This document provides an amendment to a federal solicitation for construction services. The amendment revises specifications and plans for the Kennedy Center Pedestrian/Bicycle Trail project. Changes include updates to special contract requirements sections on materials, construction procedures, and performance standards. Replacement plan sheets add details for fencing, lighting, and tunnel construction. The bid schedule is amended to include an item for steel access doors. Responses to bidder questions are also summarized. The bid opening date of July 14, 2020 at 2:00 PM EST is confirmed. Eligible small businesses are invited to submit sealed bids by the specified due date in accordance with all procurement requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7320B000018 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
693C73
STERLING VA 20166-6511
21400 Ridgetop Circle
FHWA EASTERN FED LANDS DIVISION
Federal Highway Administration
693C73
STERLING VA 20166-6511
21400 RIDGETOP CIRCLE
FHWA EASTERN FED LANDS DIVISION
Federal Highway Administration
See Block 1407/09/20200003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/27/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project NP JFK1(2) NAMA16(2) TRL(1)
The purpose of this Amendment is to:
1) Revise the Special Contract Requirements (J Pages) as follows:
a) Revised Sections 101, 156, 552, 615, 620, 636, 637, 646, 703, and 725.
b) Added Section 721.
2) Replace plan sheets to add notes, revise callouts, and added new detail for wood stockade fence.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 29
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693C7320B000018/0003
3) Revise the Solicitation Bid Schedule (B Pages) to add new pay item for steel access door.
4) Provide a summary of responses to questions/clarifications asked by potential bidders.
5) Bid Opening date of July 14, 2020, at 2:00 p.m. EST remains unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment No. 0003
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
NP JFK1(2) NAMA16(2) TRL(1)
Kennedy Center Pedestrian Access Project Solicitation: 693C73-20-B-000018
The purpose of this Amendment is to:
1) Revise the Special Contract Requirements (J Pages) as follows:
a) Revised Sections 101, 156, 552, 615, 620, 636, 637, 646, 703, and 725.
b) Added Section 721.
2) Replace plan sheets to add notes, revise callouts, and added new detail for wood stockade fence.
3) Revise the Solicitation Bid Schedule (B Pages) to add new pay item for steel access door.
4) Provide a summary of responses to questions/clarifications asked by potential bidders.
5) Bid Opening date of July 14, 2020, at 2:00 p.m. EST remains unchanged.
B Pages changes
Delete the Solicitation Bid Schedule B Pages (B-1 thru B-10), and substitute the amended Bid Schedule B Pages (B-1 thru B-10).
Plans changes
1. Delete Plan Sheet A03 and substitute the amended Plan Sheet A03.
Revised call out for FHWA Field facilities location and optional contractor staging area.
2. Delete Plan Sheet C02 and substitute the amended Plan Sheet C02.
Added new pay item for steel access door.
3. Delete Plan Sheet H05 and substitute the amended Plan Sheet H05.
Added notes and revised callouts for Lighting Plan.
4. Added new Detail E619-A for wood stockade fence.
5. Delete Plan Sheet R02 and substitute the amended Plan Sheet R02.
Revised notes and added new notes to Pedestrian Tunnel Plan.
6. Delete Plan Sheet S35 and substitute the amended Plan Sheet S35.
Added notes for Detail E636-I (Daytime Tunnel Luminaire).
7. Delete Plan Sheet S40 and substitute the amended Plan Sheet S40.
Added notes and revised callouts for Detail E646-A (Bench and Railing).
Special Contract Requirements (J Pages) changes
1. Add the following to Subsection 101.04 of the Special Contract Requirement, page J-2:
Period of Performance – The period between the Award of the contract and the Final Acceptance of all contract work by the Government
2. Delete the Subsection 156.07(d) of the Special Contract Requirement, page J-13.
3. Delete the Subsection 552.14(c)(4) of the Special Contract Requirement, page J-27.
4. Delete the third material of Subsection 615.02 of the Special Contract Requirement, page J- 31, and substitute the following:
Aggregate for exposed aggregate concrete sidewalk 703.19
5. Add the following to Subsection 620.10 of the Special Contract Requirement, page J-35:
Replace existing concrete coping less than 5-inches depth with concrete coping a minimum of 5 inches depth.
