This solicitation is for pavement preservation services at Everglades National Park. The project consists of crack cleaning and sealing, asphalt patching, pavement marking installation, and other miscellaneous work for roads and parking areas within the park. The work will be split into multiple schedules with the total project cost estimated between $5 million to $10 million. Certified small businesses may submit sealed bids by the due date in February 2022 specified on the SF 1442 form. Interested vendors must register on www.sam.gov to receive notifications and view solicitation documents. Annual representations and certifications must be completed on www.sam.gov along with VETS-4212 on dol.gov. Questions should be directed to eflhd.contracts@dot.gov and must include the solicitation number, project name and number, requester information, and contact details. Bidders must be registered in SAM for payment processing in accordance with FAR requirements. Security protocols are outlined for building access to attend bid openings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP SER PMS FY21(1).pdf | ||
| ADV Bidders Qualifications Form.doc | DOC document | |
| EVER_C6_RipReport.pdf | ||
| EVER_C6_RouteID.pdf | ||
| IFB Solicitation - NP SER PMS FY21(1).pdf | ||
| FP14_Eng.pdf | ||
| VETS-4212 Form.pdf | ||
| Categorical Exclusion Form (NEPA).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Sheet
Symbols And Abbreviations
Site Locations
Typical Section
Tabulation of Quantities
Erosion & Sediment Control Narrative
Standards And Details
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
NP SER PMS FY21(1)
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 46.94 Miles
SPECIFICATIONS:
miscellaneous work.
milling and overlay, pavement marking, and other sealing, micro surfacing, asphalt concrete patching, Work consists of crack cleaning and sealing, chip
Everglade National Park in the Southeast Region.
of 59.50 miles of roadway and parking areas within
This project consists of the pavement preservation
N
COLLIER, MIAMI-DADE, AND MONROE COUNTIES, FLORIDA
EVERGLADES NATIONAL PARK
PAVEMENT PRESERVATION OF ROADS AND PARKING AREAS IN
Know what'sbelow.
before you dig.Call
R
Administration
Federal Highway
U.S. Department of Transportation
SHEET
NO
A01
C01-C02
C03-C09
M01
N01-N04
S01-S19
LANE MILES:
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
Temporary Traffic Control PROJECT NP SER PMS FY21(1) and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
ROAD: Asphalt Concrete Pavement
SEPTEMBER 2021
Project Manager
Ramesh Kotadia
Lead Designer
Shoukat Nawaz
Highway Design Manager
Alondra Sierra
59.50 Miles
KEY MAP
STATE OF FLORIDA
SCALE IN MILES
MELBOURNE
FT. LAUDERDALE
MIAMI
FORT MYERS
ST. PETERSBURG
TALLAHASSEE
JACKSONVILLE
ORLANDO
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
GEORGIA
N
A02-A03
A05-A12
B01-B02
Summaries And Schedules
A04 Location Map
No Scale
NP SER PMS FY21(1)
UNESCO
WORLD HERITAGE SITE
EVERGLADES NATIONAL PARK
:5
P
M
S e p te m b e r
A
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A N
P S
E R
P M
S F
Y (1 tt l.
d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A01
NPS DRWG NO. EVER 160 177370 PEPC 101941 PMIS 317393, 318257
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
ML
monument minimum maximum mile post main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
0.00EL. E
N 0
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION EVERGLADES NATIONAL PARK
SYMBOLS AND ABBREVIATIONS
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point benck mark back approach ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:5
S e p te m b e r
S
H E
E T
P
R O
J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -A
N
P S
E R
P M
S F
Y (1 s y m
.d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A02
N
AREA PATTERN
EVERGLADES NATIONAL PARKEVER
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
SYMBOLS AND ABBREVIATIONS
NOTE:
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2
:1
S e p te m b e r
S
H E
E T
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A
-A
N
P S
E R
P M
S F
Y
(1 s y m .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A03
SCALE IN MILE
0 12.5 25
EVERGLADES NATIONAL PARK
U.S. DEPARTMENT OF TRANSPORTATION
LOCATION MAP
:1
S e p te m b e r
A
L o c a ti o n M a p
S h e e t]
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -A
N
P S
E R
P M
S F
Y (1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A04
See Site Location 2
No work at this location
No work at this location
No work at this location
See Site Location 5
See Site Location 4
See Site Location 6
NO SCALE
SITE LOCATIONS
Sheet 1 of 8
M ia m i-
D a d e C o u n ty
M o n r o e C o u n ty
Collier County
:1
S e p te m b e r
A
K e y M a p
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -A
N
P S
E R
P M
S F
Y (1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A05
EVER-0223
EVER-0224
N
EVER 0940
See View A View A
N
EVER-0929
Sheet 3 of 8
:1
S e p te m b e r
A
S it e
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A
-A
N
P S
E R
P M
S F
Y
(1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A06
4A
4B
N4
No work at this location
M ain Park Road
EVER-0228
EVER-0903
EVER-0904
EVER-0905
EVER-0010
NO SCALE
EVER-0430
EVER-0402
EVER-0403
EVER-0012
EVER-0909
Sheet 2 of 8
:1
S e p te m b e r
A
S it e
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -A
N
P S
E R
P M
S F
Y (1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A07
0 250 500
N
4A EVER-0228
EVER-0232LZ
EVER-0232AZ
EVER-0232BZ
EVER-0232CZ
EVER-0232DZ
EVER-0232EZ
EVER-0232FZ
EVER-0232GZ
EVER-0907AZ
EVER-0907BZ
EVER-0907CZ
EVER-0907DZ
EVER-0232HZ
EVER-0232IZ
EVER-0232JZ
EVER-0232KZ
EVER-0232Z
Homes te ad
.2
Mi le
GATE
TRAIL
EVER-0010
(Included in NP SER PMS FY22(1))
Sheet 4 of 8
:5
S e p te m b e r
A
S it e
B
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -A
N
P S
E R
P M
S F
Y (1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A08
0 1 2
EVER-0204
EVER-0910
EVER-0206
EVER-0911
EVER-0913
EVER-0914
EVER-0915
EVER-0010
Main Park Road
EVER-0205
Sheet 5 of 8
EVER-0912
:4
S e p te m b e r
A
S it e
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A
N P
S E
R P
M S
F Y
(1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A09
SCALE IN FEET
0 500 1000
EVER-0010
M a in P a rk R o a d
B e a r L a k e R o a d
6A
6B
H o m e st e a d F lo ri d a
A p p ro x im a te ly M ile s
Sheet 6 of 8
:1
S e p te m b e r
A
S it e
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -A
N
P S
E R
P M
S F
Y (1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A10
0 100 200
N
EVER-0010
EVER-0408
EVER-0216
EVER-0922
EVER-0212
EVER-0921
EVER-0920C
EVER-0920B
EVER-0920A
EVER-0920F
EVER-0920E
EVER-0920D
EVER-0214
EVER-0215
EVER-0427
EVER-0213
6A
Sheet 7 of 8
:1
S e p te m b e r
A
S it e
A
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -A
N
P S
E R
P M
S F
Y (1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A11
0 250 500
EVER-0220Z
N
6B
EVER-0220AZ
EVER-0220BZ
EVER-0220CZ
EVER-0220DZ
EVER-0220EZ
EVER-0220FZ
M ai n
Pa rk R oa d
EVER-0218
Sheet 8 of 8
:1
S e p te m b e r
A
S it e
B
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\A -A
N
P S
E R
P M
S F
Y (1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) A12
CL
Existing Match
Existing
Match
VariesVa rie sVaries
Tack coat
Existing asphalt concrete pavement
Limits of Construction
Varies
Existing ground (typ.)
