Results of Bid Oepning - TX FTFW SAMA 10(1).pdf

PDF 108 KB Posted

Attached to
San Marcos Aquatic Resources Center - Rehabilitation and Realignment of the Entrance Road
Solicitation number
693C73-21-B-000019
Issued by

View the file

Other files

File Type Posted
Amendment 0001 - TX FTFW SAMA 10(1).pdf PDF
VETS-4212 Form.pdf PDF
NEPA_CE.pdf PDF
Authorization to Construct an On-Site Sewage Facility.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
FP14_Eng.pdf PDF
SWPPP.pdf PDF
Plans - TX FTFW SAMA 10(1).pdf PDF
Final Pavement Report.pdf PDF
Plans - City of San Marcos.pdf PDF
IFB Solicitiation - TX FTFW SAMA 10(1).pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration Eastern Federal Lands Highway Division

Bid Opening for

San Marcos Aquatic Resources Center

REHABILITATION AND REALIGNMENT

OF ENTRANCE ROAD (RTE 10)

PROJECT: TX FTFW SAMA 10(1)

SOLICITATION No. 693C73-21-B-000019

September 14, 2021 at 2:00 p.m. EST Ashburn, Virginia

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION No. 693C73-21-B-000019 Project: TX FTFW SAMA 10(1) September 14, 2021, 2:00 p.m. EST

BIDDER’S BID TOTALS TOTAL PRICE

Construction Solutions Group SCHEDULE A $1,481,925.00

SCHEDULE A =

$1,481,925.00

Idea Contracting, LLC SCHEDULE A $1,261,693.00

SCHEDULE A =

$1,261,693.00

LaForge and Budd Construction Co., Inc.

SCHEDULE A

$2,246,225.00

SCHEDULE A =

$2,246,225.00

AR6 Construction & Engineering, LLC

SCHEDULE A

$1,657,905.36

SCHEDULE A =

$1,657,905.36

The performance period for the completion of Schedule A is 200 calendar days.

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION No. 693C73-21-B-000019 Project: TX FTFW SAMA 10(1) September 14, 2021, 2:00 p.m. EST

BIDDER’S BID TOTALS TOTAL PRICE

Montoya Anderson Construction, Inc. dba MAC, Inc.

SCHEDULE A

$1,509,645.00

SCHEDULE A =

$1,509,645.00

Alamo City Constructors, Inc. SCHEDULE A $1,790,545.90

SCHEDULE A =

$1,790,545.90

Engineer’s Estimate SCHEDULE A $1,580,000.00

SCHEDULE A =

$1,580,000.00

The performance period for the completion of Schedule A is 200 calendar days.

Slide Number 1
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION No. 693C73-21-B-000019� Project: TX FTFW SAMA 10(1)�September 14, 2021, 2:00 p.m. EST�
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION No. 693C73-21-B-000019� Project: TX FTFW SAMA 10(1)�September 14, 2021, 2:00 p.m. EST�

File details come from the government source that posted it. Updated .