6. Delete the Subsection 636.01 of the Special Contract Requirement, page J-42, and substitute the following:
This work includes the installation of traffic detector systems, and electrical panels for tunnel lighting.
7. Add the following to Subsection 636.02 of the Special Contract Requirement, page J-42:
Electrical Panel 721.01(d)
8. Add the following to Subsection 636.04 of the Special Contract Requirement, page J-42:
For electrical panel mounting, mount the panelboard and other equipment in a NEMA 3R painted steel enclosure, minimum dimension of 30 inches wide by 18 inches deep by 54 inches high. Mount the enclosure on a 3-foot deep concrete pad extending a minimum of 3 inches beyond the enclosure dimensions.
9. Add the following to Subsection 636.05 of the Special Contract Requirement, page J-43:
For Type B Fixtures, construct 1 ½ inch conduit from box to box. Construct 1/2 or ¾ inches conduit from the junction box to the luminaire, per manufacturer’s recommendation for conduit entry.
10. Delete the second paragraph of Subsection 637.02 of the Special Contract Requirement, page J-44, and substitute the following:
As an option the Contractor may locate the staging area adjacent to the Government field office and facilities. Submit a layout plan for the Government’s Field Office, parking area, entrance, stockade fence location, and any additional area at the Contractor’s request and approval, for a field office and any staging areas to be combined with Government’s area.
11. Add the following Subsection to the Special Contract Requirement, page J-44:
Material
637.02 Conform to the following Section and Subsections:
Concrete 601 Silt fence 713.16 Topsoil 713.01(a) Wood 710.04(a) Turf establishment 625
12. Add the following Subsection to the Special Contract Requirement, page J-44:
637.03. Perform maintenance of the Government’s project field office site and any contractor staging areas, as an optional staging area requested by the contractor, until final acceptance of the project. Provide the necessary equipment, materials, and personnel to perform the required maintenance activities. Pick up construction-related debris daily.
13. Add the following to Subsection 637.03(a) of the Special Contract Requirement, page J-44:
The contractor will require approval from the CO before using this location for staging. Conduct a precondition survey of the staging area site. Provide a staging plan detailing access, layout in relation to the Government's facilities, and protective fencing of the area for review and approval 14 days prior to mobilization.
At project completion, the contractor is required to remove all contractor's facilities and materials from the site, and restore to original condition upon removal at no cost to the Government.
Change the fence for the field office and parking lot shown in Table 637-1 to the stockade fence detail, and to be painted grey. Provide grey paint samples to the CO for review and approval prior to painting the fence. Extend the same fence type to include the contractor's optional staging area, if requested by the contractor and approved by the CO.
14. Add the following Subsection to the Special Contract Requirement, page J-46:
637.03(d) Staging Area. This applies to the Government Field Office site and parking area, and any additional areas for contractor field office and staging of materials at the option of the contractor, and approval by the CO. Construct a field office, parking area, and staging areas at the location and address shown in the plans and contract requirements of this Section. Coordinate the staging area location with other contractors using this site. Obtain approval from the CO for the final dimensions and layout of the field office, parking area, and staging
15. Delete the Subsection 646.01 of the Special Contract Requirement, page J-48, and substitute the following:
This work consists of furnishing, exterior security steel doors, aluminum railings fabricated from extruded aluminum sections, including aluminum railing posts and furnishing benches, including arm rest, seat back, and mounting hardware.
16. Add the following to Subsection 646.02 of the Special Contract Requirement, page J-48:
Aggregate for exposed aggregate concrete sidewalk 703.19
Exterior security steel door 725.21
17. Delete the last paragraph of Subsection 646.03 of the Special Contract Requirement, page J- 49, and substitute the following:
Perform work for reinforced concrete retaining wall and coping under Section 258.