NOTES:
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
CL
Existing Match
Existing
Match
VariesVa rie sVaries
Existing asphalt concrete pavement
Limits of Construction
See Detail B
Varies
Existing ground (typ.)
CAPE SEAL
CL
Existing Match
Existing
Match
Va rie sVaries
Existing asphalt concrete pavement
Limits of Construction
MICRO SURFACING, TYPE 2
Varies
Existing ground (typ.)
Micro surfacing, type 2 for cape seal pavement preservation treatment.
Place chip seal in accordance with Section 407 and overlay with micro surfacing cost to the Government.
Replace curb or gutter damaged during construction operations at no additional
CO and in accordance with Section 609.
Replace wheelstops damaged due to existing age and condition as directed by the operations at no additional cost to the Government.
storage, and replacement. Replace wheelstops damaged during construction
Take reasonable precautions to prevent damage to wheelstops during removal, as directed by the CO.
pavement markings according to Details E634-01 and E634-05 materials prior to micro surfacing. Place micro surfacing and replace
Remove thermoplastic pavement markings and other deleterious as directed by the CO after paving is completed.
Reset existing wheelstops or place new wheelstops if previously damaged be treated to ensure the micro surfacing is applied to the entire parking area.
Remove wheelstops and clean debris located within the area to of construction and verify with the CO.
Determine patching limits based on conditions encountered at the time from asphalt overspray during micro surfacing.
gates and pillars, walkways, and flagstone crosswalk on Tour Route stone walls, concrete barriers, concrete islands, manholes, cemetery
Protect roadside elements such as curb and gutter, stone curb, Mill to depth necessary to remove the OGFC (up to 1-inch).
Furnish and place micro surfacing in accordance with Section 409.
Limit work to the footprint of the existing pavement.
chip sealing, micro surfacing and mill and overlay.
Refer to the Pavement Summary sheets for area and extent of
-inch NMSA, <0.3 Million ESAL (PG 64-22)8 inch Asphalt Concrete Pavement, Gyratory Mix, -8
(See Note 3) and gutter or walkway
Existing concrete curb
Chip seal, type 2B
Micro surfacing, type 2
Existing asphalt concrete pavement
DETAIL B
ROADWAYS AND PARKING AREAS
ROADWAYS AND PARKING AREAS
MILL AND OVERLAY
ASPHALT CONCRETE PAVEMENT
ROADWAYS AND PARKING AREAS
Asphalt pavement milling. See Note 3.
Sheet 1 of 2
TYPICAL SECTIONS
:2
S e p te m b e r
B
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\B
-B
N
P S
E R
P M
S F
Y
(1 ty p .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) B01
NOTES:
A
C
12"
V a r ie s
L Road
Pavement Distress to distress
Patch saw cut parallel/perpendicular
Pavement replacement limits to edge of pavement of pavement, remove
<24" from the edge
If the patch limit is
PLAN VIEW
ASPHALT PAVEMENT PATCH
m in
Tack coat
Varies
6"
Existing Ground
Limit of Undercut
Existing Pavement face full depth
Saw cut vertical
Asphalt concrete pavement, Type 1
FULL DEPTH PATCH, TYPE 1
ASPHALT PAVEMENT, BASE, AND SUBGRADE
SECTION A-A
pavement (typ.)
Existing asphalt concrete full depth (typ.)
Saw cut vertical face subbase, or subgrade
Remove pavement to expose
Tack coat (typ.)
3' min.
Varies
SECTION A-A
Apply tack coat between asphalt lifts)
(Match depth of existing asphalt
Asphalt concrete pavement, Type 2
Minor Crushed Aggregate
Backfill with min. 6"
Apply tack coat between asphalt lifts
Place in 2 equal lifts, min.
thickness if the existing pavement is less.
(Match depth of existing asphalt) or 4" min.
and subgrade a min. of 10"
Remove the pavement base
FULL DEPTH PATCH, TYPE 2
ASPHALT PAVEMENT
as directed by the CO and in accordance with Section 609.
