This document is a Results of Bid Opening from the Federal Highway Administration's Eastern Federal Lands Highway Division for a construction project at Cherokee National Forest.
The solicitation number is 693C73-26-B-000008 (referenced as 693C73-25-B-000008 in detailed tables), with project designation TN ERFO FS CHRKE804 2020-2(3). The bid opening occurred on May 5, 2026, at 2:00 p.m. local time in Ashburn, VA. The performance period for completion of Schedule A is 384 calendar days. Nine bids were received from contractors: Apex Construction Group, LLC ($7,095,680.00 - low bid); Precise Concrete Works, LLC ($8,869,568.94); Herve Cody Contractor, LLC ($9,349,863.00); Engineer's Estimate ($9,126,000.00); Howard W. Pence, Inc. ($10,364,957.54); Miami Marine Services, LLC ($10,594,983.51); New Dominion Construction, LLC ($10,658,025.80); RKE Contractors ($10,995,273.00); and Road Worx, Inc. ($12,785,531.96). All bids are for Schedule A work only. The Eastern Federal Lands Highway Division notes that it is conducting a thorough review and verification of all information and will contact the low bidder once the review is completed. This abstract does not indicate the final award recipient.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Categorical Exclusion Form (NEPA).pdf | ||
| IFB Solicitation - TN ERFO FS CHRKE804 2020-2(3).pdf | ||
| FP24_Eng.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Geo Report.pdf | ||
| VETS-4212 Form.pdf | ||
| Plans - TN ERFO FS CHRKE804 2020-2(3).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration
Eastern Federal Lands Highway Division
Results of Bid Opening
Cherokee National Forest
PROJECT: TN ERFO FS CHRKE804 2020-2(3)
SOLICITATION NO. 693C73-26-B-000008
May 5, 2026, at 2:00 p.m.
Ashburn, VA
*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award.
The low bidder will be contacted once a thorough review has been completed.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-25-B-000008
Project: TN ERFO FS CHRKE804 2020-2(3)
May 5, 2026, 2:00 p.m. local time
The performance period for the completion of Schedule A is 384 calendar days.
BIDDER SCHEDULE TOTAL TOTAL PRICE
Apex Construction Group, LLC SCHEDULE A
$7,095,680.00
SCHEDULE A =
$7,095,680.00
Herve Cody Contractor, LLC SCHEDULE A
$9,349,863.00
SCHEDULE A =
$9,349,863.00
Howard W. Pence, Inc. SCHEDULE A
$10,364,957.54
SCHEDULE A =
$10,364,957.54
Miami Marine Services, LLC SCHEDULE A
$10,594,983.51
SCHEDULE A =
$10,594,983.51
*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award.
The low bidder will be contacted once a thorough review has been completed.
BIDDER SCHEDULE TOTAL TOTAL PRICE
New Dominion Construction, LLC SCHEDULE A
$10,658,025.80
SCHEDULE A =
$10,658,025.80
RKE Contractors SCHEDULE A
$10,995,273.00
SCHEDULE A =
$10,995,273.00
Road Worx, Inc. SCHEDULE A
$12,785,531.96
SCHEDULE A =
$12,785,531.96
Precise Concrete Works, LLC SCHEDULE A
$8,869,568.94
SCHEDULE A
$8,869,568.94
*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award.
The low bidder will be contacted once a thorough review has been completed.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-25-B-000008
Project: TN ERFO FS CHRKE804 2020-2(3)
May 5, 2026, 2:00 p.m. local time
The performance period for the completion of Schedule A is 384 calendar days.
BIDDER SCHEDULE TOTAL TOTAL PRICE
Engineer’s Estimate SCHEDULE A
$9,126,000.00
SCHEDULE A =
$9,126,000.00
*EFL is reviewing and verifying all information. This abstract is not indicative to who will receive the award.
The low bidder will be contacted once a thorough review has been completed.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-25-B-000008
Project: TN ERFO FS CHRKE804 2020-2(3)
May 5, 2026, 2:00 p.m. local time
The performance period for the completion of Schedule A is 384 calendar days.
| Slide 1 |
| Slide 2: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-25-B-000008 Project: TN ERFO FS CHRKE804 2020-2(3) May 5, 2026, 2:00 p.m. local time The performance period for the completion of Schedu |
| Slide 3: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-25-B-000008 Project: TN ERFO FS CHRKE804 2020-2(3) May 5, 2026, 2:00 p.m. local time The performance period for the completion of Schedu |
| Slide 4: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-25-B-000008 Project: TN ERFO FS CHRKE804 2020-2(3) May 5, 2026, 2:00 p.m. local time The performance period for the completion of Schedu |
File details come from the government source that posted it. Updated .