18. Delete the Subsection 646.04(c) of the Special Contract Requirement, page J-49, and substitute the following:
(c) Shop drawings showing layout after field verification of wall elevations, concrete coping widths and thicknesses, dimensions of replacement coping, profiles, spacing of components, and anchorage and installation details.
19. Delete the fourth paragraph of Subsection 646.06(e) of the Special Contract Requirement, page J-51, and substitute the following:
Secure rails with standard stainless-steel bolts or concrete screws after posts have been set in footings.
20. Add the following to Subsection 646.10 of the Special Contract Requirement, page J-52:
Measure steel access door by the each, including all frame, hinges, locking mechanism, and incidental materials and labor necessary for complete installment.
21. Add the following to Subsection 703.19 of the Special Contract Requirement, page J-54:
Exposed aggregate concrete finished to match the sidewalk appearance at Constitution Garden – Lock Keeper’s House plaza at the corner of 17th and Constitution Avenues, or at National Mall at
12th Street. Submit 3-foot x 3-foot x 4-inch test panels for the CO’s review and approval of matching concrete/aggregate mix. Finish and cure panels in the same manner as each approved mix design will be at the job site.
22. Add the following Section 721 to the Special Contract Requirement, page J-60:
Section 721. — ELECTRIC AND ILLUMINATION MATERIAL
Add the following after Subsection 721.01(c):
For underdeck daytime luminaires provide cable wire from box to box as 3-#2 AWG and 1-#2 Ground in 1 ½ inch conduit. Provide cable wire from each junction box to the luminaire as 2- #10 AWG and 1-#10 Ground in ½ or ¾ inch per manufacturer’s recommendation for conduit entry.
Add the following after Subsection 721.01(d):
For the service panel provide a 100A, 120/240V, 1 phase, 3 wire split-bus panelboard with 100A Main Circuit Breaker and 30 spaces minimum:
(1) 6 space top section (24-hour)
i. 1 - 20A, 1P (Time Clock, Lighting Contractor, PEC)
(2) 100A contractor (6 spaces)
(3) 18 space bottom section (contractor controlled)
i. 1 – 60A, 2P (Circuit 6)
ii. 5 – 20A, 2P (Circuits 1,2,3,4,5)
Astronomical Time Clock with Reserve Power (controlling the lighting contractor) 120V Photoelectric Cell (controlling the lighting contractor). Provide a contractor controlled by the PEC (On) and Time Clock (Off).
Add the following after Subsection 721.02(f):
(4) Malleable iron splice boxes for type A, B, and C fixtures. Provide junction boxes 12 inch by 12 inch by 6 inch deep minimum.
23. Add the following to Subsection 725.21 of the Special Contract Requirement, page J-61:
725.21 Exterior Security Steel Door. Provide a hand right, exterior stainless steel security door with a 48- inch x 84-inch opening. Provide a full flush door meeting SDI (Steel Door Institute) Level 2 or higher requirements for the door, frame, and keyed locking mechanism. Stainless steel panels are to be 18 gage or better with 16 gage stainless steel frame. Provide a door with steel stiffened panels or other dent resistant core. Provide shop drawings showing how the doors will be constructed within the tunnel walls, and manufacturer's specifications for the door, frame, hinges, and locking mechanism, for the CO's review and approval, prior to construction of the pedestrian tunnel.
Door Color. Provide samples of a neutral color for the CO's review and approval prior to painting or ordering the doors.