8. Replace wheelstops damaged due to existing age and condition to the Government.
damaged during construction operations at no additional cost during removal, storage, and replacement. Replace wheelstops
7. Take reasonable precautions to prevent damage to wheelstops and E634-05 as directed by the CO.
and replace pavement markings according to Details E634-01 deleterious materials prior to the micro surfacing. Place micro surfacing
6. Remove thermoplastic pavement markings and other as approved by the CO after paving is completed.
wheelstops or place new wheelstops if previously damaged is applied to the entire parking area. Reset existing the area to be treated to ensure the micro surfacing
5. Remove wheelstops and clean debris located within
4. Perform asphalt pavement patching prior to applying micro surfacing overspray during micro surfacing.
and flagstone crosswalk on Tour Route from asphalt islands, manholes, cemetery gates and pillars, walkways, stone curb, stone walls, concrete, barriers, concrete
3. Protect roadside elements such as curb and gutter, with Section 409.
2. Furnish and place micro surfacing in accordance of the existing pavement.
extent of micro surfacing. Limit work to the footprint
1. Refer to the Pavement Summary sheets for area and
(See Typical Sections, Sheet 1 of 2) micro surfacing, type 2, or cape seal
Asphalt concrete pavement, (See Typical Sections, Sheet 1 of 2) micro surfacing, type 2, or cape seal
Asphalt concrete pavement, Tack coat (typ.)
Type 2, 2-inch depth
Asphalt concrete pavement, min. = ½ lane width
Pay limits of patching area
PARTIAL DEPTH PATCH,TYPE 3
ASPHALT PAVEMENT
pavement
Existing asphalt concrete
Existing aggregate base pavement (mill), 2-inch depth
Remove existing asphalt concrete
Geotextile, class 2, type E pavement
Saw cut existing
SECTION A-A
Sheet 1 of 2)
(See Typical Sections, Micro surfacing, type 2
TYPICAL SECTIONS
Sheet 2 of 2
12"
:5
S e p te m b e r
B
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\B -B
N
P S
E R
P M
S F
Y (1 ty p .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) B02
Sheet 1 of 2
SCHEDULE A SCHEDULE B
TABULATION OF QUANTITIES
:3
S e p te m b e r
T a b u la ti o n o f Q u a n ti ti e s
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -C
N
P S
E R
P M
S F
Y (1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) C01
Sheet 2 of 2
SCHEDULE C SCHEDULE D
TABULATION OF QUANTITIES
:5
S e p te m b e r
T a b u la ti o n o f Q u a n ti ti e s
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -C
N
P S
E R
P M
S F
Y (1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) C02
Sheet 1 of 7
SUMMARIES AND SCHEDULES
:4
S e p te m b e r
S u m m a r ie s a n d S c h e d u le s
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -C
N
P S
E R
P M
S F
Y (1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) C03
Sheet 2 of 7
:5
S e p te m b e r
S u m m a r ie s a n d S c h e d u le s
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -C
N
P S
E R
P M
S F
Y (1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) C04
Sheet 3 of 7
S e p te m b e r
S u m m a r ie s a n d S c h e d u le s
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -C
N
P S
E R
P M
S F
Y (1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) C05
Sheet 4 of 7
S e p te m b e r
S u m m a r ie s a n d S c h e d u le s
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -C
N
P S
E R
P M
S F
Y (1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) C06
Sheet 5 of 7
S e p te m b e r
S u m m a r ie s a n d S c h e d u le s
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -C
N
P S
E R
P M
S F
Y (1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) C07
Sheet 6 of 7
S e p te m b e r
S u m m a r ie s a n d S c h e d u le s
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -C
N
P S
E R
P M
S F
Y (1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) C08
Sheet 7 of 7
:1
S e p te m b e r
S u m m a r ie s a n d S c h e d u le s
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\C -C
N
P S
E R
P M
S F
Y (1 q n t.
d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) C09
construction limits.
does not leave the project site. Perimeter controls include silt fence and other specified measures outside the
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
No new impervious surface will be created by the reconstructed roadway.
more than 1 acre will be disturbed, contact the Contracting Officer (CO) before any disturbance.
Soil disturbing activities are minimal in this project and do not exceed more than 1 acre. If micro surfacing, asphalt concrete patching, milling and overlay, pavement marking, and other miscellaneous work.
Everglade National Park in the Southeast Region. Work consists of crack cleaning and sealing, chip sealing, This project consists of the pavement preservation of 59.50 miles of roadway and parking areas within
Project Description
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
or clogged. Clean clogged inlet protection or replace clogged and damaged inlet protection as necessary.
Inlet Protection - Inspect to ensure that inlet protection remains firmly in place and is not damaged end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
Remove silt fence only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging
Install inlet protection prior to diverting water through inlets.
Do not allow ponded water to encroach into the travel lanes.
within 7 days. Apply permanent turf establishment to the finished slopes according to Section 625.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days erosion problems.
The CO may direct the installation of certain controls in order to forestall or mitigate potential or existing
Phase II Intermediate Controls
U.S. DEPARTMENT OF TRANSPORTATION
CONTROL NARRATIVE
EROSION AND SEDIMENT
:5
S e p te m b e r
M
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\M N
P S
E R
P M
S F
Y (1 e s .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) M01
Sheet 1 of 3
Place advance signing according to Detail ET 635-1.
Temporary Traffic Control Parking and Road Closures Sheet.
6. Perform full road and full parking area closures as shown in the
5. Mount and install all signs in accordance with Detail E635-01.
regulations.
4. Install traffic control in accordance with the MUTCD and local from the CO.
closures on more than one route at a time without prior approval
3. Do not perform road, shoulder, camping pad, or parking area
EVER-0920D, EVER-0920E, and EVER-0920F.
EVER-0215, EVER-0216, EVER-0920A, EVER-0920B, EVER-0920C,
for the following routes:EVER-0212, EVER-0213, EVER-0214,
2. Multiple closures are allowed simultaneously, as approved by CO, closures from the CO at least two weeks prior to closures.
1. Obtain approval for road, shoulder, camping pad, or parking area
TEMPORARY TRAFFIC CONTROL
:1
S e p te m b e r
N
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\N
-N
N
P S
E R
P M
S F
Y
(1 tc p .d g n
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) N01
Sheet 2 of 3
Place advance signing according to Detail ET 635-1.
Temporary Traffic Control Parking and Road Closures Sheet.
