Plans_-_WV_ERFO_FS_2016-1(4).pdf
PDF 22 MB Posted
- Attached to
- Monongahela National Forest Federal contract opportunity
- Solicitation number
- 693C73-19-B-000014
About this file
Plans - WV ERFO FS 2016-1(4)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amended_Results_of_Bid_Opening_-_WV_ERFO_FS_2016-1(4).pdf | ||
| Results_of_Bid_Opening_-_WV_ERFO_FS_2016-1(4).pdf | ||
| Amendment_0001_-_WV_ERFO_FS_2016-1(4).pdf | ||
| IFB_Solicitation_-_WV_ERFO_FS_2016-1(4).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-4212_Form.pdf | ||
| WV_ERFO_FS_2016-1(4)_-_Final_Geotech_Report.pdf | ||
| SHPO_Response.pdf | ||
| CE_FHWA_and_FS_Signed.pdf | ||
| FP14_Eng.pdf | ||
| FWS_Response.pdf | ||
| SWPPP.pdf | ||
| Synopsis_-_WV_ERFO_FS_2016-1(4).doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R01
1- J a n -2
:0
A M
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
th
Field verify all dimensions.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
HL-93. Maximum Dynamic Load Allowance, IM=33%
Live Loads:
GENERAL NOTES AND INDEX
No scale
Arsenate Type C (CCA) and use Category UC4C.
Pressure treat timber according to AWPA Standard P23, Standard for Chromated Copper
Furnish glulam timber railing and post conforming to AASHTO M 168 and AASHTO M 133-12.
Timber:
Furnish 1-inch diameter high strength steel bar conforming to AASHTO M 275, Type II, Grade 150.
Pre-tension each strand to a total load of 43,950 lbs, at which load f'si = 0.75 f'u = 202,500 psi.
Furnish 0.6-inch diameter, seven wire, low-relaxation, prestressing strand comforming to AASHTO M 203, Grade 270.
Prestressing Steel:
Dead Load:
Future wearing surface: 25 psf
Average Railing weight: 70 plf
Concrete: 150 pcf
DESIGN LOADS:
GENERAL NOTES:
Design:
AASHTO LRFD Bridge Design Specifications, 8 Edition, 2017.
SPECIFICATIONS:
Concrete:
- inch unless otherwise noted.4 3Chamfer exposed edges of all concrete
Furnish Class P(Prestressed) concrete for prestressed concrerte slab beam with f'ci = 5.5 ksi at release and f'c = 7.0 ksi at 28 days.
Furnish Class A(AE) concrete for abutment with f'c = 4.5 ksi at 28 days.
Furnish Class D(AE) concrete for concrete deck with f'c = 5 ksi at 28 days.
MATERIALS:
Provide 2-inch cover for reinforcing steel unless otherwise noted.
Furnish epoxy coated reinforcing bars for prestressed concrete slab beams and concrete deck conforming to ASTM A775.
Furnish reinforcing bars conforming to AASHTO M 31, Grade 60 deformed.
Reinforcing Steel:
INDEX OF BRIDGE PLAN SHEETS
Concrete Reinforcement Schedule
Approach Rail Transition Details
Glulam Timber Bridge Railing
Typical Section and Deck Reinforcement
Prestressed Concrete Slab Beams Miscellaneous Details 2
Prestressed Concrete Slab Beams Miscellaneous Details 1
Prestressed Concrete Slab Beam - Interior
Prestressed Concrete Slab Beam - Exterior
Framing Plan
Abutment Footing and Wingwall Details
Abutment Reinforcement
Typical Abutment Layout
Riprap Layout
Foundation Layout
Boring Log
Plan and Elevation
Site Plan
General Notes and Index
SHEET NO. SHEET TITLE
A C
T U
A L F I L E R
W V E
R F
O F
S
G N .D
G N
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.BRIDGE PLAN SHEET
BRP-126118
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
WILLIAMS RIVER ROAD BRIDGE OVER ELBOW BRANCH
January 2019
R02
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
N
507+00
Williams River Road
Edge of roadway
Edge of roadway
Begin BridgeWilliams River Ro ad
2563.27Elev.
Sta. 506+72.79
'' = 1'-0''4
Bridge length: 30'-2"
RoadwayCL
StructureCL End Bridge
Elev. 2563.34
Sta. 507+02.96
E lb o w B ra n c h
SITE PLAN
506+50 507+50
P T
.6 and salvage abutment stones
Remove existing bridge superstructure Class 5 (Typ.)
