Results_of_Bid_Opening_-_NP-GWMP_1(2),_2(4).pdf
PDF 102 KB Posted
- Attached to
- George Washington Memorial Parkway
- Solicitation number
- 693C73-19-B-000030
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pavement_Rpt.pdf | ||
| Plans_-_NP-GWMP_1(2),_2(4).pdf | ||
| FP14_Eng.pdf | ||
| NEPA_CE_(Approved).pdf | ||
| IFB_Solicitation_-_NP-GWMP_1(2),_2(4).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-4212_Form.pdf | ||
| Synopsis_-_NP-GWMP_1(2),_2(4).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
George Washington Memorial Parkway
PROJECT: NP-GWMP 1(2), 2(4)
SOLICITATION NO. 693C73-19-B-000030
August 1, 2019 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-19-B-000030, PROJECT NUMBER: NP-GWMP 1(2), 2(4)
August 1, 2019, 2:00 p.m. EST
BIDDER BID TOTAL DAYS TOTAL PRICE
GC Works Inc.
Schedule A $2,767,814.40 Option 1 $2,043,350.40
Calendar Days Schedule A + Option 1 $4,811,164.80
Estes Bros. Const., Inc.
Schedule A $1,366,178.00 Option 1 $984,738.00
Calendar Days Schedule A + Option 1 $2,350,916.00
Engineer’s Estimate Schedule A $814,000.00 Option 1 $555,000.00
Calendar Days Schedule A + Option 1 $1,369,000.00
All construction activities must be completed by no later than November 15, 2019
| Slide Number 1 |
| FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-19-B-000030, � PROJECT NUMBER: NP-GWMP 1(2), 2(4)�August 1, 2019, 2:00 p.m. EST |
File details come from the government source that posted it.