693JF722R000013 Amd 0003.pdf
PDF 253 KB Posted
- Attached to
- Fulton Hall Boiler Replacement Federal contract opportunity
- Solicitation number
- 693JF722R000013
About this file
This document contains an amendment to a solicitation for a federal contract opportunity. The amendment extends the deadline for proposal submissions to May 27, 2022 at 2:00 pm EDT. It also provides updated questions and responses related to the project scope, as well as additional photos of the project site. The solicitation is for complete mechanical services to remove two existing boilers and temporary piping, and install four new boilers at the U.S. Merchant Marine Academy located in Kings Point, NY. The Department of Transportation Maritime Administration is the contracting agency. Proposals must include plans to install the new boilers and provide training by October 1, 2022, though proposals extending beyond this date will also be considered.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FULTON GIBBS TURBINE PIC 1 .pdf | ||
| FULTON GIBBS TURBINE PIC 3.pdf | ||
| FULTON GIBBS TURBINE PIC 2.pdf | ||
| 693JF722R000013 Amd 0002.pdf | ||
| RFP 693JF722R000013 Amendment 0001 Rev..pdf | ||
| Sol 693JF722R000013 Amendment 0001.pdf | ||
| RFP 693JF722R000013.pdf | ||
| Fulton Boilers Statement of Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693JF722R000013
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WASHINGTON DC 20590-0001
693JF7
MAIL STOP W-28-201
1200 NEW JERSEY AVENUE SE
OFFICE OF ACQUISITION MAR-380
US DOT MARITIME ADMINISTRATION
05/23/20220003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/05/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
1. Extend the established time and date for receipt of proposals to 2:00 pm EDT on Friday, May 27, 2022,
2. Provide updated questions and responses, and to
3. Provide additional photos.
Interested parties are encouraged to thoroughly review all documents, including the
Questions and Responses previously posted, prior to submitting a proposal in response to the solicitation.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ERICA L. WILLIAMS
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693JF722R000013/0003
All other solicitation terms and conditions remain unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation No. 693JF722R000013 Fulton Boiler Requirement
Response to Questions/Comments Amended 05/23/2022
Question 1) There is concern with building the boilers in place vs one assembly due to clearance issues. Currently there is a large turbine and its enclosure next to the older boiler, which blocks future access. Will this be removed prior to the start of work? If not, is it the contractor’s responsibility?
Response – The steam turbine casing and gas turbine display (on wheels) may be relocated by the contractor if desired for additional access. The contractor would be responsible for moving and later returning to the original location the steam turbine casing and/or gas turbine display if the additional access is desired. If these are to be relocated outside of the building into the parking lot, they need to be protected from the elements by means such as shrink wrapping. The steam turbine and gas turbine are part of active labs so minimizing the time they are displaced is helpful to the engineering curriculum.
Please see newly posted photos “Fulton Gibbs Turbine Pic 1”, “Fulton Gibbs Turbine Pic 2” and “Fulton Gibbs Turbine Pic 3”.
Question 2) A turbine was located near or on the boiler unit. Will this turbine need to be removed or will it stay in place.
Response – The steam turbine casing and gas turbine display (on wheels) may be relocated by the contractor if desired for additional access. The contractor would be responsible for moving and later returning to the original location the steam turbine casing and/or gas turbine display if the additional access is desired. If these are to be relocated outside of the building into the parking lot, they need to be protected from the elements by means such as shrink wrapping. The steam turbine and gas turbine are part of active labs so minimizing the time they are displaced is helpful to the engineering curriculum.
Please see newly posted photos “Fulton Gibbs Turbine Pic 1”, “Fulton Gibbs Turbine Pic 2” and “Fulton Gibbs Turbine Pic 3”.
Question 24) The statement of work indicates, “there are (3) existing 1000 gpm primary hot water pumps that are to remain. The contractor will connect the new condensing hot water boilers to the existing primary hot water distribution pumps and associated piping. Each boiler will have an individual circulator pump and tie in to the primary hot water piping header with a 6” supply and return connection.” The Cleaver Brooks CFC-E boiler does not require a circulator pump since they are high mass boilers with 285 gallons of water in each pressure vessel and are typically piped with primary pumps only. The statement of work indicates the boilers are to be provided with automatic boiler isolation valves as well which is redundant if providing individual circulator pumps. If boiler circulator pumps are required, please advise on the following information in order to select the proper pump: flow rate, head pressure, voltage, fluid (water only?), constant or variable speed, type (inline, base mounted end suction, etc).
Response – Offerors may propose alternate methods, but the system must be completely functional and operational in accordance with the boiler manufacturer’s performance specifications and the SOW.
The terminology used in the statement of work for an “individual circulator pump” was for a pump sized for each boiler that provides full load flow through the boiler at 20 deg. F differential and back to the main campus constant flow heat distribution loop.
Flow rate is based on the required boiler flow at 20 deg, F. differential. The heat distribution loop is 30 psi. 208 3-phase power is available in the space. The operating fluid is water. Pump to be appropriate for proposed boiler and boiler room layout. Pump to be constant speed.
Question 32) The solicitation requires that the contractor install the new boilers and provide training as described in the statement of work by October 1, 2022. Can I still submit a proposal if my project plan includes boiler installation and training after October 1, 2022?
Response – Yes, proposals with project plans that extend beyond October 1, 2022, may be submitted and will be considered.
| 2022-05-23T19:14:28-0400 | |
| Erica L Williams |