Amendment 0002.pdf

PDF 230 KB Posted

Attached to
NATR Pavement Reconstruction and Safety Improvement
Solicitation number
693C73-20-R-000009
Issued by

About this file

This amendment provides responses to contractor questions regarding solicitation number 693C73-20-R-000009 for the NATR Pavement Reconstruction and Safety Improvement project on the Natchez Trace Parkway. The Eastern Federal Lands Highway Division seeks qualifications from offerors to reconstruct sections of pavement and improve safety on the parkway in Mississippi and Alabama. The response deadline remains April 10, 2020. The amendment clarifies that 11x17 paper and past performance questionnaires may be used and maintains professional engineering license requirements for key positions. Geotechnical engineers must be licensed in Mississippi or Alabama given soil conditions.

View the file

Other files

File Type Posted
Amendment 0001.pdf PDF
Past Performance Questionnaire.doc DOC document
REQUEST FOR QUALIFICATIONS NATR 2A18B7C6D113A17B9.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7320R000009 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

693C73

STERLING VA 20166-6511

21400 Ridgetop Circle

FHWA EASTERN FED LANDS DIVISION

Federal Highway Administration

693C73

STERLING VA 20166-6511

21400 RIDGETOP CIRCLE

FHWA EASTERN FED LANDS DIVISION

Federal Highway Administration

See Block 1003/11/20200002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/11/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: NP-NATR 2A18,B7,C6,D11,3A17,B9

The purpose of this amendment is to:

1. Formally address contractors' questions.

The proposal due date remains April 10, 2020 at 2:00 PM EST

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

TEL: EMAIL:

Amendment No. 0002 Page 2 of 3

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0002 Project: NP-NATR 2A18,B7,C6,D11,3A17,B9

NATCHEZ TRACE PARKWAY

Solicitation: 693C73-20-R-000009

The purpose of this Amendment is to:

1. Provide a summary of responses to questions/clarifications asked by potential contractors.

2. Request for Qualification due date has not changed and Statement of Qualifications are due April 10, 2020 at 2:00 PM EST.

Questions / Clarifications:

The following questions were submitted to Eastern Federal Lands Highway Division regarding the project named NP-NATR 2A18,B7,C6,D11,3A17,B9. The Government response or clarification is provided. The Government’s responses are as follow:

Question/Comment:

1. May we use 11”x17” paper for the organization chart?

2. Are the SF 330 Part IIs included in the 40-page count?

3. Are past performance questionnaires included in the 40-page count?

4. Can the PE requirement for the Quality Control Manager (QCM) position be waived?

5. Can the PE requirement for the Project Engineer position be waived?

6. Can the PTOE requirement for the Safety Engineer position be waived?

7. For the Geotechnical and Pavement Engineer position, will a PE from a state other than

MS or AL meet the criteria?

Government’s Response:

1. Yes

2. No

3. No

4. No

5. No

6. No

Amendment No. 0002 Page 3 of 3

7. No. Given all the bad soil in Mississippi, it is desire to have PE in Mississippi.

Offerors are reminded to submit any questions to eflhd.contracts@dot.gov. All questions should be submitted as early as possible so the proposal due date will not be delayed. Questions submitted within 3 days of the proposal due date have the potential of not being answered with enough time for offerors to finalize their proposals.