B - 1
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A1020 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A1040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A1060 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A1080 15705-0100 SOIL EROSION CONTROL, SILT FENCE
104 LNFT $____________ $____________
A1100 15705-1500 SOIL EROSION CONTROL, COMPOST SOCK
2,780 LNFT $____________ $____________
A1120 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
27 EACH $____________ $____________
A1140 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT (STABILIZED
CONSTRUCTION ENTRANCE)
3 EACH $____________ $____________
A1160 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
A1180 20103-0000 CLEARING AND GRUBBING
5,700 SQYD $____________ $____________
A1200 20217-0000 TREE ROOT PRUNING
1,053 LNFT $____________ $____________
A1220 20220-1000 REMOVAL, INDIVIDUAL TREE (Under 10" DBH)
2 EACH $____________ $____________
A1240 20220-1000 REMOVAL, INDIVIDUAL TREE (40-45" DBH)
1 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP JFK1(2), NAMA 16(2), TRL(1) Project Name:Kennedy Center Ped/Bicycle Trail & Rehab Rock Creek & Potomac Pkwy
AMENDMENT NO. 3
B - 2
A1260 20220-1000 REMOVAL, INDIVIDUAL TREE (26-30" DBH)
2 EACH $____________ $____________
A1280 20220-1000 REMOVAL, INDIVIDUAL TREE (21-25" DBH)
5 EACH $____________ $____________
A1300 20220-1000 REMOVAL, INDIVIDUAL TREE (31-35" DBH)
1 EACH $____________ $____________
A1320 20220-1000 REMOVAL, INDIVIDUAL TREE (16-20" DBH)
3 EACH $____________ $____________
A1340 20301-1500 REMOVAL OF LIGHT POLE (Lighting)
24 EACH $____________ $____________
A1360 20301-3800 REMOVAL OF ELECTRICAL JUNCTION BOX
13 EACH $____________ $____________
A1380 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE
320 LNFT $____________ $____________
A1400 20302-2310 REMOVAL OF CABLE LINE
4,530 LNFT $____________ $____________
A1420 20303-1600 REMOVAL OF PAVEMENT, ASPHALT (6-INCH DEPTH)
1,150 SQYD $____________ $____________
A1440 20303-3000 REMOVAL OF SIDEWALK, ASPHALT (TRAILS)
4,730 SQYD $____________ $____________
A1460 20303-3200 REMOVAL OF SIDEWALK, CONCRETE
220 SQYD $____________ $____________
A1480 20401-0000 ROADWAY EXCAVATION (TRAILS AND BELVEDERE)
1,310 CUYD $____________ $____________
A1500 20402-0000 SUBEXCAVATION
300 CUYD $____________ $____________
A1520 20410-0000 SELECT BORROW (FOR PEDESTRIAN TUNNEL)
308 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP JFK1(2), NAMA 16(2), TRL(1)
B - 3
A1540 20441-0000 WASTE (CONTAMINATED SOIL)
491 CUYD $____________ $____________
A1560 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
5,638 SQYD $____________ $____________
A1580 20702-1000 GEOTEXTILE FILTER, CLASS 2, TYPE E (FOR PEDESTRIAN TUNNEL)
405 SQYD $____________ $____________
A1600 20704-0000 GEOMEMBRANE (IMPERMEABLE MEMBRANE,SWM)
45 SQYD $____________ $____________
A1620 25801-0000 REINFORCED CONCRETE RETAINING WALL (CONCRETE FOUNDATION
WALL FOR WOODEN BENCH)
1,280 SQFT $____________ $____________
A1640 30101-0000 AGGREGATE BASE (AGGREGATE BASE C or D)
700 TON $____________ $____________
A1660 30103-0000 AGGREGATE BASE (#57 STONE)
670 CUYD $____________ $____________
A1680 40101-0300 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 3 TO <30 MILLION ESAL
2,160 TON $____________ $____________
A1700 40101-0500 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