5. Perform full road and full parking area closures as shown in the
4. Mount and install all signs in accordance with Detail E635-01.
regulations.
3. Install traffic control in accordance with the MUTCD and local from the CO.
closures on more than one route at a time without prior approval
2. Do not perform road, shoulder, camping pad, or parking area closures from the CO at least two weeks prior to closures.
1. Obtain approval for road, shoulder, camping pad, or parking area
:5
S e p te m b e r
N
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\N
-N
N
P S
E R
P M
S F
Y
(1 tc p .d
SHEET
FL NP SER PMS FY21(1) N02
Sheet 3 of 3
Barricade Type 3 (typ.)
Varies
500'
500'
CLOSED
PARKING CLOSED
PARKING
(Mounted on Type 3 Barricade)
48"x30"
R11-2 (Modified)
(Mounted on Type 3 Barricade)
48"x30"
R11-2 (Modified)
AHEAD
CLOSED
PARKING
36"x36" W20-3 (Modified)
AHEAD
CLOSED
PARKING
36"x36" W20-3 (Modified)
TYPICAL PARKING AREA CLOSURE
Barricade Type 3 (typ.)
500' 500'
CLOSED
ROAD
(Mounted on Type 3 Barricade)
48"x30"
R11-2
AHEAD
CLOSED
ROAD
36"x36" W20-3
CLOSED
ROAD
(Mounted on Type 3 Barricade)
48"x30"
R11-2
AHEAD
CLOSED
ROAD
36"x36" W20-3 depending on width of the entrance or exit.
2. Number of barricades required may vary entrance and exit or as directed by the CO.
1. Place barricades across parking areas and roadways
TYPICAL ROAD CLOSURE
:0
S e p te m b e r
N
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\N
-N
N
P S
E R
P M
S F
Y
(1 tc p .d
SHEET
FL NP SER PMS FY21(1) N03
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD ROAD WORK
END
ROAD WORK
END
(EVER-0223)
Shark Valley Access Road
U.S. Highway 41
See Note 7
W16-8P
W20-1 over
NOTES:
sheeting types.
Refer to the Section 635 for allowable retroreflective 11.
approved by the CO.
State standards may be used as an alternative if 10.
has been obtained.
the client agency, verify that an encroachment permit
If signing on a roadway under a jurisdiction other than 9.
feet or in miles.
AHEAD" or may specify the distance to the work area in
The message on the W20-1 signs may be "ROAD WORK 8.
roads only).
on which the construction does occur (applies to major supplementary plaque indicating the name of the road which the actual construction work occurs, include a
If W20-1 is placed on a roadway other than that on 7.
applicable.
when not in use. Cover post-mounted signs when not
Do not store traffic control devices along the roadway 6.
crashworthiness.
meet the requirements of NCHRP-350 or MASH for
Ensure all sign supports exposed to impact by traffic 5.
recommended speed through the construction area.
warning signs as needed to indicate a maximum
Install advisory speed plates under the W20 series 4.
to fit the actual construction conditions.
Additional or different message signs may be required 3.
messages as required.
signs as determined by the CO for best results. Vary interfere with permanent signs, locate the warning
Where advance warning signs, placed as shown, 2.
construction work.
Erect all project advance warning signs before starting 1.
350' 350' 350'
G20-2
G20-2
See Note 7
W16-8P
W20-1 over
350'350'350'
U.S. DEPARTMENT OF TRANSPORTATION
TEMPORARY TRAFFIC CONTROL
WITH SHARK VALLEY ACCESS ROAD
U.S. HIGHWAY 41 INTERSECTION
© 2021 Microsoft Corporation © 2021 TomTom
:5
O c to b e r
E
V E
R
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\N N
P S
E R
P M
S F
Y (1 tt c .d g n
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) N04
NPS DRWG NO. EVER 160 177370 PEPC 101941 PMIS 317393, 318257
ACCESS ROAD
SHARK VALLEY
ACCESS ROAD
SHARK VALLEY
12" (typ.)
depth of 8" (min.)
2" x 2" wood frame
2" x 4" anchor (typ.)
2" x 4" weir
2" x 4" spacer (typ.)
2" x 4" wood frame
2" x 4" wood stud, used
SILT FENCE DROP INLET PROTECTION (TYPE A)
DROP INLET PROTECTION (TYPE B)
GRAVEL AND WIRE MESH
BLOCK AND GRAVEL DROP INLET PROTECTION (TYPE C)
BLOCK AND GRAVEL (TYPE D)
CURB INLET PROTECTION,
WOODEN WEIR (TYPE E)
CURB INLET PROTECTION,
SECTION A-A
SECTION B-B
SECTION C-C
water
Filtered
Overflow water
Filtered
Overflow
C
C
B
B
A A
Bury geotextile to a alternate weight
Sand bag or
Wire mesh
Wire mesh Concrete block
Wire mesh
Wire mesh
Wire mesh
Drop inlet with grate
Accumulated sediment
Sediment laden runoff
Filtered water
Curb inlet
Concrete block
Gravel filter
Accumulated sediment
Sediment laden runoff
Filtered water
Curb inlet
Curb inlet
Sandbag (typ.)
Wire mesh entire opening length)
Gravel (extends across
Wire mesh
Gravel filter
Gravel filter to retain concrete blocks
Geotextile
Frame
Drop inlet with grate
Gather excess at corners
Gravel filter
Sediment laden runoff
Accumulated sediment
Emergency overflow
ET 157-2A
NO SCALE
PROTECTION
TEMPORARY INLET
NOTES:
1.
inconvenience or damage.
ponding around the structure might cause are not expected. Do not use where locations where heavy concentrated flows
Use type B inlet protection only in sump locations only.
Use type A inlet protection in sump
-inch openings.2
- by 2
Use wire mesh with coarse aggregate.
For gravel filters, use 2- to 3-inch diameter
2.
4.
3.
FIBER ROLL INLET PROTECTION
set under drain inlet.
Non-woven filter fabricFl ow
FlowFlow
Fl ow
See Note 11 ends and 36" o.c. (typ.)
Gravel bag weights at
12" dia. (min.)
