This is Amendment No. 0001 to a federal solicitation for construction services issued by the Federal Highway Administration's Eastern Federal Lands Highway Division.
The amendment addresses a repair and flood damage project on McFarland Road (FS 23) in the Cherokee National Forest, identified as Project TN ERFO FS CHRKE804 2020-2(2), with solicitation number 693C73-26-B-000015. The primary purpose of the amendment is to provide clarifications to bidder questions, supply an amended bid schedule with corrected pay item numbers, units, and estimated quantities, provide an amended Sheet C01 (Tabulation of Quantities), and reschedule the bid opening date to Thursday, August 6, 2026, at 2:00 p.m. EDT. Key clarifications include correcting Pay Item Number 30102-0700 Aggregate Base Grading D from SQYD to Pay Item Number 30101-2000 in TON (54,000 tons estimated quantity), and revising Pay Item Number 20103-0000 Clearing and Grubbing from 9,000 SQYD to Pay Item Number 20102-0000 in LPSM with ALL quantity, including roadside clearing. The bid schedule (Schedule A, Base) contains approximately 34 line items covering mobilization, construction survey and staking, contractor testing, soil erosion control, clearing and grubbing, tree and gate removal, pipe culvert removal, roadway excavation, rock excavation, geotextile installation, riprap placement, pipe culverts of various sizes, turf establishment, signs, temporary traffic control, and field office operations. The performance period for completion of Schedule A is 588 calendar days. All other terms and conditions of the original solicitation remain unchanged. Offers must acknowledge receipt of this amendment prior to the bid opening date and time specified. The contracting office is located at FEDERAL HIGHWAY ADMINISTRATION, EASTERN FEDERAL LANDS HIGHWAY DIVISION, QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY, SUITE E2-3-300, Attn: Acquisitions, ASHBURN VA 20147.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
See continuation page
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
SUITE E2-3-300
Attn: Acquisitions
ASHBURN VA 20147
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
SUITE E2-3-300
Attn: Construction
ASHBURN VA 20147
693C73
693C73
693C7326B000015
See Block 14 07/23/2026
06/25/2026
1 7
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
693C7326B000015/0001
Project TN ERFO FS CHRKE804 2020-2(2)
The purpose of this Amendment is to:
1) Provide a summary of responses to questions/clarifications asked by interested bidders.
2) Provide an amended bid schedule with corrected pay item numbers, units, and estimated quantities from Sheet C01.
3) Provide amended Sheet C01.
4) Reschedule the bid opening date to Thursday, August 6, 2026, at 2:00 p.m. EDT.
All other terms and conditions remain unchanged.
Amendment 0001
Information Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001 Project TN ERFO FS CHRKE804 2020-2(2)
Cherokee National Forest Solicitation: 693C73-26-B-000015
The purpose of this Amendment is to:
1) Provide a summary of responses to questions/clarifications asked by interested bidders.
2) Provide an amended bid schedule with corrected pay item numbers, units, and estimated quantities from Sheet C01.
3) Provide amended Sheet C01.
4) Reschedule the bid opening date to Thursday, August 6, 2026, at 2:00 p.m. EDT.
All other terms and conditions remain unchanged.
Questions / Clarifications
The following questions and issues were submitted to EFLHD at eflhd.conracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised, and some questions have not been included.
The Government’s direct response to the sender may also have been updated below for better clarity.
1. Sheets C01 and C02: On Sheet C01, the Unit for Pay Item Number 30102-0700 Aggregate Base Grading D is SQYD. On Sheet C02, the Unit is TON. Please clarify the correct Unit and Estimated Quantities for Pay Item Number 30102-0700 Aggregate Base Grading D.
Response: The Unit for Pay Item Number 30102-0700 Aggregate Base Grading D is incorrect on Sheet C01. See amended Sheet C01. The Estimated Quantity of 54,000 is correct.
a. Change the Pay Item Number and Unit for Pay Item Number 30102-0700 Aggregate Base Grading D, SQYD to Pay Item Number 30101-2000 Aggregate Base Grading D, TON.
2. Sheet C01: The Clearing and Grubbing line item appears to only cover 1.1 miles. However, Note 1 on Sheet B01 states that all trees (except those listed in riparian areas) should be removed 7' from reconditioning limits on both sides of roadway. Please clarify the estimated quantity for the Clearing and Grubbing line item.
Response: The Estimated Quantity and Unit for Pay Item Number 20103-0000 Clearing and Grubbing are incorrect on Sheet C01. See amended Sheet C01.
a. Change the Pay Item Number, Unit, and Estimated Quantity for Pay Item Number 20103-0000 Clearing and Grubbing, SQYD, 9,000 to Pay Item Number 20102-0000 Clearing and Grubbing, LPSM, ALL.
b. Roadside clearing is included in Pay Item Number 20102-0000 Clearing and Grubbing.
