Pre-Proposal Webinar and Virtual Site Visit
RFP No. 693JJ320R000016
“Roadside Safety Research and Federal Outdoor Impact Laboratory (FOIL) Technical Support Services”
August 6, 2020 at 1:00 pm Presented by FHWA
Welcome Introductions
◦ Sarah Tarpgaard, FHWA Contracting Officer
◦ Eduardo Arispe, FHWA Lab Manager
Purpose of Webinar Schedule for Webinar
◦ Presentation of Information
◦ Q&A
◦ Virtual Site Visit of the Lab (video, pictures)
◦ Note: Summary Q&A to be posted at beta.SAM.gov by Monday 8/10/2020
Agenda
1. Research Program Background
2. Technical Scope of RFP
3. IDIQ Task Areas
4. RFP, Procurement Schedule and Info
5. Authorized Commercial Use of the FOIL
6. Proposal Instructions & TOPR 1
7. Evaluation Factors and Process
8. Q&A
9. FOIL Virtual Site Visit
Research Program Background FHWA’s Office of Safety R&D Roadway Team
◦ Performs advanced crash analysis research and technical support activities to improve highway and vehicle safety, improve infrastructure security
◦ Contactors provide technical and engineering support services to perform activities such as crash modeling and simulation, analysis and development of systems for physical protection and security, and crash and impact testing onsite at the FOIL to characterize roadside hardware and material properties.
◦ Our program looks to:
Expand Knowledge Develop Methods & Tools Develop & Evaluate Countermeasures Technology Transfer & Support
Sample Research Projects – Rail Height
Analysis
- 40mm (1.5” lower than Standard Height)
Sample Research Projects – FE Tire Model
Improvement
Sample Research Projects – Safety Implications of
NCHRP350 hardware tested under MASH
MASH Test - NJ Shaped Barrier
Sample Research Projects – Rear Impact
Seat Study
With Head Restraint
Without Head
Restraint
Sample Research Projects – DOS Knew Wall
Barrier Development & Test
Interaction with FHWA and other onsite/offsite Contractors/Agencies
◦ NCHRP
◦ SBIR
◦ State DOT’s
◦ Other Research Institutions
Technical Scope of RFP
Scope of Work for this RFP
◦ (1) On-site Support to Maintain, Operate and
Support the FOIL
◦ (2) On & Off-site Activities to Conduct
Research and Provide Program Support
Funding/Projects for Other Agencies
◦ NHTSA
◦ Department of State
IDIQ Task Area A
Task Area A: Crash Modeling and Simulation
◦ A-1: Develop, Validate, and Maintain Finite
Element (FE) Models of Vehicles and Hardware
◦ A-2: Advancement of Modeling and Analysis
Strategies and Techniques
◦ A-3: Research Reporting, Information Sharing, and Collaboration
IDIQ Task Area B
Task Area B: Analyze and Develop Systems for Physical Protection and Security
IDIQ Task Area C
Task Area C: Operate and Maintain the Federal Outdoor Impact Laboratory (FOIL) at TFHRC
◦ C-1: General FOIL Operation and
Maintenance Onsite at TFHRC
◦ C-2: Conduct Crash Tests and Impact Tests at the FOIL to Characterize Material Properties and Support Crash Analysis Research
Overview of RFP
Full & Open Competition One Award Planned IDIQ Contract Type
◦ Firm Fixed Priced, Labor Hour, or Time &
Materials Task Orders
◦ Section C.5.1 lists all Labor Category
Requirements
Onsite vs. Offsite Work
◦ Government Furnished Property on Lab
Management Task Order
Overview of RFP
RFP Written in Uniform Contract Format Sections A through J = Model Contract Section K = Reps and Certs Section L = Proposal Instructions Section M = Evaluation Factors for Award
Period of Performance of 5 Years
◦ Task Orders may include Option Periods
Procurement Schedule and Info
RFP Issued 7/31/2020
◦ Please submit your questions by 8/24/2020
RFP Closes 9/1/2020 at 4:30 pm Eastern
◦ E-mail Offers to Sarah.Tarpgaard@dot.gov
Estimated Award Effective Date 1/15/2021 or sooner
Check www.beta.SAM.gov for RFP Amendments and Q&As mailto:Sarah.Tarpgaard@dot.gov http://www.beta.sam.gov/
Authorized Commercial Use of the FOIL
See RFP Attachment J.9.
OK to use lab for commercial non-contract purposes.
◦ Up to 500 hours/year (estimated to be 25% of the total use)
◦ “in exchange for fair rental or other adequate consideration”
Coordinate very closely with the COR on schedule.
Track usage and report in monthly progress report.
Contractor must operate lab during commercial use.
Visitors subject to TFHRC security procedures.
Adequate consideration: % cost share of Task Order #1.
Goal to increase non-contract use in future if possible.
Proposal Instructions
See RFP Section L Submit proposal by Email Volume I Technical Capability
40-Page Max for Parts I-III No page limit for Parts IV-V
Volume II Business and Price Separately Bound from Volume I No page limit for Parts I –V 5-Page Max for Part VI
Proposal Instructions - Pricing
Loaded Labor Rates (Fully Burdened)
◦ Attachment J-1 Table Completed
◦ Covers Prime & Subcontractor Labor
Other Direct Costs
◦ Identify Indirect Rates and Bases for Time &
Material Task Orders
◦ No Profit on Other Direct Costs
Proposal Instructions – TOPR #1 See Attachment J.10 for TOPR #1, “Operate &
Maintain the FOIL”
◦ Planned Time & Materials Task Order for award concurrent with IDIQ award or immediately after.
Include Task Order Technical Approach in Volume I
Include Task Order Price Proposal in Volume II
◦ Propose a % cost share to be deducted from monthly invoices as adequate consideration for authorized commercial non-contract use of FOIL.
Evaluation Factors
RFP Section M.2 Lists Evaluation Factors:
◦ Technical Capability
◦ Past Performance
◦ Price
◦ Small Business Subcontracting Plan (If applicable, evaluated but not rated.)
Integrated Assessment / Best Value Selection Decision
◦ Govt. May Select Other Than Lowest Price
Evaluation Process
Process of Evaluation Technical Evaluation Panel Past Performance Evaluation Price Evaluation Small Business Plan Evaluation
Award Without Discussions Unless Discussions Deemed Necessary
Contracting Officer = Selection Official
Questions?
Questions and answers from today will be summarized and issued at beta.SAM.gov by Monday
Direct further questions to Sarah Tarpgaard, FHWA Contracting Officer, at sarah.tarpgaard@dot.gov; (202) 493-3225 mailto:sarah.tarpgaard@dot.gov
FOIL Virtual Site Visit
Eduardo Arispe, FHWA, Lab Manager
Thank You
FHWA Federal Outdoor Impact Lab (FOIL)
Runout Area
Test Control Center, Conference Room & Office
Trailers
Vehicle Preparation
Facility
Vehicle –Parts Storage Buildings & Lot
Impact Area
Pendulum Area
Propulsion System Building
Track
FOIL Elements:
Facilities
◦ Vehicle & hardware prep building & shop
Vehicle accelerator
◦ Impact pendulum
◦ Accelerator
◦ Test control center
◦ Digital data capture equipment
Capabilities
◦ Vehicles up to 62 mph (depending upon mass)
◦ Pendulum impacts up to 2000 lbs @ 25 mph
Prep Facility:
Three bays Accommodates cars & trucks Vehicle hoists Equipment storage CG measurement equipment Full range of tools
Impact Pendulum:
Swing weights
◦ 2000kg & 820kg
◦ Various noses
◦ Ball weight
Drop weights Test article drop (e.g., roof crush, fuel tanks) Jig & attachments for mounting test articles Soil pit
Vehicle Accelerator:
Messering Continuous loop cable Computer controlled Runway (220 feet) Capabilities
◦ Full range of speeds for cars
◦ Up to 100 k/hr for trucks up to 15,000 lbs
Environmentally controlled ready room
Vehicle Accelerator:
Test Control Center:
Control computers
◦ Accelerator control
◦ Pendulum control
Data computers
◦ Accelerometers, load cells, speed traps, strain gages & other test recording devices
◦ Video feeds
Visitor center Staff offices
Data Collection Capabilities:
Video
◦ High speed video cameras
◦ Commercial video cameras
◦ High speed film cameras
Data devices
◦ Accelerometers
◦ Strain gages
◦ Load cells
◦ String pots
Multi-channel data bus
Types of Tests Conducted at the FOIL:
Full scale tests
◦ Vehicles into longitudinal barriers
◦ Vehicle side impacts into poles
◦ Vehicle to vehicle side impacts
◦ Trucks into anti-ram barriers
◦ Bogies into sign supports
Pendulum tests
◦ Guardrails post embedment
◦ Roof crush tests
◦ Mailbox & sign supports
◦ Cable strengths tests
◦ Vehicle component tests (e.g., engine mounts, suspension, windshield damage)
| Pre-Proposal Webinar �and Virtual Site Visit |
| Welcome |
| Agenda |
| Research Program Background |
| Research Program Background |
| Research Program Background |
| Research Program Background |
| Research Program Background |
| Research Program Background |
| Research Program Background |
| Technical Scope of RFP |
| IDIQ Task Area A |
| IDIQ Task Area B |
| IDIQ Task Area C |
| Overview of RFP |
| Overview of RFP |
| Procurement Schedule and Info |
| Authorized Commercial Use of the FOIL |
| Proposal Instructions |
| Proposal Instructions - Pricing |
| Proposal Instructions – TOPR #1 |
| Evaluation Factors |
| Evaluation Process |
| Questions? |
| FOIL Virtual Site Visit |
| Slide Number 26 |
| FOIL Elements: |
| Prep Facility: |
| Impact Pendulum: |
| Vehicle Accelerator: |
| Vehicle Accelerator: |
| Test Control Center: |
| Data Collection Capabilities: |
| Types of Tests Conducted at the FOIL: |