PRELIMINARY COPY
March 22, 2016
Dear Mr. :
SUBJECT: USTS Kennedy
Main Propulsion Low Pressure Turbine
Purchase Order No.:
Reference No.: 167466-002
Attached please find a copy of a report delineating the conditions found on the Low Pressure Turbine
Casing. Also included are the recommended repairs required to ensure the integrity of the subject
Low Pressure Turbine is maintained.
If any questions are generated concerning this report or if MI-TECH, INC. can be of further service, please contact Mr. Jake Duvall, Onsite Field Service Supervisor; Mr. Robert Mimms, Contract
Administrator or the undersigned immediately.
Sincerely, William J. Totten
President cc: Mr. Edward J. Duvall Field Service Supervisor MI-TECH, INC.
Mr. David Sharbo Quality Assurance Director MI-TECH, INC
MI-TECH, INC.
TECHNICAL CONSULTING AND MACHINE SHOP SERVICES
TECHNICAL REPORT
T Mr. W. J. Totten C
O MI-TECH, Inc. C . C
Reference Number 167466-002
Type of Report Condition
Manufacturer Delaval
Page
Customer Name
Customer Reference or Purchase Order Number
Date of Report
Work Location Buzzards Bay MA.
Equipment Description and/or Number
Field Service Supervisor E. J. Duvall
The following report details the conditions found on the Low Pressure Turbine Casing. Also included are the recommended repairs required to ensure the integrity of the subject Low Pressure Turbine is maintained.
I. Conditions Found.
A. Turbine Casing.
1. The internal casing has five casing supports per half extending between the components of inlet section that appear to have multiple linear indications that are completely through the strut.
a) The lower casing port side strut has been cut out completely and the bottom and two struts on the starboard side appear to be cracked through.
b) The upper casing starboard side strut adjacent to the joint also appears to be cracked completely through.
(1) The access to the inlet chamber in the casings current position makes inspection difficult but it appears that the other four support struts in the upper casing are intact.
c) Documentation has been found that indications were noted during a previous inspection conducted in 2002.
II. Recommended Repairs.
A. Turbine Casing.
1. The work scopes required to weld repair the struts are quite extensive and would likely delay the ships scheduled activities. In as much as it is evident that the ship has been operating with these damaged struts for the last fifteen years, It is this writers opinion that the repairs be postponed until the vessels scheduled dry docking in 2017.
T Mr. W. J. Totten C C
O MI-TECH, Inc. C . C
III. Photographic Record.
Lower Casing Starboard Side
O MI-TECH, Inc. C . C
Lower Casing Second Strut Port Side
O MI-TECH, Inc. C . C
Upper Casing Starboard Side