Placed Riprap,Method A
A C
T U
A L F I L E R
W V E
R F
O F
S
S it e .D
G N
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
WILLIAMS RIVER ROAD BRIDGE OVER ELBOW BRANCH
January 2019
5 258
R03
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Notes:
NO. DATE BY REVISIONS DATE BY REVISIONSNO.
ELEVATION
PLAN
PROFILE GRADE
Event
Storm
(cfs)
Flow
(ft)
Freeboard
HYDRAULIC DATA
2559.21
2561.38
2.23
N
V P I
E L ,5
.2
E L ,5
.4
V P I
+0.222%
-3.455% +3.6
45' VC
K = 13
45' VC
K = 12
Q
Q
No scale
Elev.
W.S.
Bridge length = 30'-2"
PLAN AND ELEVATION
Q El. 2559.2150
0.06
Bridge accordance with Section 203.
3. Stockpile stones at a location to be designated by CO in
2. Carefully remove and salvage existing abutment stones.
operations for approval.
1. Submit a bridge removal plan before beginning any removal
'' = 1'-0''4
B ra n c h
E lb o w
Begin Bridge
2563.27Elev.
Sta. 506+72.79
End Bridge
Elev. 2563.34
Sta. 507+02.96
CL
CL
507+00
Abutment 1 Abutment 2
Fix Exp.
Elev. 2561.45
Approx. low cord
Class 5 (Typ.)
Placed Riprap,Method A ground @ of C Rdwy.
Approx. existing (See Note 2)
Existing abutment stones (Typ.)
30'-2"
+0.222% bridge railing
Glulam timber
CL
transition (Typ.)
W-beam/thrie beam
(Typ.)
W-beam
Structure
Roadway
A C
T U
A L F I L E R
W V E
R F
O F
S
P
E .D
G N
Wingwall B
Wingwall A
Wingwall D
Wingwall C
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
R04
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
Notes:
1.
encountered at the boring locations shown.
Boring logs on this sheet represent the subsurface conditions
N
PLAN
ELEVATION
5.0
3.8
13.8
Depth (ft) Rec / RQD
Sta. 507+03.36, 18.48' RT
1.8 / 24
4.5 / 74
4.9 / 98
CL Roadway
Existing ground at
+0.222%
Begin Bridge
2563.27Elev.
Sta. 506+72.79
End Bridge
Elev. 2563.34
Sta. 507+02.96
507+00
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
TEST BORING MISCELLANEOUS
CR% RQD
N
N
N
N
J-N JAR SAMPLE NO.
BORING NUMBER B-N
DEPTH MARKS
BHT OR BHR
(TIME OF DRILLING)
WATER LEVEL (WL)
(24 HOURS)
WATER LEVEL (WL)
SYMBOL TYPE OF MATERIAL SYMBOL TYPE OF MATERIAL
6. BHR-BORE HOLE REFUSAL
5. BHT-BORE HOLE TERMINATED
4. RQD-ROCK QUALITY DESIGNATION
3. CR%-PERCENT OF RECOVERY
2. R-REFUSAL, SPT 100 BLOWS/300 mm
1. SPT-STANDARD PENETRATION TEST -AASHTO T206-74
N BLOWS/300 mm (SPT)
SCALE
7. GEOPHYSICAL TEST SITE: SEISMIC RESISTIVITY
S R
BOULDERS
BORING LOG
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
MONONGAHELA NATIONAL FOREST
SANDSTONE
‚" = 1'-0"
CH17-03
CH17-03
FOREST ROAD ROUTE 86, MP 10.8
ELBOW BRANCH
WILLIAMS RIVER ROAD BRIDGE OVER
A C
T U
A L F I L E R
W V E
R F
O F
S
B o r
L o g .D
G
R05
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Note:
CL
E lb o w B ra n c h
C Structure
El. 2556.34El. 2556.27
El. 2558.27 El. 2558.34
FOUNDATION LAYOUT
to be remove
Existing Bridge grade and backfill with lean concrete as directed by the CO.
1. Excavate unsuitable material one foot below foundation
Begin Bridge
6'-0" 3'-6"
Abutment 1
Face of backwall
9'-6"
Sta. 506+72.79
9'-6"
End Bridge
6'-0"3'-6"
Abutment 2
Face of backwall
Sta. 507+02.96
PLAN
'' = 1'-0''4
#5 Rock dowel
(See Note 1) backfill (Typ.)
Lean concrete
Profile grade
CL@ C Rdwy.
Approx. existing ground #5 Rock dowel
A C
T U
A L F I L E R
W V E
R F
O F
S
F o u n d L a y o u t.
D G
N
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
Class 1, Type C
Geotextile filter
4'-8" (Abutment 1)3'-0"
R06
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
RIPRAP LAYOUT
6'-0" 6'-0"7'-8" "8 17'-9
Channel Bottom
11'-9"
B ra n c h
E lb o w
Begin Bridge
2563.27Elev.
