693C7322R000019 - Amendment-0003.pdf

PDF 193 KB Posted

Attached to
2022 Architect/Engineer Bridge Inspection and Engineering Services Federal contract opportunity
Solicitation number
693C73-22-R-000019
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to 2022 Architect/Engineer Bridge Inspection and Engineering Services, newest first.
File Type Posted
FLH Bridge Inspection Manual_Current_20211227.pdf PDF
693C7322R000019 - Amendment-0002.pdf PDF
FLH Tunnel Inspection Manual - WO Comments.pdf PDF
Q and A Responses-07252022.pdf PDF
693C7322R000019- Amendment-0001.pdf PDF
Phase 1-RFQ-693C73-22-R-000019.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7322R000019 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

BIS07/11/20220003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/11/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Bridge Inspection IDIQ - To award MATOC for inspection of bridges, culverts, and tunnels throughout the U.S. and its territories.

This amendment is to provide responses to questions in reference to the request for qualifications. Due date for responses remain the same.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MELVIN SLOAN

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

1. For Evaluation Factor 4 – Past Performance, does the date of the CPAR also need to be within the last seven years? One of our intended Sec F projects was completed in 2015 but the CPAR rating is from 2011. The date of the CPAR/evaluation needs to be within the last 7 years.

2. If a large business is submitting as a prime, can they also be on another large business team as a subconsultant? Yes.

3. SF330 Part II – Submit for each sub by addressing a transmittal letter to the office shown. Please clarify. Does this just mean we need to state the subs we are using in the transmittal letter to you? Yes.

4. Sec E – Resumes - Resumes submitted for key personnel of outside consultants will not be considered. Does this mean resumes are only accepted from employees of the Prime consultant, none from subconsultants? No. This means resumes will not be accepted from persons who are not currently employed by the Prime consultant or the proposed subconsultants.

5. In Amendment 1, Question 17 states “For the small business set-asides, what is the minimum percent that must be completed by the small business entity.” The answer provided was “15%”.

Please confirm 15% is the intended answer and this was not a typo. The correct answer is 50%.

6. Page 9 of the solicitation states: Submit Evaluation Factor 3 information in Section H of the SF

330. Only information contained in Section H of the SF 330 will be used to evaluate Factor 3.

Narrative submitted for Evaluation Factor 3 shall not exceed three (pages) single-sided, minimum acceptable text size 12-point. Additionally, the response to question 9 in the Amendment permits additional content in Sections E, F, and H “but would count against each Section’s page limit.” The response to question 4 appears to allow additional content in Section H.

We understand the page limit for Section E to be 30 pages (15 two-page resumes) and for Section F to be 20 pages (5 four-page project descriptions). Can you clarify as to the total page limit for Section H? Currently the only page limit we see in the solicitation is that the response to Evaluation Factor 3 within Section H shall not exceed three pages. Is that the overall limit for Section H? In section H, the specific narrative response to Evaluation Factor 3 is limited to three pages. There is no overall page limit for Section H.

7. Please confirm if we are permitted to use a Section F SF 330 from one of our subconsultants for Evaluation Factor 1 or if all five examples should be from the prime firm only. All 5 examples are to be from the Prime firm only.

8. The evaluation criteria for Evaluation Factor 2 - Professional Qualifications makes reference to “… personnel identified have bridge and tunnel inspection and related inspection support experience and have performed this work for the firm for 5 or more years.” Our interpretation of this criteria is that the Sec. E forms must clearly state the number of years of experience each individual has for this type of work, but we do not need to include projects going back five years or more. Please confirm if our interpretation is correct. The Section E forms must clearly state the number of years of experience everyone has performed this type of work for the firm.

9. Page 7, Evaluation Factor 2 – “75% of the personnel identified have bridge and tunnel inspection and related inspection support experience and have performed this work for the firm for 5 or more years.” Can all personnel identify on the org chart count toward the 75% rule above? Or only those with a resume? Only those persons with a resume.

10. Will FHWA accept a two week or more NY and PA state comprehensive bridge inspection course as equivalent to NHI- Safety Inspection of In-Service Bridges #130055? Yes.

11. Per Amendment No. 1

Question # 14

The instructions for Factor 1-Specialized Experience on page 3 state: “Complete one Section F per contract/task order, up to five (5) contract/task orders completed within the last seven

(7) years. Contract/task orders outside the last seven (7) years will not be counted in the evaluation.” For this factor, may we provide an ongoing contract that is nearing completion, but is not yet complete, for which we have completed dozens of highly relevant task orders?

If the contract is not complete it may not be submitted as a single project. However, individual task orders that were a part of that contract and have been completed may be submitted as separate projects.

As a current FHWA IDIQ contract holder, the above disallows our firm from using our current IDIQ contract expiring in September 2022 as a Section F project. Due to the Government’s decision to interrupt the two-cycle procurement process, other FHWA IDIQ contract holders whose contracts were completed recently have the option of using their entire IDIQ as a Section F project.

This appears to be a disadvantage to current IDIQ contract holders as this requires current IDIQ contract holders to only use single Task Orders as a project vs. using the entire IDIQ contract (e.g. 36 task orders).

Is this the Government’s intent? The Government’s intent is to consider only those contracts or task orders that are completed, as stated in the solicitation.

File details come from the government source that posted it. Updated .