Results of Bid Opening - NP SER PMS FY21(1).pdf
PDF 90 KB Posted
- Attached to
- Everglades National Park
- Solicitation number
- 693C73-22-B-000005
About this file
This document outlines the results of a bid opening for a federal contract to provide pavement preservation services at Everglades National Park. Five contractors submitted bids for the project, which includes crack cleaning and sealing, asphalt patching, pavement marking installation, and other miscellaneous work split into multiple schedules. Bid totals ranged from $5,860,755.56 to $8,471,166.80. The independent government estimate for all work was $6,078,000.00. The solicitation seeks certified small businesses to address pavement preservation needs at the park under solicitation number 693C73-22-B-000005, with work expected to fall between $5-10 million. The contractor selection period is not stated. The contract will be awarded by the Federal Highway Administration Eastern Federal Lands Highway Division.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans - NP SER PMS FY21(1).pdf | ||
| EVER_C6_RipReport.pdf | ||
| FP14_Eng.pdf | ||
| IFB Solicitation - NP SER PMS FY21(1).pdf | ||
| ADV Bidders Qualifications Form.doc | DOC document | |
| EVER_C6_RouteID.pdf | ||
| VETS-4212 Form.pdf | ||
| Categorical Exclusion Form (NEPA).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration
Eastern Federal Lands Highway Division
Bid Opening for
Everglades National Park
PROJECT: NP SER PMS FY21(1)
SOLICITATION NO. 693C73-22-B-000005
March 24, 2022 at 2:00 p.m. EST
Ashburn, Virginia
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-22-B-000005
Project: NP SER PMS FY21(1)
March 24, 2022, 2:00 p.m. EST
If the Government awards the contract as Schedules A through D, the performance period to complete all contract work will be 213 calendar days. If separate: Schedule A will be 73 calendar days; Schedule B will be 47 calendar days; Schedule C will be 73 calendar days; and Schedule D will be 98 calendar days.
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Bryant’s Land and
Development Industries, Inc.
SCHEDULE A
$1,614,723.00
SCHEDULE B (GOVERNMENT OPTION 1)
$362,851.00
SCHEDULE C (GOVERNMENT OPTION 2)
$870,559.00
SCHEDULE D (GOVERNMENT OPTION 3)
$3,850,209.20
SCHEDULE A + OPTION 1 +
OPTION 2 + OPTION 3 =
$6,698,342.20
Central Southern Construction
Corp.
SCHEDULE A
$1,481,059.00
SCHEDULE B (GOVERNMENT OPTION 1)
$869,045.30
SCHEDULE C (GOVERNMENT OPTION 2)
$1,256,169.50
SCHEDULE D (GOVERNMENT OPTION 3)
$2,724,228.50
SCHEDULE A + OPTION 1 +
OPTION 2 + OPTION 3 =
$6,330,502.30
BID OPENING for SOLICITATION NO. 693C73-22-B-000005
Project: NP SER PMS FY21(1)
March 24, 2022, 2:00 p.m. EST
If the Government awards the contract as Schedules A through D, the performance period to complete all contract work will be 213 calendar days. If separate: Schedule A will be 73 calendar days; Schedule B will be 47 calendar days; Schedule C will be 73 calendar days; and Schedule D will be 98 calendar days.
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Construction Solutions Group, LLC
SCHEDULE A
$1,009,877.15
SCHEDULE B (GOVERNMENT OPTION 1)
$323,832.22
SCHEDULE C (GOVERNMENT OPTION 2)
$903,304.59
SCHEDULE D (GOVERNMENT OPTION 3)
$3,623,741.60
SCHEDULE A + OPTION 1 +
OPTION 2 + OPTION 3 =
$5,860,755.56
Justin J. Reeves, LLC SCHEDULE A
$1,692,854.70
SCHEDULE B (GOVERNMENT OPTION 1)
$852,846.35
SCHEDULE C (GOVERNMENT OPTION 2)
$2,381,912.82
SCHEDULE D (GOVERNMENT OPTION 3)
$1,671,357.00
SCHEDULE A + OPTION 1 +
$6,598,970.87
BID OPENING for SOLICITATION NO. 693C73-22-B-000005
Project: NP SER PMS FY21(1)
March 24, 2022, 2:00 p.m. EST
If the Government awards the contract as Schedules A through D, the performance period to complete all contract work will be 213 calendar days. If separate: Schedule A will be 73 calendar days; Schedule B will be 47 calendar days; Schedule C will be 73 calendar days; and Schedule D will be 98 calendar days.
BIDDER’S BID TOTALS DAYS TOTAL PRICE
LEE Construction Group, Inc. SCHEDULE A
$1,215,090.72
SCHEDULE B (GOVERNMENT OPTION 1)
$498,569.64
SCHEDULE C (GOVERNMENT OPTION 2)
$1,425,262.70
SCHEDULE D (GOVERNMENT OPTION 3)
$5,332,243.12
SCHEDULE A + OPTION 1 +
OPTION 2 + OPTION 3 =
$8,471,166.8
ENGINEER’S ESTIMATE SCHEDULE A
$960,000.00
SCHEDULE B (GOVERNMENT OPTION 1)
$468,000.00
SCHEDULE C (GOVERNMENT OPTION 2)
$1,310,000.00
SCHEDULE D (GOVERNMENT OPTION 3)
$3,340,000.00
SCHEDULE A + OPTION 1 +
$6,078,000.00