Sta. 506+72.79
End Bridge
Elev. 2563.34
Sta. 507+02.96
Toe of slope
Class 5 (Typ.)
Placed Riprap,Method A m in
Elev. 2559.50 (Abut. 2)
Elev. 2559.44 (Abut. 1)
Top of riprap
11'-9" Channel bottom
2'-6" min.
TYPICAL SECTION
CL Bearing
2'-6"7'-0"
" (Abutment 2)8 14'-9 m in
PLAN
Toe of slope Toe of slope
N
CL Roadway
Elev. 2556.33 @
Channel bottom
" = 1'-0"2 1Scale:
" = 1'-0"4 1Scale:
As shown
A C
T U
A L F I L E R
W V E
R F
O F
S
R ip r a p L a y o u t.
D G
N
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
R07
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
N
A b u tm e n t b u tm e n t
N
TYPICAL ABUTMENT LAYOUT
1'-0" 9'-6" 9'-6" 1'-0"
A
StructureCL
B1 B2 B3 B4 B5
21'-0"
9'-1"9'-1"
A
1'-5"1'-0" 1'-5" 1'-0" filler
1" Preformed joint hole (Typ.)
Anchor dowel bridge
Begin/End Footing
Wingwall
Bearing CL
Elev. D
Elev. B
Elev. A
Elev C
Stem
Backwall
CL Structure
Elev. E
Beam seat Elev. C
Top of riprap
Elev. D
Top of backwall
Lean concrete backfill
Footing
Location A
Elevation (ft.)
ABUTMENT ELEVATIONS
Abutment 1
Abutment 2 2556.34
B C D E
2558.34
2558.27
2561.42
2561.35
2563.16 2563.34
2563.272563.092556.27
PLAN
ELEVATION
9'-6"
SECTION A-A
2'-0"5'-0"
1'-0"1'-0" 6"
BearingCL sheet drain
Geocomposite
Structural backfill
(#57 Stones)
Weep drain
4" Dia. Non-corrosive pipe from abutment for free drainage away
Lowest point feasible
Aggregate base
'' = 1'-0''2
KEY
B1CLSlab beam
A C
T U
A L F I L E R
W V E
R F
O F
S
A b u t
L a y o u t.
D G
N grade and backfill with lean concrete as directed by the CO.
2. Excavate unsuitable material one foot below foundation to accommodate thermal expansion.
1. Increase thickness of the preformed joint filler as necessary
(Abutment 1 shown, looking back station)
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
1'-3"
#5A2 or #5A3
1'-3"
(Typ.)
2" Clr.E m b e d
#5A2
#5A1 e.f.
#5A1 e.f
#5A4 e.f.
R08
1- J a n -2
:5
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
SECTION A-A
'' = 1'-0''4
A
A
ABUTMENT REINFORCEMENT
2 - #6AF3 spaced with #5A2 and #5A3
1'-0"1'-0" 1'-0"1'-0"
S p a
A
#6AF1
3" (Typ.)
C lr
#5AF2 (Top & Bot.)
9 Spa. @ 1'-0" = 9'-0"
PLAN
ELEVATION
#5A1
B
B
Footing
1'-0"9"13 Spa. @ 1'-0" = 13'-0"9"1'-0"
#6AF3
3 - #5A1
#5A2
#5A3
#6AF4
#6AF4
A C
T U
A L F I L E R
W V E
R F
O F
S
A b u t
R e in f.
D G
N
2 - #5A4
A F
S p a
A F
S p a
9"1'-0" 1'-0"9"13 Spa. @ 1'-0" = 13'-0"
2 - #6AF3 spaced with #5A2 and #5A3
View B-B and additional information.
See "ABUTMENT FOOTING AND WINGWALL DETAILS' for 1.
(Abutment 1 shown, Abutment 2 similar)
A F
S p a
A F
S p a
#6W1 #6W1
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
F
T o p B o t.
S p a
#6W1
#6W1
R09
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Note:
E m b e d
(Typ.)
embedment
4'-0" Min. rock
4'-0"
FOOTING DOWEL DETAIL
" = 1'-0"4
3Scale:
DETAILS
ABUTMENT FOOTING AND WINGWALL
A C
T U
A L F I L E R
W V E
R F
O F
S
A b u t
W W F
T G .D
G N
Type IV.
Furnish epoxy resin adhesive conforming to AASHTO M235, adhesive.
Install rock dowel below foundation grade with epoxy resin
2.
1.
FOOTING REINFORCEMENT PLAN
#6AF1 (Top & Bot.)