610 TON $____________ $____________
A1720 40101-0700 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 3 TO <30 MILLION ESAL
85 TON $____________ $____________
A1740 41201-0000 TACK COAT
6 TON $____________ $____________
A1760 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
19,500 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 4
A1780 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
635 SQYD $____________ $____________
A1800 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
222 CUYD $____________ $____________
A1820 55210-0000 PRECAST STRUCTURAL CONCRETE
75 CUYD $____________ $____________
A1840 55401-1000 REINFORCING STEEL
65,340 LB $____________ $____________
A1860 56003-0000 REMOVAL OF CONCRETE BY HYDRODEMOLITION
ALL LPSM $___LPSM_____ $____________
A1880 60103-4000 CONCRETE, FOUNDATION, LIGHT POLE
56 EACH $____________ $____________
A1900 60201-0600 18-INCH PIPE CULVERT
10 LNFT $____________ $____________
A1920 60403-1300 INLET, FLH TYPE 5A MODIFIED (GRATE INLET ALONG PARKWAY; MATCH
IN-KIND)
1 EACH $____________ $____________
A1940 60406-0000 INLET ADJUSTMENT
1 EACH $____________ $____________
A1960 60407-0000 CAPPING INLETS AND MANHOLES
1 EACH $____________ $____________
A1980 60411-0000 INLET MODIFICATION (PIPE SCREEN 12"-36")
5 EACH $____________ $____________
A2000 60413-0000 TRENCH DRAIN
12 LNFT $____________ $____________
A2020 60501-0000 STANDARD UNDERDRAIN SYSTEM
132 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 5
A2040 60510-0400 4-INCH OUTLET PIPE (FOR TRENCH DRAIN OUTFALL)
33 LNFT $____________ $____________
A2060 60703-0000 CLEANING CULVERTS IN PLACE
210 LNFT $____________ $____________
A2080 60706-0000 CLEANING DRAINAGE STRUCTURE (CLEANING INLETS)
20 EACH $____________ $____________
A2100 60901-3100 CURB, STONE, TYPE 1, 8-INCH DEPTH (STONE CURB TRANSITION TO 8")
20 LNFT $____________ $____________
A2120 60901-4000 CURB, STONE, TYPE 1, 16-INCH DEPTH (GRANITE CURB)
670 LNFT $____________ $____________
A2140 60911-0500 RECONDITION CURB (POWER WASH CURB)
13,600 LNFT $____________ $____________
A2160 61102-0450 3/4-INCH WATERLINE, POLYVINYL CHLORIDE (PVC) (RELOCATE OR
REPLACE IRRIGATION LINE)
1,000 LNFT $____________ $____________
A2180 61501-0100 SIDEWALK, CONCRETE
130 SQYD $____________ $____________
A2200 61501-0500 SIDEWALK, EXPOSED AGGREGATE CONCRETE
210 SQYD $____________ $____________
A2220 61501-1200 SIDEWALK, POROUS ASPHALT (SURFACE COURSE AND BASE COURSE
COMBINED)
3,780 SQYD $____________ $____________
A2240 61504-4000 ACCESSIBILITY RAMP, STONE
50 SQYD $____________ $____________
A2260 61506-2000 PAVING, COBBLESTONE
380 SQYD $____________ $____________
A2280 61508-0100 RESET COBBLESTONE PAVERS
1,120 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 6
A2300 61509-0000 DETECTABLE WARNING PANELS (GRANITE)
28 SQYD $____________ $____________
A2320 62002-0000 STONE MASONRY (FOR TUNNEL PORTAL)
82 SQYD $____________ $____________
A2340 62010-1000 STONE MASONRY GUARDWALL (RECONSTRUCT CONCRETE COPING)
2,000 LNFT $____________ $____________
A2360 62403-0000 FURNISHING AND PLACING TOPSOIL (6-INCH DEPTH)
176 CUYD $____________ $____________
A2380 62403-0000 FURNISHING AND PLACING TOPSOIL (4-INCH DEPTH)
407 CUYD $____________ $____________
A2400 62403-0000 FURNISHING AND PLACING TOPSOIL (12-INCH DEPTH, SUBSOIL)
352 CUYD $____________ $____________
