17M7972_Draft_Letter_of_Results_Trail_D.PDF
PDF 2 MB Posted
- Attached to
- Chequamegon-Nicolet National Forest Federal contract opportunity
- Solicitation number
- 693C73-19-B-000007
About this file
17M7972 Draft Letter of Results Trail D
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
17M7972 Page 1 of 6
October 8, 2018 TPT Project 17M7972
Martha Alunkal, PE
WSP USA
13530 Dulles Technology Drive, Suite 300
Herndon, Virginia 20171
Re: Letter of Results and Recommendations
DSR Trail D – T1T2 and TR63-1
Culvert Replacement and Trail Reconstruction
Town of Drummond, Bayfield County, Wisconsin
Dear Ms. Alunkal:
This letter presents the results of our field explorations performed at the culverts for unnamed creeks crossing under Trail D (Sawmill Lane) in the Town of Drummond, Bayfield County, Wisconsin. The Trail D
T1T2 site is located around 11,500 feet northeast of the intersection of Owen Avenue with Trail D (Sawmill Lane) and the Trail D TR 63-1 site is located 9,200 feet northeast of the intersection of Owen
Avenue with Trail D (Sawmill Lane). This work covers Trail D T1T2 and TR 63-1 as part of the WI ERFO FS
2016-1(5) project.
Project
It is our understanding that WSP USA is in the design process for culvert replacement and trail reconstruction at the above referenced sites. It is our understanding that the culvert and trail sustained damage from a large rain event in July 2016. As part of the design process geotechnical services were requested.
Our scope of services for this project consisted of performing one (1) Standard Penetration Test (SPT) boring to a depth of 20 feet below creek bottom or refusal at each site. We were authorized to proceed with the proposed scope of services in a signed subcontractor agreement dated February 1st, 2018.
Field Exploration
Field procedures for this project were performed on September 17th, 2018 using our Diedrich D-120 track mounted drill rig and hollow stem auger and mud rotary drilling methods. Boring TR 63-1 was performed to the west of the washout located around 9,200 feet northeast of the intersection of Trail D with Owen Avenue and Boring T1T2 was located around 11,500 feet northeast of the intersection of
Trail D with Owen Avenue. The boring locations are shown on the Boring Location Sketch attached to this letter. Surface elevations were not recorded at the time of this report; the borings were performed at the existing trail surface.
1301 N 3 rd St. Superior WI 54880 715 - 392 - 7114 1 - 800 - 373 - 2562 F 715 - 392 - 7163 www.twinportstesting.com
17M7972 Page 2 of 6
Laboratory Testing Results of the field testing and observed subsurface conditions were evaluated to develop a laboratory testing program. The final laboratory testing program included visual classification by a geotechnical engineer.
Subsurface Conditions - Soils Trail D T1T2
Fill soils consisting of silty sand with gravel (AASHTO A-2-4) were encountered at the surface to a depth of 12 feet. Fill soils generally contained trace clay, were brown in color, and were moist.
Native clayey sand (AASHTO A-4) soils were encountered below the fill soils to a depth of 14 feet. Clayey sand soils were generally fine to medium grained, brown in color, and were wet. SPT N-values suggest that clayey sand soils were medium dense in relative density.
Native silty sand (AASHTO A-2-4) soils were encountered below the clayey sand soils to the boring termination depth of 26 feet. Silty sand soils were generally fine to coarse gained, were brown in color and were wet to waterbearing. Silty sand soils contained gravel at a depth of 19 feet. SPT N-values suggest that silty sand soils ranged from loose to medium dense in relative density.
Subsurface Conditions - Soils Trail D TR63-1
Fill soils consisting of silty sand with gravel (AASHTO A-2-4) and clayey sand (AASHTO A-4) were encountered at the surface to a depth of 11 feet. Fill soils generally ranged from fine to coarse grained, were dark brown to brown in color, and were moist.
Native sandy lean clay (AASHTO A-6) soils were encountered below the fill soils to a depth of 32 feet.
Sandy lean clay soils contained trace gravel, were brown in color, and were wet. SPT N-values suggest that sandy lean clay soils were medium to stiff in consistency.