Fiber roll, min.
18" m in m a x
12" 18"
6'
2'-0"
2"
12" min.
Extend mesh below ground line
:2
S e p te m b e r
S
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S s t1
E
F L
T
E M
P .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
FL NP SER PMS FY21(1) S01
EFLHD DETAIL
K VALUE TABLE (ft/in)
30 35 40 45 50 55 60 65 70 75
30 32.5 35 37.5 40 42.5 45 47.5 50 52.5
* Use a K Value of 30 for speeds less than 30 MPH.
K
(MPH) *
POSTED SPEED
NOTE:
2 inches x 42.5 ft./in. = 85 feet.
Then the minimum transition length =
Effective overlay thickness = 2 inches
If the posted speed is 55 MPH
Example :
(Minimum transition length=30 feet) applies), to obtain the transition length.
Use K*[e1-e2]=T, or K*[d1-d2]=T (whichever the posted speed of the roadway.
elevations) by the K value from the Table for
(difference between the existing and overlaid the effective overlay thickness in inches less than the value obtained by multiplying
Provide a transition length in feet that is not
E401-01
NO SCALE
Existing asphalt pavement
Existing base course
New asphalt pavement
New base course
Existing asphalt pavement
Existing base course
Remove pavement (mill)
NEW PAVEMENT
(Final course)
Asphalt overlay
(Depth equals overlay thickness)
Saw cut
Existing elevation (e2)
Overlaid elevation (e1)
(Full depth of existing asphalt pavement Saw cut
K Transition length variable (See table)
(for table e - e = effective overlay thickness)
OVERLAY
d
Existing asphalt pavement
Existing base course d1
OVERLAY - DEPTH TRANSITIONS
(depth 2)
Asphalt overlay
(depth 1)
Asphalt overlay
K Transition length (Variable, see Table)
(for Table, d - d = effective overlay thickness)
1 PAVEMENT TRANSITIONS
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: FEBRUARY 2013
:5
S e p te m b e r
S h e t
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S s t4 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S02
CRACK SEALING AND FILLING
CRACK SEALING CRACK FILLING
from the existing surface
Squeegee excess material
1" and greater
See Note 3
Less than 1"
Seal crack with hot applied crack sealant
" below existing surface 4 " to8
Fill crack with hot applied crack filler to below existing surface " 4
" to8
Screed material to
ASPHALT PAVEMENT
CRACK SEALING AND FILLING
E414-01A
NO SCALE
NOTES:
4.
3.
2.
1.
Do not overband cracks.
filling material left above the surface.
Squeegee excess crack sealing and crack width.
See Subsection 414.06 for minimum to ensure adhesion to existing surface.
Force crack repair material into cracks sealing and filling cracks.
manufacturer's recommendations for according to Section 414. Follow
Prepare cracks for sealing and filling
:5
S e p te m b e r
S
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S s t4
A c ra c k s e a li n g
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S03
"R2
"R8
1" Grout
" Sealant 2
PLAN VIEW
SECTION B-B SECTION A-A
See Note 3
Steel rod
1" R
"4 surface
Pavement
See Note 4
#4 Reinforcing steel (typ.)
" (typ.)16 72 A
A
BB
1' 1'
" (typ.)2
" (typ.)2
PLAN VIEW
C
C
SECTION C-C
Formed hole for pin (typ.)
Formed hole for pin (typ.)
Formed hole for pin (typ.)
" Sealant 2
1" Grout
See Note 3
Steel rod
"R8
1" R surface
Pavement
"R2
2" "8
"4
"4
2"
"8
4"
See Note 4
#4 Reinforcing steel (typ.)
"8
Wheelstop
W h e e lsto p
Varies obstructions as directed by the CO.
* Increase distance for wall or other
"2
HEAD-ON PARKING
ANGULAR PARKING
Edge of pavement
WHEELSTOP LAYOUT
CONCRETE WHEELSTOP WITH DRAIN
CONCRETE WHEELSTOP WITHOUT DRAIN
Stall lines
Stall lines
6" (min.)*
Edge of pavement
CONCRETE WHEELSTOP
NOTES:
3.
2.
1.
1 inch of ends of wheelstop.
Extend the reinforcing steel to within
Subsection 609.08.
-inch steel rods according to 4 steel or
Pin the wheelstops with No. 6 reinforcing the approval of the CO.
to meet manufacturer's standards with
Variations in wheelstops will be allowed perpendicular to stall lines.
Center wheelstops between and
"4
E609-03
4.
1' (typ.)
6' - 7'
1' 1'-6"1'1'-6"
6' - 7'
' - 7
1' 1'1'-6" (typ.)
6' - 7'
6' - 7'
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
:5
S e p te m b e r
S h e
P R
O J E
C T
S \n p s s e r \p m s f y
\H
W Y
D
E S
\C A
D D
\S td
D e t\
S s t6 c o n c r e te w h e e ls to p
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S04
DETAIL
SYMBOLS AND WORDS
PAVEMENT MARKINGS
E634-01
TURN ARROW SYMBOLSTRAIGHT ARROW SYMBOL
COMBINATION SYMBOL
STRAIGHT/TURN ARROW
TRIANGLE SYMBOL
YIELD AHEAD
See Note 3
Blue background
ACCESSIBILITY SYMBOL
See Note 3
White border
(typ
R 6"
(typ.)
TYPE
PAVEMENT MARKING AREAS
SQFT
See Note 3
Accessibility symbol
"STOP" WORD MESSAGE "YIELD" WORD MESSAGE
"ONLY" WORD MESSAGE
"AHEAD" WORD MESSAGE "SCHOOL" WORD MESSAGE
"YIELD" Word Message Marking
"STOP" Word Message Marking
"SCHOOL" Word Message Marking
"ONLY" Word Message Marking
"AHEAD" Word Message Marking
Yield Ahead Triangle Symbol (V≥45 mph)
Yield Ahead Triangle Symbol (V<45 mph)
Turn Arrow Symbol
Straight/Turn Arrow Combination Symbol
Straight Arrow Symbol w/ Symbol, blue background, and white border w/ Symbol and blue background w/ Symbol only
Accessibility Symbol:
NO SCALE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
DETAIL APPROVED FOR USE
NOTES:
3.