A2420 62403-0000 FURNISHING AND PLACING TOPSOIL (2-INCH DEPTH)
5 CUYD $____________ $____________
A2440 62502-0000 TURF ESTABLISHMENT
5,219 SQYD $____________ $____________
A2460 62614-0250 NARCISSUS PSEUDONARCISSUS, DAFFODIL VARITY KING ALFRED, 12-INCH
TO 18-INCH HEIGHT, CONTAINER GROWN (DII BULB)
12,016 EACH $____________ $____________
A2480 62617-0550 QUERCUS PHELLOS, WILLOW OAK, 2-INCH TO 2 1/2-INCH CALIPER, BALLED
AND BURLAPPED (3-INCH TO 3 1/2-INCH CALIPER)
4 EACH $____________ $____________
A2500 62621-0100 ULMUS AMERICANA (WASHINGTON), AMERICAN ELM, 2-INCH TO 2 1/2-INCH
CALIPER, BALLED AND BURLAPPED (3-INCH TO 3 1/2-INCH CALIPER)
9 EACH $____________ $____________
A2520 63302-0000 SIGN SYSTEM (TYPE IX RETROREFLECTIVE SHEETING)
270 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 7
A2540 63302-0000 SIGN SYSTEM (WAYFINDING SIGNS)
117 SQFT $____________ $____________
A2560 63401-0000 PAVEMENT MARKINGS (PAVEMENT MARKINGS, TYPE D, DOTTED)
430 LNFT $____________ $____________
A2580 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID (SOLID PAVEMENT MARKINGS
INCLUDE WHITE SOLID 6", YELLOW SOLID 6", WHITE 12", WHITE 24")
25,740 LNFT $____________ $____________
A2600 63401-0800 PAVEMENT MARKINGS, TYPE D, BROKEN
13,130 LNFT $____________ $____________
A2620 63405-0050 PAVEMENT MARKINGS, SYMBOLS (PEDESTRAIN PAVEMENT BIKE AND
CROSSING SYMBOL)
3 EACH $____________ $____________
A2640 63405-1300 PAVEMENT MARKINGS, TYPE D, TURN ARROW
4 EACH $____________ $____________
A2660 63405-1450 PAVEMENT MARKINGS, TYPE D, "ONLY" WORD MESSAGE
2 EACH $____________ $____________
A2680 63502-0300 TEMPORARY TRAFFIC CONTROL, ARROW BOARD, TYPE C
2 EACH $____________ $____________
A2700 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
302 EACH $____________ $____________
A2720 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
3 EACH $____________ $____________
A2740 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
42 LNFT $____________ $____________
A2760 63503-0450 TEMPORARY TRAFFIC CONTROL, WATER-FILLED BARRIER
2,130 LNFT $____________ $____________
A2780 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
556 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 8
A2800 63503-0900 TEMPORARY TRAFFIC CONTROL, SNOW FENCE
1,226 LNFT $____________ $____________
A2820 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (FOR MAINTENANCE OF
TRAFFIC & LANDSCAPING)
6,943 LNFT $____________ $____________
A2840 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
801 SQFT $____________ $____________
A2860 63504-3000 TEMPORARY TRAFFIC CONTROL, STEEL PLATES (TEMPORARY TURF DECK)
2,454 SQFT $____________ $____________
A2880 63601-3000 SYSTEM INSTALLATION, ELECTRICAL (SERVICE PANELS & ENCLOSURE)
ALL LPSM $___LPSM_____ $____________
A2900 63603-0100 SYSTEM INSTALLATION, ELECTRICAL COMPANY COMPENSATION
ALL CTSM $___CTSM_____ $15,000.00
A2920 63610-1000 CONDUIT, 1 1/2-INCH, PVC
280 LNFT $____________ $____________
A2940 63610-1100 CONDUIT, 1 1/2-INCH, RIGID GALVANIZED STEEL
670 LNFT $____________ $____________
A2960 63610-2200 CONDUIT, 3-INCH, PVC
6,100 LNFT $____________ $____________
A2980 63610-2300 CONDUIT, 3-INCH, RIGID GALVANIZED STEEL
830 LNFT $____________ $____________
A3000 63611-0300 WIRE, ELECTRICAL CONDUCTORS, 10 AWG
1,620 LNFT $____________ $____________
A3020 63611-0300 WIRE, ELECTRICAL CONDUCTORS, 10 AWG (GROUNDWIRE)
