Results of Bid Opening - AR ERFO FS 2020-1(1).pdf
PDF 124 KB Posted
- Attached to
- Ozark National Forest
- Solicitation number
- 693C73-25-B-000010
About this file
This document is a Bid Opening results file for a Federal Highway Administration project in the Ozark National Forest. Five bidders submitted proposals for the AR ERFO FS 2020-1(1) project with Schedule A bids ranging from $4,993,690.00 (Fidelis-BBD, LLC) to $13,690,045.51 (Randy Kinder Excavating Inc), with the Engineer's Estimate at $7,300,000.00. The project involves repairing a landslide on Morgan Mountain Road and includes grading, drainage, mechanically stabilized earth retaining wall, riprap, aggregate base course, and related work. The performance period is 145 calendar days, and the solicitation was specifically targeted to Service-Disabled, Veteran-Owned Small Business Concerns. The bid opening occurred on July 15, 2025, at 2:00 p.m. in Ashburn, VA, for a project located in Madison County, Arkansas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration
Eastern Federal Lands Highway Division
Bid Opening for
Ozark National Forest
PROJECT: AR ERFO FS 2020-1(1)
SOLICITATION NO. 693C73-25-B-000010
July 15, 2025, at 2:00 p.m.
Ashburn, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-25-B-000010
Project: AR ERFO FS 2020-1(1)
July 15, 2025, 2:00 p.m. local time
The performance period for the completion of Schedule A is 145 calendar days.
BIDDER SCHEDULE TOTAL TOTAL PRICE
Abrams Group Construction LLC SCHEDULE A
$8,831,345.25
SCHEDULE A =
$8,831,345.25
AVCOR Construction, LLC SCHEDULE A
$9,503,174.00
SCHEDULE A =
$9,503,174.00
Fidelis-BBD, LLC SCHEDULE A
$4,993,690.00
SCHEDULE A =
$4,993,690.00
Randy Kinder Excavating Inc SCHEDULE A
$13,690,045.51
SCHEDULE A =
$13,691,045.51
Semper Tek Inc SCHEDULE A
$5,494,427.33
SCHEDULE A =
$5,494,427.33
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-25-B-000010
Project: AR ERFO FS 2020-1(1)
July 15, 2025, 2:00 p.m. local time
The performance period for the completion of Schedule A is 145 calendar days.
BIDDER SCHEDULE TOTAL TOTAL PRICE
Engineer’s Estimate SCHEDULE A
$7,300,000.00
SCHEDULE A =
$7,300,000.00
| Slide 1 |
| Slide 2: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-25-B-000010 Project: AR ERFO FS 2020-1(1) July 15, 2025, 2:00 p.m. local time The performance period for the completion of Schedule A is |
| Slide 3: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-25-B-000010 Project: AR ERFO FS 2020-1(1) July 15, 2025, 2:00 p.m. local time The performance period for the completion of Schedule A is |
File details come from the government source that posted it. Updated .