2.
1.
and white border
(c) w/ Symbol, blue background, background; or
(b) w/ Symbol and blue
(a) w/ Symbol only;
following configurations:
otherwise by the CO in one of the as indicated in the plans or directed Provide Accessibility Symbol marking edition.
"Standard Highway Signs", latest symbols in accordance with the Place all letters, numerals, and
Devices'' (MUTCD), latest edition.
''Manual on Uniform Traffic Control markings in accordance with the Place pavement word and symbol
14"12"14"
12"30"30"
33"
27"
R
12"30"30"
33"
R
R
27"
8"
6'
(V
M
P H
(V
M
P H
(V
M
P H
(V
M
P H
4" (typ.)
4" (min.)
7'
6'
(t y p
8'
(t y p
4" (min.)
4" (typ.)
(m in
24" (min.)
3" (min.)9" R
3"R
3"R
3"R
6'-9"
9'-9"
3'-9" (typ.)
:5
S e p te m b e r
S h e
P
R O
J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\ S s t6 p a v e m e n tm a rk in g s y m b o ls
.d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S05
SYMBOLS AND WORDS
PAVEMENT MARKINGS
E634-01A
TYPE
PAVEMENT MARKING AREAS
22.8
26.5
SQFT
"EV CHARGING ONLY" Word Message
Helicopter Symbol
Electric Vehicle Symbol
NO SCALE
NOTES:
edition.
"Standard Highway Signs", latest symbols in accordance with the
Place all letters, numerals, and 2.
Devices'' (MUTCD), latest edition.
''Manual on Uniform Traffic Control markings in accordance with the
Place pavement word and symbol 1.
.6
.6
HELICOPTER SYMBOL
"EV CHARGING ONLY" WORD MESSAGE
ELECTRIC VEHICLE SYMBOL
36"
.5
36"
(typ.)
10"
8.5'
"3
"2
12" ty p ty p
:2
S e p te m b e r
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S s t6
A d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S06
4" 4"
.4
.3
9.25"
.7
.7
.7
9.25"
A
A A
A
SECTION A-A
Reflective material
NON-REFLECTIVE BI-DIRECTIONAL MONO-DIRECTIONAL
BI-DIRECTIONAL MONO-DIRECTIONAL
NON-PLOWABLE PAVEMENT MARKERS
PLOWABLE PAVEMENT MARKERS
NOTES:
same as the reflector.
one color or a combination of colors the
Ensure the shell of the marker is made of specified.
clear (white), yellow or red colors as
Furnish reflective markers with either
2.
1.
LEGEND:
RAISED PAVEMENT MARKERS
E634-02
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011NO SCALE
:2
S e p te m b e r
S h e
P R
O J E
C T
S \n p s s e r \p m s f y \H
W Y
D
E S
\C A
D D
\S td
D e t\
S s t6 r a is e d p a v m e n t m a r k in g s .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S07
Single Solid White Striping (edge striping) Single Solid White Striping (edge striping) broken white striping 4" wide
Raised Pavement Markers (typ.)
Double Solid Yellow Striping (centerline)
N
2N or less
N
Double Solid Yellow Striping (centerline) broken white striping
4" wide
Solid Yellow Striping
Single Solid White Striping (edge striping)
Single Solid Yellow Striping
N
See View A
(See Notes 2 and 3)
Raised Pavement Marker
10' 30' 10' 30'
Edge of pavement (typ.)
broken yellow striping
4" wide
3'
10' 30'
N
Edge of pavement (typ.)
broken yellow striping 4" wide
4" wide dotted white striping
10' 30'
N
3'
M
M
N
9'
9'
DOUBLE SOLID YELLOW STRIPING
BROKEN SINGLE WHITE AND
WITH RAISED PAVEMENT MARKERS
DOUBLE SOLID YELLOW STRIPING
BROKEN SINGLE WHITE AND
WITH RAISED PAVEMENT MARKERS
DOTTED WHITE STRIPING
BROKEN SINGLE YELLOW AND
DOTTED WHITE STRIPING
BROKEN SINGLE YELLOW AND
VIEW A
WITH RAISED PAVEMENT MARKERS
SINGLE SOLID YELLOW STRIPING
NOTES:
required, see Detail E634-02.
When raised pavement markers are
Detail or as directed by the CO.
with the MUTCD and as shown in this required, space and install in accordance
When raised pavement markers are
Devices (MUTCD), Latest Edition.
Manual on Uniform Traffic Control
Install striping in accordance with the
3.
2.
1.
Raised Pavement Markers (typ.)
Markers (typ.)
Raised Pavement
4" wide dotted white striping
RAISED PAVEMENT MARKERS
WITH AND WITHOUT
PAVEMENT MARKINGS
E634-03
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2019
APPROVED: MAY 2011NO SCALE
:0
S e p te m b e r
S h e
P R
O J E
C T
S \n p s s e r \p m s f y
\H
W Y
D
E S
\C A
D D
\S td
D e t\
S s t6 p a v e m e n tm a r k in g s .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S08
12" solid white striping
8" solid white striping
12" solid white striping
8" solid white striping
Edge of roadway
45°
4" double solid yellow striping
45°
White or yellow striping
2"
DETAIL A
45°
20' (t yp.)
10' (t yp.)
10' (t yp.)
20' (t yp.)
20' (typ.)
10' (typ.)
12" solid yellow striping
NOTES:NOTES:
See Note 3
Raised pavement marker (RPM)
See Detail A mono-directional, white (typ.)
Raised pavement marker, ty p
See Detail A mono-directional, white (typ.)
Raised pavement marker, 2.
1.
by the CO.
when specified in the plans or as directed shown. Use wider pavement markings
Typical pavement marking widths are
MUTCD, latest edition.
Install striping in accordance with the
See Detail A, and Note 4 bi-directional, red and yellow (typ.)