830 LNFT $____________ $____________
A3040 63611-0800 WIRE, ELECTRICAL CONDUCTORS, 2 AWG (GROUNDWIRE)
7,700 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 9
A3060 63611-0800 WIRE, ELECTRICAL CONDUCTORS, 2 AWG
31,300 LNFT $____________ $____________
A3080 63612-0000 LUMINAIRE (TEARDROP LUMINAIRE)
4 EACH $____________ $____________
A3100 63612-0100 LUMINAIRE, TYPE A (515w DAYTIME UNDERDECK)
22 EACH $____________ $____________
A3120 63612-0200 LUMINAIRE, TYPE B (52w NIGHTTIME UNDERDECK)
4 EACH $____________ $____________
A3140 63612-0300 LUMINAIRE, TYPE C
16 EACH $____________ $____________
A3160 63612-0700 LUMINAIRE, GLOBE, TYPE TWIN 20 LIGHT STANDARD
110 EACH $____________ $____________
A3180 63620-0000 POLE (30' TEARDROP POLE)
1 EACH $____________ $____________
A3200 63620-0400 POLE, TYPE TWIN 20 LIGHT STANDARD
55 EACH $____________ $____________
A3220 63621-1000 UTILITY BOX, PULLBOX
7 EACH $____________ $____________
A3240 63621-3000 UTILITY BOX, JUNCTION BOX
69 EACH $____________ $____________
A3260 63621-3000 UTILITY BOX, JUNCTION BOX (SURFACE MOUNTED SPLICE BOX)
30 EACH $____________ $____________
A3280 63621-3000 UTILITY BOX, JUNCTION BOX (24X36 JUNCTION BOX)
2 EACH $____________ $____________
A3300 63640-0700 RELOCATE ELECTRICAL LINE (DDOT LIGHTING CONDUIT AND CABLE)
ALL LPSM $___LPSM_____ $____________
A3320 63701-0000 FIELD OFFICE
2 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 10
A3340 64501-0000 LOCATE UTILITIES
ALL LPSM $___LPSM_____ $____________
A3360 64502-0000 LOCATE UTILITIES (TEST PITS)
10 EACH $____________ $____________
A3380 64603-0000 FIXTURE (STEEL ACCESS DOOR)
2 EACH $____________ $____________
A3400 64604-3000 FIXTURE, PEDESTRIAN RAILING
1,986 LNFT $____________ $____________
A3420 64631-0000 ROADSIDE DEVELOPMENT (WOODEN BENCH)
850 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP JFK1(2), NAMA 16(2), TRL(1) Project Name:Kennedy Center Ped/Bicycle Trail & Rehab Rock Creek & Potomac Pkwy
AM
D.3
Questions / Clarifications
The following questions and issues were submitted to EFLHD at eflhd.conracts@dot.gov.
The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.
1. Referencing Detail on E646-A regarding Railing Section. The Standard detail states to remove 1’ by 1’ coping from face of wall. The condition where a concrete coping currently exists along the wall is not the entire way. A good portion of the project there is no concrete coping. It is masonry stone capped with a thin layer of concrete?
Response: Detail E646-A has been revised in this amendment.
2. When doing a site visit, it was observed that there are many wires/cables across location where new tunnel opening will be made. Please confirm what work is required of the contractor to relocate these cables and how it will be measured and paid.
Response: PEPCO is to relocate the wires/cables by a new conduit from an outside manhole to a new location inside the bridge abutment. This will not be work required by the contractor.
3. On Drawing A03 it indicates a staging area general location. What are the fence requirements for the staging area and what is measurement and payment?
Response: Plans and SCR’S have been revised in this amendment.
4. At the staging area, how will restoration (i.e. topsoil, seed, sod) of the area be measured and paid?
Response: SCR’s has been revised in this amendment.