Native clayey sand (AASHTO A-4) soils were encountered below the sandy lean clay soils to a depth of 38 feet. Clayey sand soils were generally fine to medium grained, were brown in color, and were waterbearing. SPT N-values suggest that clayey sand soils were medium dense in relative density.
Native silty sand (AASHTO A-2-4) soils were encountered below the clayey sand soils to the boring termination depth of 41 feet. Silty sand soils were generally fine to medium grained, were brown in color, and were waterbearing. SPT N-values suggest that silty sand soils were medium dense in relative density.
Subsurface Conditions - Groundwater Trail D TR63-1
Groundwater was not encountered in Borings T1T2 or TR63-1 while drilling and sampling at this site.
Groundwater levels at this site are anticipated to correspond with the surface levels of the adjacent unnamed creeks.
Design Considerations and Recommendations Culverts bearing on aggregate bedding or spread footings appear to be the most economical options for these sites. Alternative structure options for these sites include bottomless arches or bridges bearing on spread footings.
17M7972 Page 3 of 6
Site Preparation Field explorations at the Trail D T1T2 site encountered fill soils at the surface to a depth of 12 feet and at the Trail D TR63-1 site to a depth of 11 feet and will likely be encountered deeper during excavation activities. The conditions and compactive effort under which fill soils were placed is unknown and it is possible that these soils would settle significantly when loaded. We recommend that full time excavation observation by a geotechnical engineer be performed during construction to confirm the removal of fill soils prior to placement of any engineered fill, aggregate bedding, and/or foundations
Although soils beneath new construction are expected to experience little to no increase in net stresses, we do not recommend placing shallow foundations over uncontrolled fill soils. We recommend stripping all surface fill soils and any organic soils encountered within the footprint and influence area (1H:1V out from the outside edge of footings) of the proposed foundations and replacing with compacted engineered fill to reach design elevations. Excavations for the placement of culverts should be excavated to a minimum depth of one foot below the bottom of culvert elevation to insure the removal of any projections or boulders.
Shallow Foundations It appears that shallow foundations, consisting of spread footings or culverts bearing on aggregate bedding, may be used for foundation support when bearing on native soils or engineered fill over native soils. It is expected that culverts will be placed on a minimum of six inches of aggregate bedding overlying native soil. Recommendations for foundation design are provided below.
Net Allowable Bearing Stress
Results of the field and laboratory testing program were used to evaluate the net allowable bearing stress for shallow foundations. In our opinion, a net allowable bearing stress (with a minimum factor of safety of at least 2.5) of 2,500 psf (pounds per square foot) may be used to design footings placed on native soils or engineered fill over native soils.
Settlement Estimate
For foundations bearing on native soils or engineered fill over native soils and designed according to the net allowable bearing stresses outlined above, we estimate total settlement of less than one inch and differential settlements less than one-half inch.
Frost Protection We recommend that culvert foundations be placed at a minimum depth of six feet below finished exterior grade (surface of soil directly above foundation) to provide frost protection. We also recommend that roadway surface be a minimum of five feet above the water table to minimize frost heave.
In areas where new culvert construction tie into existing roadways, we recommend that excavations extend from the bottom of culverts at a slope of 1:20 (Vertical:Horizontal) to provide frost differential protection.
Backfill and Fill A wide variety of materials can be considered as suitable for engineered backfill placed in a controlled manner or for general fill soils at non-structural locations. The choice of materials is a function of structural requirements, water table conditions, seasonal construction constraints, placement and compaction methods, and other site or project specific needs. Soils which classify as SP, SP-SM, or SM in
17M7972 Page 4 of 6 the Unified Soil Classification System (ASTM D2487) or AASHTO A-1 and AASHTO A-2 in the AASHTO Soil Classification System are usually the most available suitable soils for engineered backfill and fill.
For this project, we recommend that Aggregate Bedding meeting the gradation outlined below for direct culvert support/bedding.
Table 2: Gradation for the entire sample
Sieve Percent Passing by Weight (%)
1 ¼ inch 100
No. 4 25-100
Table 3: Gradation for the portion of the sample passing the No. 4 sieve, conform to the following limits
Sieve Percent Passing by Weight (%)
No. 4 100
No. 40 --
No. 100 0-30
No. 200 0-15
Other gradations for backfill of over excavations or embankment construction may also be suitable as approved by the project geotechnical engineer. Existing fill and native soils may be suitable for re-use, but should be verified through sieve analysis of representative bulk samples.
We recommend that a geotextile fabric (WisDOT Type SAS or equivalent) be placed between native soils and engineered fill/aggregate bedding to promote drainage and provide separation.
Compaction Standard We recommend using ASTM D698 - Standard Proctor as the laboratory compaction standard.
Density
We recommend compacting each lift to a minimum of the following percentage of the above compaction standard for the respective types of fill materials:
Table 4: Compaction Recommendation
Type of Engineered Fill % Minimum Compaction
Foundation Structural Backfill 98%
Aggregate Bedding 98%
Non-structural Foundation Backfill 95%
Within 3 Feet of Pavement or Aggregate Base Section 100%
Lift Thickness Place engineered backfill and fill materials in lifts not to exceed eight inches in a loose condition, unless the contractor can demonstrate satisfactory results when placing thicker lifts. Maximum compacted lift thickness should not exceed 12 inches in a loose condition.
Moisture In general, granular fill materials should be placed and compacted within two percent of optimum moisture content, as determined by the above referenced compaction standard. When the moisture content of fill materials is not in this range, compaction to the required density may be difficult if not impossible. The excavating contractor is responsible for controlling and adjusting moisture content of backfill materials.
17M7972 Page 5 of 6
Scour and Riprap We recommend the use of concrete end treatments (headwalls and wingwalls) combined with riprap to prevent the erosion of embankment soils and to provide protection against scour. Culvert foundations should be placed at an adequate depth to avoid scour. A detailed scour analysis was not included in our scope of work.
Dewatering Groundwater was not observed in Boring T1T2 or TR 63-1 during drilling and sampling. Groundwater within excavations for construction of the proposed culverts are expected to be directly related to the levels of the adjacent unnamed creeks. If excavations extend below the groundwater surface and dewatering is necessary for construction, a large scale dewatering plan will be required. Dewatering options include diverting the unnamed creek around the excavation or installing temporary sheet pile cofferdams with sumps and pumps.
Over Sizing Excavations for the placement of engineered backfill should extend horizontally at least a minimum of one foot beyond the bottom edge of footing for every one foot of over excavation depth required below the footing.
Temporary Shoring Temporary shoring of excavations may be required for this project. Any temporary shoring systems should be designed by a registered professional engineer.
Frozen Materials If construction occurs during temperatures below freezing, the base of all excavations and backfill materials should be protected from freezing. Excavated surfaces which become frozen should be completely thawed prior to placing backfill, concrete, or pavements. If freezing has loosened and reduced the bearing capacity of the excavation surface, remove the frozen material to the undisturbed surface. Frozen material should not be used as backfill.
Observation - Excavations Excavation bottoms and engineered fill operations should be observed by a geotechnical engineer or a designated representative to assure that the recommendations in this report are being followed. In-place density testing should be performed to document that project specifications are met.
Observation - Foundations Installation of foundations should be observed and documented by a qualified technician or engineer.
We recommend that at a minimum, concrete be tested for air content, temperature, slump, and compressive strength.
Frequency of Testing
For this project, we recommend a minimum density testing frequency of one test per 1,000 square feet of backfill area per lift. If the project area is smaller than this, we recommend a minimum of one test per lift. For isolated locations or questionable areas, we recommend a minimum of one test per occasion.
General
If you have any questions regarding our results, or if we may be of further service on this project, please call us at 715.392.7114.
17M7972 Page 6 of 6
Twin Ports Testing II, Inc.
Brett Carlson
Project Engineer
Michael A. Haapala, PE
Principal Engineer
Attachments:
Boring Location Sketch (1 Page)
Boring Logs (2 Pages)
Boring Log Notes (2 Pages)
N
Approximate Boring Location
DRAWN BY: CHECKED BY:
DATE: SCALE:
DRAWING NO:
TPT PROJECT NO:
DRAWING NO:
1/1
REV:
BMC MAH
10/8/18 N/A
17M7972S-01
17M7972S
A
BORING LOCATION SKETCH
Trail D Sites TR 63-1 and T1T2
Town of Drummond
Bayfield County, Wisconsin
T win
P orts
T esting
Pot Lake
T1T2
TR 63-1
Trail D
SS
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
12.0
14.0
19.0
26.0
(FILL) Silty Sand with gravel, trace clay, fine to coarse grained, brown, moist (AASHTO A-2-4)
(SC) CLAYEY SAND, fine to medium grained, brown, wet, medium dense (AASHTO A-4)
(SM) SILTY SAND, fine to coarse grained, brown, wet, loose
(AASHTO A-2-4)
(SM) SILTY SAND with Gravel, fine to coarse grained, brown, waterbearing (AASHTO A-2-4)
Boring then backfilled with bentonite End of Boring
CLIENT:
DSR T1T2-Trail-D
PROJECT:
9/27/18
NE WD
Autohammer
CAVE IN LEVELWATER LEVEL
SITE LOCATION:
WSP USA
RIGSPT HAMMER
None Encountered
BORING STARTED
CREW CHIEF
Lou Dinnan
WATER LEVEL
WSP USA Drummond, Wisconsin
ARCHITECT - ENGINEER:
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES
IN-SITU, THE TRANSITION MAY BE GRADUAL.
09/17/18 09/17/18
REPORT DATE:
D-120
WATER LEVEL BORING COMPLETED ABBREVIATIONS: ACR-After Casing Removal, BCR-Before Casing Removal, AB-After Boring, WD-While Drilling, WS-While Sampling, NE-None Encountered, DB-Diamond Bit, HSA-Hollow Stem Auger, RB-Rock Bit, SS-Split Spoon, ST-Shelby Tube, PA-Power Auger, MR-Mud Rotary, CS-Continuous, RP-Rock Probe, PH-Percussion Hammer, WL-Water Level, WOH-Weight of Hammer, EIL-Exceeds Instrument Level, TS-Topsoil, PP-Pocket Penetrometer
17M7972S
SA
M
PL
E
N O
D
EP
TH
(f t)
EL
EV
AT
IO
N
(f t)
0.0
10.0
20.0
30.0
SA
M
PL
E
D
IS
TA
N
C E
PLASTIC
LIMIT %
TPT Project No.:
UNCONFINED COMPRESSIVE STRENGTH (TONS/FT2)
PERCENT PASSING #200 SIEVE
10 20 30 40 50
1 2 3 4 5
10 20 30 40 50
T1T2
See Boring Location Sketch
R
EC
O
VE
R Y
10 20 30 40 50
DESCRIPTION OF MATERIAL
WATER
CONTENT %
LIQUID
LIMIT %
W
AT
ER
L
EV
EL
SA
M
PL
E
TY
PE
BORING LOCATION:
BORING LOG
STANDARD PENETRATION TEST N-VALUE
BOREHOLE LOG 17M7972S T1T2.GPJ TWINPORT.GDT 10/8/18
G R
AP
H
IC
L
O G
SURFACE ELEVATION:
ST
R
AT
A
C H
AN
G
E D
EP
TH
SS
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
HSA
SS
2.0
11.0
32.0
38.0
41.0
(FILL) Silty Sand with gravel, fine to coarse grained, dark brown, moist (AASHTO A-2-4) (FILL) Clayey Sand with gravel, fine to coarse grained, brown, moist (AASHTO A-4)
(CLS) SANDY LEAN CLAY, trace gravel, brown, wet to waterbearing, medium to stiff (AASHTO A-6)
(SC) CLAYEY SAND, fine to medium grained, brown, waterbearing, medium dense (AASHTO A-4)
(SM) SILTY SAND, fine to medium grained, brown, waterbearing, medium dense (AASHTO A-2-4)
Boring then backfilled with bentonite End of Boring
CLIENT:
DSR TR63-1
PROJECT:
9/27/18
15 ft WD
Autohammer
CAVE IN LEVELWATER LEVEL
SITE LOCATION:
WSP USA
RIGSPT HAMMER
None Encountered
BORING STARTED
CREW CHIEF
Lou Dinnan
WATER LEVEL
WSP USA Drummond, Wisconsin
ARCHITECT - ENGINEER:
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES
IN-SITU, THE TRANSITION MAY BE GRADUAL.
09/17/18 09/17/18
REPORT DATE:
D-120
WATER LEVEL BORING COMPLETED ABBREVIATIONS: ACR-After Casing Removal, BCR-Before Casing Removal, AB-After Boring, WD-While Drilling, WS-While Sampling, NE-None Encountered, DB-Diamond Bit, HSA-Hollow Stem Auger, RB-Rock Bit, SS-Split Spoon, ST-Shelby Tube, PA-Power Auger, MR-Mud Rotary, CS-Continuous, RP-Rock Probe, PH-Percussion Hammer, WL-Water Level, WOH-Weight of Hammer, EIL-Exceeds Instrument Level, TS-Topsoil, PP-Pocket Penetrometer
17M7972U
SA
M
PL
E
N O
D
EP
TH
(f t)
EL
EV
AT
IO
N
(f t)
0.0
10.0
20.0
30.0
40.0
SA
M
PL
E
D
IS
TA
N
C E
PLASTIC
LIMIT %
TPT Project No.:
UNCONFINED COMPRESSIVE STRENGTH (TONS/FT2)
PERCENT PASSING #200 SIEVE
10 20 30 40 50
1 2 3 4 5
10 20 30 40 50
TR63-1
See Boring Location Sketch
R
EC
O
VE
R Y
10 20 30 40 50
DESCRIPTION OF MATERIAL
WATER
CONTENT %
LIQUID
LIMIT %
W
AT
ER
L
EV
EL
SA
M
PL
E
TY
PE
BORING LOCATION:
BORING LOG
STANDARD PENETRATION TEST N-VALUE
BOREHOLE LOG 17M7972U DSR TR63-1.GPJ TWINPORT.GDT 10/8/18
G R
AP
H
IC
L
O G
SURFACE ELEVATION:
ST
R
AT
A
C H
AN
G
E D
EP
TH
BORING LOG NOTES
Water Level Water levels indicated on the boring logs are as measured at stated times. In clean sand soils, the elevations indicated are considered relatively reliable levels. However, in less permeable soils, even after several days of monitoring, accurate determinations may not be possible. Therefore, additional/alternative methods of groundwater elevation monitoring should be sought.
Commonly Used Moisture Conditions of Soils Term Meaning Dry Requires the addition of considerable moisture to attain optimum for compaction Moist Near optimum moisture for compaction Wet Requires drying to attain optimum moisture for compaction Waterbearing Saturated granular soils
Gradation Description and Terminology Soil Type Particle Name Size Range Coarse Grained Soils Boulders Over 12”
Cobbles 3”-12” Gravels #4-3” Gravels – Coarse ¾”-3” Gravels – Fine #4-¾” Sands #200-#4 Sands – Coarse #10-#4 Sands – Medium #40-#10 Sands – Fine #200-#40
Fine Grained Soils Silt 0.005 mm-#200 Clay Less than 0.005 mm
Descriptive Terms of Components Present in Sample (other than ASTM D 2487) Term Percent of Dry Weight Trace 1-5% With 5-12% Some 12-30% And 30-50%
Relative Density of Granular Soils N-Value (SPT) Relative Density Standard “N” Penetration 0-4 Very Loose Blows per foot of a 140 pound hammer 5-10 Loose falling 30” on a 2” outside diameter 11-30 Medium Dense split barrel sampler 31-50 Dense Over 50 Very Dense
Consistency of Cohesive Soils N-Value (SPT) Consistency (Q, tsf or kg/cm2) 0-2 Very Soft Less than 0.25 3-4 Soft 0.25-0.50 5-8 Medium 0.50-1.00 9-15 Stiff 1.00-2.00 16-30 Very Stiff 2.00-4.00 Over 30 Hard 4.00-8.00
UNIFIED SOIL CLASSIFICATION SYSTEM – ASTM D 2487
| Sheets and Views |
| Trail Site Sketch-Layout1 |
File details come from the government source that posted it.