Raised pavement marker
ONE-WAY TRAFFIC, LANE SHIFT
ONE-WAY TWO-LANE TRAFFIC, LANES SEPARATE
TWO-WAY TWO-LANE TRAFFIC, LANES SEPARATE
RAISED PAVEMENT MARKERS
IN NEUTRAL AREAS WITH
PAVEMENT MARKINGS
DETAIL APPROVED FOR USE
5.
3.
the opposing traffic.
flow and the red reflective side is facing yellow reflective side is facing the traffic
Install bi-directional RPMs so that the
RPMs. See Detail E634-02 for RPM details.
same positioning applies to non-plowable
Detail A shows plowable RPM only; the by the CO.
latest edition, and as shown or as directed
(RPMs) in accordance with the MUTCD, Space and install raised pavement markers
REVISED: SEPTEMBER 2020
APPROVED: MARCH 2015NO SCALE
E634-04
:0
S e p te m b e r
S h e e t_ w it h
R
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S s t6 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S09
R7-8
R7-8P
R7-8
R7-8P
R7-8
R7-8
R7-8P
R7-8
R7-8
R7-8P
R7-8
R7-8P
R7-8
RESERVED
PARKING
ACCESSIBLE
VAN
RESERVED
PARKING
ACCESSIBLE
VAN
PARKING
RESERVED
ACCESSIBLE
VAN
RESERVED
PARKING
PARKING
ACCESSIBLE
VAN
RESERVED
PARKING
ACCESSIBLE
VAN
RESERVED
PARKING
RESERVED
RESERVED
PARKING
45 60 75 90 o o o o
25' 22' 20' 18.5'
9.3' 9.0'
CHART B
A A
NO SCALE
SINGLE PARKING SPACE
HEAD-ON PARKING WITH VAN ACCESSIBLE AISLE
DOUBLE PARKING SPACE
ANGULAR PARKING WITH VAN ACCESSIBLE AISLE
DOUBLE PARKING SPACESINGLE PARKING SPACE
See Note 3
Install perpendicular curb ramp
" (typ
" (typ
(t yp
(t yp
See Note 3
Install perpendicular curb ramp
See Note 3
Install perpendicular curb ramp
Van accessible aisle
HEAD-ON PARKING ANGULAR PARKING
5' (min.)
See Note 2
Wheelstop (typ.)
See Note 2
Wheelstop (typ.)
See Note 2
Wheelstop
S e e N o te
W h e e lsto p
' (m in
B
5' (min.)
11' (min.) 9' (min.)
2' (typ.)
6'' (min.)
S e e N o te
W h e e lsto p
See Note 2
Wheelstop
See Note 6 space symbol (typ.)
Accessibility parking
.5
NOTES:
SIGNING IN PARKING AREAS
PAVEMENT MARKINGS AND
Top of existing ground striping (typ.)
4" solid white
4" solid white striping (typ.)
striping (typ.)
4" solid white striping (typ.)
4" solid white
Sign post (typ.)
SIGN MOUNTING
H e ig h t*
* See Notes 4 and 5
6.
5.
4.
3.
2.
1.
Mounting view
See Sign
Mounting view
See Sign
Mounting view
See Sign
CHART A
Spaces
Van-Accessible
Minimum Number of
1 to 25
26 to 50
51 to 75
76 to 100
101 to 150
151 to 200
201 to 300
301 to 400
401 to 500
501 to 1,000 Spaces
2% of Total Parking
Over 1,000 100 over 1,000
20 Plus 1 for each
Accessible Spaces
One out of every 6
Accessible Spaces
One out of every 6 of Accessible Spaces
Minimum Number
Angle (A)
Minimum Length of Stall (B)
Stall Width (C), Parallel to Aisle 12.7' 10.4'
11' (min.)
in Parking Facility
Total Parking Spaces
MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES*
Special Report 125 (Figure 6.2)".
* Chart B based on dimensions recommended in "Parking Principles, and "2015 ABA Standards (Table F208.2)".
Accessible Design Standard (Table 208.02)"
* Chart A based on "2010 ADA Standards for
5' (min.) walkway5' (min.) walkway
PARKING LAYOUT DIMENSIONS FOR 9-FOOT STALLS*
S e e N o te s p a c e s y m b o l
A c c e s s ib il it y p a r k in
See Note 6 space symbol
Accessibility parking
' (m in
Van accessible aisle
See Note 3
Install perpendicular curb ramp
4" solid white striping (typ.)
See Note 6 space symbol (typ.)
Accessibility parking parking space symbol details.
Refer to Detail E634-01 for accessibility additional sign mounting information.
Refer to Section 2A.18 of the MUTCD for height of 7 feet.
residential areas, provide a minimum sings installed in business, commercial, or provide a minimum height of 5 feet. For details. For signs installed in rural areas, Refer to Detail E633-01 for sign mounting for curb ramps details.
and the walkway. Refer to Detail ET 615-1 is located between the van accessible aisle
Install perpendicular curb ramp when curb recommendations.
according to the manufacturer's plastic and other types of wheelstops
Section 609 and Detail E609-02. Install
Install concrete wheelstops according to edition.
Streets and Highways" (MUTCD), latest on Uniform Traffic Control Devices for markings in accordance with the "Manual
Install pavement striping and symbol
Van accessible aisle
Van accessible aisle m in w a lk w a y
5' (min.) walkway
B
(typ.)
6" (min.)
Mounting view
See Sign
Mounting view
See Sign
Mounting view
See Sign
A
90 90
A
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
DETAIL APPROVED FOR USE
E634-05
B '-7
'-7
6'-7' 6'-7' 6'-7'
6'-7'
C
9'
.5
B
'-7
'-7
.5
See Chart B See Chart B See Chart B
:2
S e p te m b e r
S h e
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S s t6 d e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S10
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS (LNFT)
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
See Note 10
W20-1
See Note 10
W20-1
G20-2
Expressway / Freeway
ET 635-1
NO SCALE
NOTES:
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
sheeting types.
Refer to the Section 635 for allowable retroreflective approved by the CO.