5. Regarding the pedestrian tunnel for the Kennedy Center trail, can the entire tunnel be precast?
Response: The Federal Procurement Specifications (FP-14), on page 14 provides information related to Value Engineering proposals and acceptance requirements.
After the award of a contract and Notice to Proceed, the contractor can submit a value engineering concept with supporting information for review and acceptance as an alternative to the design shown in the plans. The answer is yes, however as noted procedures as outlined in the FP-14 Section 103.03 Value Engineering, will need to be followed.
6. Drawing H 05 shows a 120/240 panel. Is this panel new? If yes what type and how many circuits?
Response: Yes, this panel is new. Please see below information about the circuits:
- 100A, 120/240V, 1 phase, 3 wire split-bus panelboard with 100A Main Circuit Breaker and 30 space minimum o 6 space top section (24-hour) 1 – 20A, 1P (Time Clock, Lighting Contactor, PEC) o 100A contactor (assume 6 spaces) o 18 space bottom section (contactor controlled)
1 – 60A, 2P (Circuit 6) 5 – 20A, 2P (Circuits 1,2,3,4,5)
- Astronomical Time Clock with Reserve Power (controlling the lighting contactor)
- 120V Photoelectric Cell (controlling the lighting contactor)
The contactor should be controlled by the PEC (On) and Time Clock (Off). This has been addressed in this amendment.
7. Is there a panel schedule if the panel is new?
Response: There is no panel schedule. The circuits are described in the wiring diagram.
8. How is the panel to be mounted if it is a new one? Is there a mounting detail?
Response: The panelboard and other equipment shall be mounted in a NEMA 3R painted steel enclosure, minimum dimensions of 30” Wide x 18” Deep x 54” High.
This has been addressed in this amendment.
The enclosure shall be mounted on a 3’ deep concrete pad extending a minimum of 3” beyond the enclosure dimensions. Mounting detail has been revised as part of this amendment.
9. For the four under deck type “B” fixtures can we run conduit inside the tunnel or are we to core drill from the outside in at each location?
Response: The conduit can be run surface mounted inside the tunnel.
10. What size conduit is to be used for the Type “B” fixtures?
Response: The conduit from box to box shall be 1½” conduit. The conduit from each junction box to the luminaire shall be ½” or ¾”, as per manufacturer’s recommendation for conduit entry. This has been addressed as part of this amendment.
11. The detail Darwin E633-I daytime Tunnel Luminaire is supposed to be a ceiling mounted fixture according to drawing H 05. The fixture in the detail is a wall mount or pole mount which drawing is correct.
Response: The intention is for the luminaire to be mounted to the ceiling. The luminaire is available with a trunnion mount, but an arm or plate can be mounted from the ceiling and wall mount/pole mount arm may be used which would extend the luminaire below the ceiling to not exceed 8 inches. Sheet H05 has been revised as part of this amendment.
12. What size wire is required for the under deck daytime Luminaire.
Response: The wire from box to box shall be 3-#2 AWG & 1-#2 GND IN 1½” conduit. The conduit from each junction box to the luminaire shall be 2-#10 AWG & 1-#10 GND IN ½” or ¾”, as per manufacturer’s recommendation for conduit entry. An amendment has been issued to address size wire.
13. The drawings call for Malleable Iron splice boxes for type “A”, “B”, and “C” light fixtures. Is there a detail or part number for these specific boxes?
Response: No detail is provided. The junction boxes shall be 12” x 12” x 6” deep minimum to account for the size of the conduit. An amendment has been issued to address this.
14. We are bidding the above mentioned project a subcontract for project. we come across question that needs clarification On contract drawing sheet, RO2 show two doors on each side of the tunnel. However, there is no detail for these two doors and also there is no pay items for these doors. Please provide the details for the doors and clarify under which pay items these will be paid.
Response: A pay item and an amendment has been issued to address this.
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0003 |
| Solicitation: 693C73-20-B-000018 |
File details come from the government source that posted it. Updated .