22 Spa. @ 1'-0" = 22'-0"
#5 Dowels
12 Spa. @ 1'-6" = 18'-0" 2'-3"2'-9"
T y p
6" 6"
As shown
" = 1'-0"2 1Scale:
VIEW B-B SECTION C-C
C
C
" = 1'-0"4 3Scale: " = 1'-0"4
3Scale:
W
S p a
6"3"
#6AF4
4 Spa. @ 1'-0" = 4'-0"
W
S p a
" #6AF4
7'-6"
1'-0"
#6AF4
2 Spa. @ ± 1'-0"
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
R10
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
FRAMING PLAN
'' = 1'-0''2
13'-4"13'-4"
7"7"7"9" 7" 9"
1'-8" 1'-8"
30'-0"
B1
B2
B3
B4
B5
(See Note 2)
Recess pocket
" 9
CLStructure
FRAMING PLAN
11"1" 11" 1"
Notes:
2.
1.
DETAILS 1" sheet for additional information.
See "PRESTRESSED CONCRETE SLAB BEAMS MISCELLANEOUS additional information.
See "PRESTRESSED CONCRETE SLAB BEAMS" sheet for A
C T
U A
L F I L E R
W V E
R F
O F
S
F r a m e P la n .D
G N
Begin Bridge CL Bearing CL End Bridge Bearing
CLCL CL
KEY
B1CL Slab beam
(Typ.)
2" Dia. sleeve
1" 1"
E x te r io r b e a m I n te r io r b e a m n o m in a l s p a c in
E x te r io r b e a m
3" Dia. sleeve 3" Dia. sleeve 3" Dia. sleeve
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
R11
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
WILLIAMS RIVER ROAD BRIDGE OVER ELBOW BRANCH
January 2019
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
PLAN - END BLOCK
TYPICAL SECTION
2 Strands
6 Strands
" Clr.2
"4 33 "4
#4GE5
LBSReinf. Steel
Concrete
ITEM UNIT QUANTITY
PRESTRESSED BOX BEAM ESTIMATE
Note: Quantities shown are for one beam only.
LNFT
CUYD
0.6 Dia. Strands 240
3.92
C = estimated camber at erection.
B = estimated camber due to deck, haunch, diaphragms and railings.
CAMBER TABLE (in.)
A
Exterior beam midspan
B C
A = estimated camber due to prestress and self weight of beam.
0.21 0.07 0.14
CL
L/2L/2 span ends
Line between
A
C B
CL midspan
Symm. about
CAMBER DIAGRAM
Bearings CL Bearings
KEY
Straight Strand
Notes:
A C
T U
A L F I L E R
W V E
R F
O F
S
E x t
S la b .D
G N
BEAM - EXTERIOR
PRESTRESSED CONCRETE SLAB
CL
"2 12 "2
145" 9" "2
(Typ.)
3" Dia. Sleeve of each voids (Typ.)
" Dia. drain at both end 4
2'-1"
3 Spa. @ 8" = 2'-0"
#4GE1 w/ #4GE2 & #4GE3
30'-0" Beam length (out to out)
3"6"
#4GE1
T y p
2" Clr.
(Typ.)
#4GE3
"4 slab
Symm. about
CL
2" Clr.
#4GE2
#4GE1 w/ #4GE2 & #4GE3
15 Spa @ 9" = 11'-3"
3"6"
G
E
ELEVATION
(Strands not shown)
#4GE4
& #4GE3
#4GE1 w/ #4GE2
3" " Drip groove2
" (Actual width)2 12'-11"4
1 "4
3'-0" (Nominal width) JointCL
Rake finish
JointCL
10""2 12'-1
EXTERIOR SLAB UNIT, S36" x 15"
11" 7"9"
CL Bearing CL 3" Dia. sleeve
"2
G E
S p a
3'-4"
" = 1'-0"2
G E
S p a
END BLOCK SECTION
(See "TYPICAL SECTION" for detail not shown) end of each void (Typ.)
Dia. drain at both4
(See "END BLOCK SECTION" for detail not shown)
Anchor dowel sleeve
Bearing & midspan
Symm. about
CL
RECESS DETAIL"
See "SHEAR KEY
4"4" 5"
4-#4GE6
not allowed. Do not interfere with strands or internal voids.
5. Cast studs or threaded inserts with beam, field installation is embedded studs or threaded inserts.
4. See "GLULAM TIMBER RAILING" sheet for location of
MISCELLANEOUS DETAILS 2" sheet for additional information.
DETAILS 1" and "PRESTRESSED CONCRETE SLAB
3. See "PRESTRESSED CONCRETE SLAB BEAM MISCELLANEOUS
2. Use a non-corrosive pipe when casting the 3-inch dia. sleeve.
-inch.4 1with an amplitude of
1. Rake a transverse roughened finish on top surface of beam
6"10"6"6"
#4GE4
R12
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
PLAN - END BLOCK
LBSReinf. Steel
Concrete
ITEM UNIT QUANTITY
PRESTRESSED BOX BEAM ESTIMATE
Note: Quantities shown are for one beam only.
LNFT
CUYD
0.6 Dia. Strands
END BLOCK SECTION
#4GE5
4.60
Notes:
C = estimated camber at erection.
B = estimated camber due to deck, haunch, diaphragms and railings.
CAMBER TABLE (in.)
A
Interior beam midspan
B C
A = estimated camber due to prestress and self weight of beam.
0.33 0.07 0.26
CL
L/2L/2 span ends
Line between
A
C B
CL midspan
Symm. about
CAMBER DIAGRAM
Bearings CL Bearings
9" 7"11"
G E
S p a
"2 13'-3
S p a
G E
No scale
A C
T U
A L F I L E R
W V E
R F
O F
S
I n t
S la b .D
G N
BEAM - INTERIOR
PRESTRESSED CONCRETE SLAB
RECESS DETAIL"
See "SHEAR KEY
8" 8" 8"
INTERIOR SLAB BEAM, S48" x 15" end of each void (Typ.)
Dia. drain at both4
CL
"2 12 "2
145" 9" "2
(Typ.)
3" Dia. Sleeve of each voids (Typ.)
" Dia. drain at both end 4
2'-1"
3 Spa. @ 8" = 2'-0"
#4GE1 w/ #4GE2 & #4GE3
30'-0" Beam length (out to out)
#4GE1 w/ #4GE2 & #4GE3
15 Spa @ 9" = 11'-3"
ELEVATION
(Strands not shown)
#4GE4
& #4GE3
#4GE1 w/ #4GE2
Anchor dowel sleeve
Bearing & midspan
Symm. about
CL
CL
"4 1 "4
4'-0" (Nominal width) Joint
" (Actual width)2 13'-11
10""4 31'-1"4
31'-110"
Rake finish
CL Joint
" = 1'-0"2
6"
"4 34 4" 6" 4"
" Clr.2
#4GE1
TYPICAL SECTION
CL slab
Symm. about
5"
3"
T y p
2" Clr.
2" Clr.
#4GE2
4-#4GE6
2 Strands
8 Strands
"4 33 "4
#4GE4
5 Spa. @ 8± = 3'-4"
G
E
#4GE3
(See "TYPICAL SECTION" for detail not shown)
CL Bearing CL 3" Dia. sleeve
MISCELLANEOUS DETAILS 2" sheet for additional information.
DETAILS 1" and "PRESTRESSED CONCRETE SLAB
3. See "PRESTRESSED CONCRETE SLAB BEAM MISCELLANEOUS
2. Use a non-corrosive pipe when casting the 3-inch dia. sleeve.
-inch.4 1with an amplitude of
1. Rake a transverse roughened finish on top surface of beam
KEY
Straight Strand
" Clr.2
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
R13
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
WILLIAMS RIVER ROAD BRIDGE OVER ELBOW BRANCH
January 2019
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
SECTION B-B
As shown
Grout
3" Dia. hole
B
B
5"
CL
1" Dia. high strength steel bar w/
4" min. thread, each end
TRANSVERSE TIE ROD DETAIL
A A
4" Hex nut
1" Max.
" Min.2
Fill w/ nonshrink grout
SHEAR KEY DETAIL LIFTING EYE DETAIL
CL
Top of girder
'' Dia. strand2
Double top
3 Cable clamps
Scale: 1'' = 1'-0''
" 1
4" 4"
CL
"2
6"
"4 1 "4
Fascia side of beam
SECTION A-A
Scale: 3'' = 1'-0''
No ScaleNo Scale
No Scale
"4
Tooled edge
" Chamfer4
"8
SHEAR KEY RECESS DETAIL
Scale: 3'' = 1'-0''
1"
(ASTM A36)
bearing plate
"4 15" x 5" x 1 placed prior to erection of beams
Self adhesive compressible sealer, Self adhesive compressible sealer
Spay with expandable foam 12" to 1" thick
")2 1 (±"4
3" Dia.
Sleeve grout
Fill recesses with nonshrink
C Lifting eye 11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
MISCELLANEOUS DETAILS 1
PRECAST CONCRETE SLAB BEAMS
A C
T U
A L F I L E R
W V E
R F
O F
S
B e a m M is c .D
G N
Fill joint with non-shrink grout prior to final tensioning
1" Dia. steel bar
3" Dia. sleeve & lifting eye to the CO.
and anchor dowel hole. Submit drawing showing location of
Place lifting eye at location along beam to clear reinforcement shrink grout of the same color as the beam.
After tightening, fill the recesses in the exterior beam with non with two coats of zinc-oxide paint.
Using saw, trim excess steel bar and paint the trimmed ends for approval.
Submit the proposed method of tightening steel bars to the CO
The tension force of each steel bar after all loss is 80,000 lbs.
tensioning.
working in the same sequence as the first stage of final apply the remaining percentage of final post tensioning force, midspan. After all thread bars have been tensioned to 50%, tensioning force to all thread bars, working beam ends to
After keyway grout has cured, apply 50% of the final post
725.13(b) and water cure for a minimum of 3 days.
Fill keyway with nonshrink grout conforming to Subsection tensioning force of approximately 3000 lbs.
pull the entire superstructure together by applying a post
After beams have been set and thread bars have been installed, filled.
Cover and protect shear keys from weather and debris until steel bars are properly tensioned.
Do not allow traffic or heavy equipment on the beams until the
Use a non-corrosive pipe when casting the 3-inch dia. hole.
Grade DH. Galvanize steel bar, plates, nuts and washers.
Type II Grade 150 and heavy hex nut conforming to ASTM A563, Furnish high strength steel bar conforming to AASHTO M 275, R14
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
11"1"
See "DETAIL A"
SECTION A-A
joint filler expansion
Preformed
BB
W
W
W
L
L
L
PLAIN ELASTOMERIC BEARING
SECTION B-B
Location Exp.
Fix/ Quantity
H L W
PLAIN ELASTOMERIC BEARING TABLE
Abutment 1
Exp.
Fix
(kips)
Dead Load
(kips)
Live Load
22.0
Elastomer Layer (in.)
Abutment 2 2 22.0
H
PLAN ELASTOMERIC BEARING LAYOUT
DETAIL A
Backwall
1"
Preformed expansion joint filler
Concrete deck
Joint opening
R e c e s s
M in
Notes:
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
MISCELLANEOUS DETAILS 2
PRESTRESSED CONCRETE SLAB BEAMS
(See Note 5) for 1" dia. x 2'-0" long anchor dowel
" Dia. hole in bridgeseat4
A C
T U
A L F I L E R
W V E
R F
O F
S
B e a m M is c .D
G N
Slicone joint sealent
(See Note 9)
(See Note 10)
Backer rod
Front face of bridge seat
A A
Backwall
CL Bearing
"2 18 6"
Slab beamCL hole (Typ.)
Anchor dowel
Bearing (Typ.)
Elastomeric
CL
CL
beam along C slab
Bearing pad
Begin/End Bridge CL Bearing
(See Note 6)
2" Dia. sleeve
2" Dia. hole for anchor dowel filler (See Note 2)
Preformed expansion joint
Aggregate surface course
Structural backfill
(#57 Stone)
Slab beam
13.0
15.0
13.0
15.0
22.0
22.0
CL
for anchor dowel
2" Dia. hole
No scale the prestressed concrete slab beams.
backer rod and silicone joint sealant, is considered incidental to grout, the anchor dowels, the preformed expansion joint filler, All costs associated with furnishing and installing the keyway
Furnish backer rod conforming to Subsection 712.01(f).
712.01(a)(4).
Furnish silicone joint sealant conforming to Subsection bituminous joint filler conforming to ASTM D6690, Type II.
At expansion end, fill the 2-inch anchor hole with hot pour mortar conforming to ASTM C1107.
At fixed end, fill the 2-inch anchor hole with portland cement
ASTM D3034 when casting anchor sleeve.
Furnish a non-corrosive pipe conforming to AAHTO M 232 or and dry dowel holes and install dowels with nonshrink grout.
Drill into the bridge seat after tensioning of the steel bar. Clean conforming to ASTM A615, Grade 60.
Furnish 1-inch dia. x 2 feet long galvanized anchor dowels
Install a continuous preformed expansion joint filler.
Subsection 712.01(b)(2).
Furnish preformed expansion joint filler conforming to
Use 60 durometer hardness for the elastomer.
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
R15
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
WILLIAMS RIVER ROAD BRIDGE OVER ELBOW BRANCH
January 2019
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
As shown
B3 B4 B5B2B1
8'-0" 1'-0"8'-0"1'-0"
Varies
2%
TYPICAL SECTION
(Looking ahead station)
2% Profile grade 7 railing (Typ.)
Glulam timber
(Typ.)
Shear key
Notes:
3.
2.
1.
A
C T
U A
L F I L E R
W V E
R F
O F
S
T y p S e c t.
D G
N
RoadwayCL CL Structure
#4SE2
#4SE1
19 Spa. @ 1'-6" = 28'-6"
#4SE1
Scale: 1" = 1'-0"
SLAB REINFORCEMENT
Scale: 34'' = 1'-0''
9" 9"
KEY
B1CL Slab beam
Exterior beam
3'-0"
Interior beam @ 4'-0" nominal spacing (including joints)
12'-0"
Exterior beam
3'-0"
Concret deck
18'-0" concrete deck.
Include the cost of reinforcement in unit price bid for information.
See "GLULAM TIMBER BRIDGE RAILING" sheet for additional foreign materials before placing concrete deck.
Clean the top surface of the beams of dirt, dust and other
S
E
S p a
4" Cov.
REINFORCEMENT
TYPICAL SECTION AND DECK
"2 14'-1"2
14'-1 4 Spa. @ 6'-3" = 25'-0"
Pay limit glulam timber railing
33'-3" ±
R16
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
As Shown
"4 35 "4
Spacer
"2
3" Min.Steel shoe wire nail
50d Common
(see Note 2) or bolted inserts
Embedded studs
Glulam rail
(See Note 6)
(See Note 14)
Transition connection
RAIL ELEVATION
(Back view)
Scale: 38'' = 1'-0'' beam transition
W-beam/thrie
W-beam
TYPICAL RAIL SECTION
Scale: 1'' = 1'-0''
VIEW A-A
Scale: 1'' = 1'-0''
3" Min.
Top of beam
8"
STEEL SHOE DETAILS
Scale: 11 2'' = 1'-0''
"4 38"8
"4
Stiffener
" 4 3" x 2
" Dia. hole8
1/4 2
4"
2'-0"
PLAN VIEW
"2
"2
2"
"2
7/16 10-1/2 E60
E60
60°
1" "4 39 "2
"4
SIDE VIEWELEVATION VIEW
E60 7/16 1-1/2
" Strap2 1" x 4
12" x 8
A
A
Hole dia. required for bolt/stud attachment deck
Top of concrete
(Typ.)
" Dia bolt8
Abutment (Typ.)
A C
T U
A L F I L E R
W V E
R F
O F
S
G lu R a il .D
G N about
Symm.
CL
(See Note 1 and 7)
Timber post
" 2 1" x 92
Slab beam about
Symm.
CL
about
Symm.
CL
GLULAM TIMBER BRIDGE RAILING
Notes:
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
additional information.
See "APPROACH RAIL TRANSITION DETAILS" sheet for
ASTM D4586.
Seal top of rail posts with roofing cement conforming to washers may be omitted under heads of dome-head timber bolts.
sufficient to develop connection strength without wood crushing, contact with wood. When the size and strength of the head are
Furnish malleable iron washer under bolt heads and under nuts in
Weld according to AASHTO/AWS, Bridge Welding Code D1.5.
AASHTO M 111 or M 232.
Galvanize all steel components and fasteners according to dome-head timber bolts.
Furnish bolts conforming to ASTM A307 requirements, Grade 2, and
Furnish steel plates and shapes conforming to ASTM A36.
Fir-Larch.
graded No. 1 Southern Pine or visually graded No. 1 Douglas
Fabricate post and spacer block with sawn lumber from visually grade of at least 1,800 pounds per square inch.
Southern Pine Combination No. 48, or other species having a stress graded western species Combination No. 2, visually graded
Fabricate horizontally laminated glulam timber rail from visually preservative.
treatment with preservatives. Field treat all damage timber with
Cut, bore, and completely fabricate all timber before pressure category UC4C.
Standard for Chromated Copper Arsenate Type C (CCA), use
Pressure treat according to AASHTO M 133 and AWPA Standard P23, Furnish sawn lumber and glulam conforming to AASHTO M 168.
Cast selected connection with beam, field drilling is not allowed.
capacity of 50,000 lbs. in tension.
approval with each connection meeting a minimum ultimate bolted inserts or embedded studs. Submit selected connection for
Attach steel shoe for each post to the beam with two connections, a nominal 8-inch by 10-inch member that is surfaced on four sides.
Post dimensions correspond to the standard dressed dimensions for
Dimensions for timber rail, post, and spacer are actual dimensions.
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
R17
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d plate is flush with top of rail
Transition plate connection
W-beam
8" x 8" x 14" Spacer block
8" x 8" x 72" Timber post w/
PLAN
" Spacer block 2 18" x 8" x 22
8" x 8" x 78" Timber post w/
Spacer (Typ.)