State standards may be used as an alternative if has been obtained.
the client agency, verify that an encroachment permit
If signing on a roadway under a jurisdiction other than mile.
the distance on the G20-1 sign to the nearest whole install G20-1 signs at each end of the project. Show
For work zones that are 2 miles or more in length, Spacing Table.
two W20-1 signs "B" feet apart according to the Sign approach speeds exceed 50 MPH. When used place the feet or in miles. Install an additional W20-1 sign when
AHEAD" or may specify the distance to the work area in
The message on the W20-1 signs may be "ROAD WORK roads only).
on which the construction does occur (applies to major supplementary plaque indicating the name of the road which the actual construction work occurs, include a
If W20-1 is placed on a roadway other than that on applicable.
when not in use. Cover post-mounted signs when not
Do not store traffic control devices along the roadway except as approved by the CO.
Maintain two-way traffic during all non-work hours crashworthiness.
meet the requirements of NCHRP-350 or MASH for
Ensure all sign supports exposed to impact by traffic recommended speed through the construction area.
warning signs as needed to indicate a maximum
Install advisory speed plates under the W20 series to fit the actual construction conditions.
Additional or different message signs may be required messages as required.
signs as determined by the CO for best results. Vary interfere with permanent signs, locate the warning
Where advance warning signs, placed as shown, necessary to accommodate actual operations.
information and details in this traffic control plan as sheets may be applicable to this project. Add or delete
Not all details shown on the temporary traffic control construction work.
Erect all project advance warning signs before starting
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
(optional) W13-1P
(optional) W13-1P xx
MPH
xx
MPH
A
B
C
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
C
B as de ter mi ne d b y t he C
O
Wor k z on e A re a o f I nfl ue nc
Pr oje ct Lim its
A
A
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
A
A
REVISED: 6/2014 3/2016 9/2019 9/2020
STANDARD APPROVED FOR USE 6/2005
:2
S e p te m b e r
S h e
P
R O
J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\ S s t6
E
F L a d v w a rn in g s ig n s .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S11
SPECIAL SIGN
E635-A
NOTE:
UniGuide.according to the National Park ServiceFabricate signs using text, color and size
NO SCALE
UniGuide.
according to the National Park Service
Fabricate signs using text, color and size
NO SCALE
:0
S e p te m b e r
S
P R
O J E
C T
S \n p s s e r\ p m s fy
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S s t6
A tt c s p e c ia ls ig n .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S12
PORTABLE SIGNS
FIXED ROADWAY SIGNS
RURAL AREA URBAN AREA
BREAKAWAY SIGN SUPPORT
4'' x 4''
4'' x 6''
6'' x 6''
6'' x 8''
1.5''
3''
2''
None Required
D
4'
4'
5'
5'
10 20
1 Post 2 Post 3 Post 4 Post
165125
Sign panel
Traffic
Wood post (Fixed)
Holes (See Table) m in m in
Roadway m in
Roadway m in
D
D m in
D
Roadway
Sidewalk D m in
6' to 12'
D m in
(See Notes 3 and 4)
POST SIZE
DIAMETER
HOLE (SQFT)
MAXIMUM SIGN AREA
POST SIZE TABLE
(min.)
6'-0''
(min.)
2'-0''
(min.)
2'-0''
NOTES:
7.
6.
5.
4.
3.
2.
1.
apart.
cannot be spaced a minimum of 7 feet multiple posts are required and the posts posts are considered non-breakaway if
Signs requiring 6- by 6-inch and greater non-breakaway signs.
Do not place holes in posts of the clearzone or shield with a barrier.
to post spacing, place the sign outside breakaway design cannot be used due the Breakaway Sign Support View. If
For 4- by 6-inch and greater posts, see sign mounting.
Company, utility poles may be used for
When approved by the CO and the Utility
7 feet above the pavement surface.
of the sign, mount the sign a minimum of
When parking is permitted within 200 feet
NCHRP Report 350 for crashworthiness.
sign supports meet the requirements of the approved by the CO. Ensure all portable mounted lower than fixed signs when vertical plane. Portable signs may be
Ensure sign mounts hold the sign face in a
Submit alternate details for portable signs.
All lumber dimensions are nominal.
larger than 10 square feet on double posts.
Mount signs that are wider than 3 feet or
(See Notes 6 and 7)
FIXED SIGNS 4'' X 6'' AND GREATER POSTS)(
E635-01
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011NO SCALE
SIGN MOUNTING
TEMPORARY TRAFFIC CONTROL
ROAD
AHEAD
WORK
DETOUR
AHEAD
M PH.. .
M PH.. .
ROAD
CLOSED
DETOUR
M PH.. .
CLOSED
AHEAD
LANE
RIGHT
:1
S e p te m b e r
S h e
P R
O J E
C T
S \n p s s e r \p m s f y \H
W Y
D
E S
\C A
D D
\S td
D e t\
S s t6 tt c s ig n m o u n ti n g .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
FL NP SER PMS FY21(1) S13
4" Broken yellow
4" Broken yellow
4" Solid double
4" Solid double
4" Broken yellow and
Curves < 500' Radius Tangents or Curves ≥ 500' Radius
4" Broken yellow centerline
DETAIL A DETAIL B
Two-way traffic Passing zone both directions
DETAIL B1
Two-way traffic Passing zone both directions
DETAIL A1
Two-way traffic No passing zone one direction
DETAIL A2
Two-way traffic No Passing zone one direction
DETAIL B2
Two-way traffic No passing zone both directions
DETAIL A3
Two-way traffic No Passing zone both directions
DETAIL B3
yellow centerline
Shoulder
Shoulder and solid yellow centerline
Shoulder yellow centerline
Shoulder yellow centerline solid yellow centerline
Shoulder
Shoulder
NOTES:
3.
2.
1.
period.
as an alternate for the full 14 day temporary marking For ADT of 1000 or less, Detail ET 635-3 may be used or less, Detail ET 635-3 may be used as an alternate.
For ADT of greater than 1000 and periods of 3 days by side, spaced on…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .