This document contains questions and answers regarding a solicitation for dry-docking and repair services for the Towing Vessel Elizabeth Anne. The solicitation is seeking a contractor to provide all equipment, materials, tools, labor and supervision necessary to complete a scope of work including dry docking, inspection, and repairs to the hull of the Towing Vessel Elizabeth Anne. The vessel is owned by the US Government and operated by the US Merchant Marine Academy for training purposes. Specific questions addressed in the document relate to surface preparation requirements, scope of blasting and painting, hatches and valves on ballast tanks, number and size of portholes, and details on main engine and generator exhaust lagging.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFEROR PRE-AWARD QUESTIONS

SOLICITATION # 693JF720Q000003 – PROJECT: USMMA Dry-docking of Elizabeth Anne (TV) Question & Answer Form

5 3 para 3.1.6 What surface prep is required for the main deck.

See photos. Contractor shall remove all corrosion and loose adhering paint before sweep blasting and applying new paint.

6 3 para 3.1.14

What % of the house gets an SP-6?

Approximately 30%

7 3 para 3.1.19

What size are the hatches on the ballast tanks?

The four aft hatches are all 20 inch. The fwd hatch for the forepeak ballast is 22 inch.

8 3 para 3.1.21

How many sea valves?

What size and type are they?

One sea suction valve for fire pump intake. 2 in. gate valve

9 3 para 3.1.23

How many port holes are there? What type and size are they?

14 portholes set in rubber.

All 12 inch portholes.

9a 3 para 3.1.24

Exhaust Lagging, What size? How many? How long? Pads or mud covered?

See photos. Each main engine has approximately 30’ of lagging. Currently it is a mix of pads and mud covered lagging. Each

OFFEROR PRE-AWARD QUESTIONS

SOLICITATION # 693JF720Q000003 – PROJECT: USMMA Dry-docking of Elizabeth Anne (TV) Question & Answer Form generator has 15’ of lagging and is a mix of pads and mud covered.

*Note: Offeror only needs to fill out the highlighted columns: Company, Solicitation Section (please include the section, paragraph, and page number that your question refers to), and Question. Offeror may add additional rows, if necessary. Please do not add/remove columns or change column width. Please keep this document in MS Word format.