Post (Typ.)
ELEVATION
2.
1.
transition
W-beam/thrie beam
6'-3"6'-3"" = 6'-3"2 12 Spa. @ 3'-1"2
14'-1
Pay limit of thrie beam structure transition
8'-2" Plate Detail
See Steel Transition
Detall for bolt spacing
See Transition Plate
" Dia. bolt (Typ.)8
"8 11 "8
72'-6 connector
Thrie beam terminal
2'-3"
Block Detail
See Transition
8" x 8" x 18" Spacer block
8" x 8" x 78" Timber post w/
Beam
Abutment
Not to scale
"2 11'-1
"2
2'-7"
8"5"4"4"4""4
All holes are 1" dia.
STEEL TRANSITION PLATE
1"
2'-3"
1'-2"3"
"4 138"
TRANSITION BLOCK
(Typ.)
1" Dia. hole
8"5"4"4"4"
"4 12'-7
TRANSITION GLULAM RAIL BORING DETAIL
Glulam rail
APPROACH RAIL TRANSITION DETAILS
A C
T U
A L F I L E R
W V E
R F
O F
S
T r a n s R a il D
T S .D
G N
Pay limit of structure transition end terminal section
See Detail ET 617-19A and ET 617-20A for conforming to AASHTO M 180
Furnish W-beam and thrie beam rail splice bolts and post bolts
AASHTO M 180.
transition (12 gage) and W-beam (12 gauge) conforming to
Furnish thrie beam terminal (10 gauge), W-beam/thrie beam
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
R18
1- J a n -2
M
P R
O J E
C T
S F
S
W V -1 (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
CONCRETE REINFORCEMENT SCHEDULE
No scale
A C
T U
A L F I L E R
W V E
R F
O F
S
R e b a r .D
G
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R
PRESTRESSED CONCRETE SLAB BEAM - EXTERIOR, EPOXY COATED BAR (1 BEAM)
V or N
S6 2"#4GE1 4 Bot. Stirrups
2 2"#4GE2 4 Top Stirrups
1 3„"#4GE3 4
17 3„"#4GE4 4 Vert. End Stirrups
17 3„"#4GE5 4 Horiz. End Stirrups
STR#4GE6 4 Long. top
LBSSUBTOTAL
PRESTRESSED CONCRETE SLAB BEAM - INTERIOR, EPOXY COATED BAR (1 BEAM)
V or N
S6 2"#4GE1 4 Bot. Stirrups
2 2"#4GE2 4 Top Stirrups
1 3„"#4GE3 4
17 3„"#4GE4 4 Vert. End Stirrps
17 3„"#4GE5 4 Horiz. End Stirrups
STR#4GE6 4 Long. top
ABUTMENT 1 REINFORCEMENT
V or N
STR#5A1 5
2 2•"#5A2 5
17 3ƒ"#5A3 5
52 3ƒ"#5A4 5
ABUTMENT 1 FOOTING REINFORCEMENT
V or N
STR#6AF1 6
STR#5AF2 5
2 4•"#6AF3 6
2 4•"#6AF4 6
WINGWALL A REINFORCEMENT
V or N
STR#6W1 6
WINGWALL B REINFORCEMENT
V or N
ABUTMENT 2 REINFORCEMENT
V or N
STR#5A1 5
2 2•"#5A2 5
17 3ƒ"#5A3 5
52 3ƒ"#5A4 5
ABUTMENT 2 FOOTING REINFORCEMENT
V or N
STR#6AF1 6
STR#5AF2 5
2#6AF3 6
2#6AF4 6
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R V or N
LBSSUBTOTAL
B
STR
B
C
D
OPTIONAL LEG
TYPE 17
WINGWALL C REINFORCEMENT
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R V or N
LBSSUBTOTAL
WINGWALL D REINFORCEMENT
REINFORCING STEEL SCHEDULE DIMENSION TABLE
A G
J
B
TYPE 1 TYPE 2
A G
B
A G
B
C
D
TYPE S6
D
C
B
A
TYPE 52
4•"
4•"
STATE PROJECT
NUMBER
SHEET
WV WV ERFO FS 2016 1(4)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
OA RECJPM George Choubah of
DATE
U.S. DEPARTMENT OF TRANSPORTATION
MONONGAHELA NATIONAL FOREST
(FOREST ROAD ROUTE 86, MP 10.8)
| WV_ERFO_FS_2016-1(4)_plans_adv_rev.pdf |
| WV ERFO FS 2016 1(4) - PLAN 100 %.pdf |
| WV_ERFO_FS_2016-1(4)_plans_adv_rev |
File details come from the government source that posted it.