjustable Range Reference Orientation Transponders (PARROT).

X007 Site Implementation/ Activation Services: All labor, materials, and services required for: conduct of Implementation and Activation services, including, but not limited to: Site Preparation; Site Surveys and development of the Site Engineering Report (SER); developing planning CDRLs associated with Implementation; Site Preparation activities; Installation, Checkout, and Optimization activities; conducting Site Acceptance Tests (SAT); conducting Contract Acceptance Inspections (CAI); and delivering Acceptance Data Packages (ADP).

X008 Test & Evaluation: All labor, materials, and services associated with development of test CDRLs and execution of test related activities identified in the Test and Evaluation section of the SOW. FAA Test Team Familiarization training is covered under CLIN 013E.

X009 Engineering Services: All labor, materials, and services required to support Government-defined engineering requirements incidental to any other CLIN. This includes First Article OT support.

X010 Interim Contractor Depot Level Support (ICDLS): All labor and services required to support ICDLS for all implemented systems, until transition of support to FAA personnel.

X011 Integrated Logistics Support Data: All labor, materials, and services required to develop data and documentation for system support.

X012A – 00012E Training Development: All labor, materials, and services required to support training development for FAA Field Maintenance, FAA Second Level Engineering Support, FAA Depot Level Support, FAA Air Traffic Control, and FAA Test Team Personnel.

X012A Training Development for FAA Field Maintenance Personnel: All labor, materials, and services required to support training development for Maintenance personnel.

X012B Training Development for FAA Second Level Personnel: All labor, materials, and services required to support training development for FAA Second Level Engineering personnel.

X012C Training Development for FAA Depot Level Personnel: All labor, materials, and services required to support training development for Depot Level personnel.

X012D Training Development for FAA Air Traffic Control (ATC) Personnel: All labor, materials, and services required to support training development for Air Traffic personnel.

X012E Familiarization Training Development for FAA Test Team Personnel: All labor, materials, and services required to support training development for FAA Test Team personnel.

X013A-X013E Course Conduct: All labor, materials, and services required for course conduct for FAA Field Maintenance, FAA Second Level Engineering Support, FAA Air Traffic Control, FAA Test Team Personnel and FAA Depot Level Support, The Contractor must provide Training Facilities in accordance with Section C.

X013A Course Conduct for FAA Field Maintenance Personnel: All labor, materials, and services required for course conduct. The Contractor must provide Training Facilities in accordance with Section C.

X013B Course Conduct for FAA Second Level Engineering Personnel: All labor, materials, and services required for course conduct. The Contractor must provide Training Facilities in accordance with Section C.

X013C Course Conduct for FAA Depot Level Personnel: All labor, materials, and services required for course conduct. The Contractor must provide Training Facilities in accordance with Section C.

X013D Course Conduct for FAA Air Traffic Control (ATC) Personnel: All labor, materials, and services required for course conduct. The Contractor must provide Training Facilities in accordance with Section C.

X013E Familiarization Course Conduct for FAA Test Team Personnel: All labor, materials, and services required for course conduct. The Contractor must provide Training Facilities in accordance with Section C.

X014A FAA Depot Spares:

All labor, materials, and services required for procurement and delivery of FAA depot level spares necessary for depot operations in support of implemented MSBRS systems, to include LRUs, sub-LRUs, piece parts, and consumables. Offerors are instructed to develop and submit an itemized list of anticipated spare parts required for depot support and a FFP for each item listed therein in accordance with Section C. The specific parts to be ordered and quantity of each will be determined after the Provisioning Conference and during development of the Depot Support Transition Plan.

X014B Additional LRUs for Site Level Spares:

Upon exercise of this Option, effort must include all labor, materials and services required for additional LRUs for site level spares. The Government reserves the right to order individual LRUs which form a part of the MSBRS. Offerors are instructed to develop and submit an itemized list of MSBRS LRUs and a FFP price for each item listed therein in accordance with Section C. Additional LRUs may be ordered for each production system to supplement resources available for site level maintenance. Specific LRUs to be ordered and quantity of each is TBD.

X015 Information System Security Services: Upon exercise of this Option, all labor, materials, and services required for on-going/annual systems security assessments including vulnerability assessments, risk and requirements analysis, documentation updates, and resolution to system vulnerabilities or additional security requirements.

X0016A-X016EF Other Direct Costs (ODCs): All ODCs required in support of travel for First Article Systems, Key Site Systems, Production Systems, Program Management, and Testing; and Travel and Material for Equipment Removal & Disposition; and Material for ICDLS. The Government must reimburse the Contractor for travel and per diem costs incurred only in the performance of this contract. Reimbursement will be at cost only and in accordance with Government Travel Regulations (GTRs).

X016A Travel -First Article & Key Site Systems: Travel costs in support of delivery and installation at the site.

X016B Travel -Production Systems: Travel costs in support of delivery and installation at the site.

X016C Travel – Program Management (CLIN X001 TIMs, PMRs, etc.): Travel required in support of TIMs, PMRs, and training during the contract period of performance.

X016D Travel – Testing: Travel required in support of Test & Evaluation activities under CLIN 0008.

X016E Travel/Material - Equipment Removal & Disposition: Upon exercise of this Option, effort must include all ODCs, material, and services required to disassemble, remove, package, ship and/or dispose of legacy equipment replaced by MSBRS in support of CLIN X018 Equipment Removal & Disposition.

X016F Material – ICDLS: All ODCs, material, and services required for repairs in support of CLIN X010 Interim Contractor Depot Level Support (ICDLS).

X017 First Article Unit Refurbishment: Upon exercise of this Option, effort must include all labor, materials, and services required to: remove systems from previously installed location; refurbish as necessary to maintain contracted warranty and delivery; conduct and document the results of the PAT.

X018 Equipment Removal & Disposition: Upon exercise of this Option, effort must include all labor , materials, and services required to disassemble, remove, package, ship and/or dispose of legacy equipment replaced by MSBRS.

X019A Additional Maintenance Terminal: The Option for the purchasing of Additional Maintenance Terminals and installation them at sites. This CLIN may be exercised multiple times during the contract, up to the maximum order quantity specified.

X019B Additional Air Traffic Terminal: The Option for the purchasing of Additional Air Traffic Terminals and installation them at sites. This CLIN may be exercised multiple times during the contract, up to the maximum order quantity specified.

X020A MSBRS First Article Antenna: The Government, upon exercise of this Option, will order one MSBRS First Article antenna to be delivered under this contract to include all labor, materials and services required to qualify the Form Fit Function replacement secondary antenna.

X020BA MSBRS Production Antenna: The Government, upon exercise of this Option, will define the quantity of MSBRS Production antennas to be delivered under this contract. All labor, materials and services required to qualify the Form Fit Function replacement secondary antenna.

File details come from the government source that posted it. Updated .