Plan Sheet Revisions
1. Remove Sheet C01 and replace it with Amended Sheet C01.
file://///fhfl15fileserve.flhd.fhwa.dot.gov/data/PROJECTS/_ACCESS/NY/Projects/natr/1e10/Proj_Dev/Eng_Coord/3Advertisement/Amendments/Amendment%201/Final%20Documents/eflhd.conracts@dot.gov
������+,��� �-./01�23415�/67�89447�7/5/:-�46�;<�/19/67��4/7�#���!=$ ��%�&�'()��>?@��� A/2-�BCDEFGD�HIFCDJDK�LFK��DMNO�4��4631/<3�PQ/6303R�S/R�T3-52UV�W JCM��DMN�XINYME LFK��DMN�XINYME �MOGEJZDJBC �IZZ[MNMCDF[�MOGEJZDJBC HIFCDJDK CJD CJD�LEJGM UNBICD*\��� \]\�\"���� ;�AT̂T_*�T�� *̂^ Ŝ�;*\�\� \]!�\"���� ������̀ ��T����̀ �a�b�*�c���*�T�d *̂^ Ŝ�;*\�!� \] �\"���� �����*���������T�d *̂^ Ŝ�;*\�=� \]e�\"���� ��T̂�����T���������̂ *̂^ Ŝ�;*��\ *\� � !�\�!"���� �̂ �*�T�d�*�c�d�̀ AAT�d *̂^ Ŝ�;*��\ *\� � !�\�="���� �̂ �*�T�d�*�c�d�̀ AAT�d fg���h����Pbc*\�]� !�!!�"\��� ��;�a*̂g�T�cTaTc̀ *̂����� \!h����*��*\�i� !�=�\"\\�� ��;�a*̂����d*�� =h����*��*\�e� !�=�!"!\�� ��;�a*̂����STS���̀ â��� \gi��h��� �̂��*\��� !� �\"���� ��*cj*b��k�*a*�T�� =g!]�h����̀ bc*\�f� !� !\"���� ������k�*a*�T�� e]]h����̀ bc*\\�� !�e�\"\��� ��S*�*�T���d����k�T̂�g�j�a�� e��h����Pbc*\\\� !�e�="\!�� d����k�T̂���T̂���g��̂ *���\g����"j�a�� \g=��h����Pbc*\\!� !]\�\"�!�� Ŝ*��c��TS�*Sg��̂ *���! i]�h����̀ bc*\\=� !]\�\"�=�� Ŝ*��c��TS�*Sg��̂ *���= e�h����̀ bc*\\ � !]\�\"�]�� Ŝ*��c��TS�*Sg��̂ *���] \ ]h����̀ bc*\\]� !]]�\"=��� ;���*�T�*̂ b̂���*AT̂T_�c��*����j*̂ ĝ���j` !gf��h����P��*\\e� =�\�\"���� *dd��d*���A*�� =gf��h������*��\ *\\f� =�\�\"!��� *dd��d*���A*���d�*cT�d�c ] g���h������*��\ *\\f� =�\�!"�e�� *dd��d*���A*���d�*cT�d�cg�i"T����c�S�� ] g���h����Pbc*\!�� =�=�\"i��� ��*cj*b������cT�T��T�d \ h=��;T̂�*\!\� i�!�\"���� ! "T����STS���̀ â��� \g=]�h��� �̂��*\!!� i�!�\"�f�� =�"T����STS���̀ â��� \i\h��� �̂��*\!=� i�!�\"\��� =i"T����STS���̀ â��� ffh��� �̂��*\! � i�!�\"\\�� !"T����STS���̀ â��� =]h��� �̂�� A"\A07��<l-7Q9-S14m-<3n������������������� �!�!�"!#!$g��-./01�23415�/67�89447�7/5/:-�46�;<�/19/67��4/7�#���!=$
| ��� | �� | ��� |
| � | �� |
| ��� | �� | ��� |
| � | �� |
| ��� | �� | ��� |
| � | �� |
| ��� | �� | ��� |
| � | �� |
| �!��"� | !��� |
| � �������������� ���������� ! | � |
| ���� �$%&'&()*&$+ �����!������ ���������� � | ��� |
| ��� | �� ���������!,%-&**./ |
"01
!23./,'.
�$*)'1
!23./,'.�4$5.2*6
���7���� ������8�9 �.:)&4 ;*$4- �2�)4')+/ 8�!
��9
B - 3
BID SUMMARY
Project TN ERFO FS CHRKE804 2020-2(2)
(1) Schedule A (Base Contract) Bid Total (from Page B-2) = (1) $____________________
The performance period for the completion of Schedule A is 588 calendar days.
CHEROKEE NATIONAL FOREST
C
M c F a rl a n d
Q U
A N
T
IT
Y T
A B
L E
.d g n
[T a b u la ti o n o f Q u a n ti ti e s
:2
:0
A
M
/1
/2
DISASTER #: TN2020-2-FS
PROJECT
NUMBER
SHEET
CHRKE804 2020-2(2)
TN ERFO FS
NO. DATE BY REVISIONS U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS
C01
TABULATION OF QUANTITIES07/16/26 AB AMD #1 - Line Item A1190 revised pay item to 30101-2000
AB07/16/26 AMD #1 - Line Item A1040 revised pay item to 20102-0000
AMENDMENT NO. 1
Amendment 0001
| SF 30 - Prism.pdf |
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .