This document summarizes a bid opening for a federal construction contract solicitation. The solicitation is for the Kennedy Center Pedestrian/Bicycle Trail Project involving asphalt work, lighting, landscaping, tunnel construction and other site improvements. The work will be split into schedules with a total expected cost between $1 million to $5 million. Four contractors submitted bids by the July 14th deadline ranging from $6.2 million to $9.5 million. The engineer's estimate was $5 million. A pre-bid meeting was held and the contract will be awarded to a small business concern. The work must be completed within 430 days of award with separate schedules allowed. The soliciting agency is the Federal Highway Administration Eastern Federal Lands division.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
Kennedy Center Pedestrian/Bicycle Trail
PROJECT: NP JFK 1(2), NAMA 16(2), TRL (1)
SOLICITATION NO. 693C73-20-B-000018
July 14, 2020 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-20-B-000018 Project: NP JFK 1(2), NAMA 16(2), TRL (1)
July 14, 2020, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Asher Construction, Inc. SCHEDULE A
$6,226,824.50
OPTION 1
$430,000.00
SCHEDULE A + OPTION 1
$6,656,824.50
Milani Construction, LLC SCHEDULE A
$8,746,750.00
OPTION 1
$380,000.00
SCHEDULE A + OPTION 1
$9,126,750.00
Metro Paving Corporation SCHEDULE A
$8,324,862.00
OPTION 1
$357,385.00
SCHEDULE A + OPTION 1
$8,682,247.00
If the Government awards the contract as Schedules A + B, the performance period will be 430 calendar days.
If separate: Schedule A will be 430 calendar days and Schedule B will be 55 calendar days.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-20-B-000018 Project: NP JFK 1(2), NAMA 16(2), TRL (1)
July 14, 2020, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Terra Site Constructors, LLC SCHEDULE A
$9,133,141.81
OPTION 1
$357,883.94
SCHEDULE A + OPTION 1
$9,491,025.75
SCHEDULE A
OPTION 1
SCHEDULE A + OPTION 1
Engineer’s Estimate SCHEDULE A
$4,564,388.96
OPTION 1
$415,000.00
SCHEDULE A + OPTION 1
$4,979,388.96
If the Government awards the contract as Schedules A + B, the performance period will be 430 calendar days.
If separate: Schedule A will be 430 calendar days and Schedule B will be 55 calendar days.
| Slide Number 1 |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000018� Project: NP JFK 1(2), NAMA 16(2), TRL (1) �July 14, 2020, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000018� Project: NP JFK 1(2), NAMA 16(2), TRL (1) �July 14, 2020, 2:00 p.m. local time � |
File details come from the government source that posted it. Updated .