About this file

This document contains answers to contractor questions regarding solicitation number 6933A220Q000017 for dry docking and repairs of a James River Reserve Fleet FB-211 Crane Barge. The Maritime Administration intends to deliver the barge to the contractor's facility within 30 nautical miles of the James River Reserve Fleet within three days of notice to proceed. The questions and answers clarify requirements for hull ultrasound testing, cleaning and painting, fuel tank and deck light removal, and electrical work. Specifically, ultrasound testing will require 75 readings in each of five hull belts. Painting will address the underwater hull, freeboard, and draft marks. Piping and wiring are to be removed flush with the deck and blanks installed. Deck replacement material sizes were not provided but are estimated to be 1/2 inch plate.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

6933A220Q000017 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

6933A2

NORFOLK VA 23505

7737 HAMPTON BLVD BLDG 19 STE 300

DIVISION OF ATLANTIC OPERATIONS

MARITIME ADMINISTRATION

05/27/20200002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/06/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is issued to answer questions submitted upon conclusion of the site visit conducted on 21 May 2020.

(See attached)

Period of Performance: 06/18/2020 to 10/30/2020

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

WILLIAM A. WILE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

5/27/2020 william.wile New Stamp

1. Item 2: Dry Docking – the item says that, “Docking blocks shall be arranged per Government furnished docking plan”. Please provide the vessels docking plan.

This item was included in error. We do not have a docking plan for this barge.

2. Item 5: Hull UT Survey – the item says, “Take and record seventy five (75) random UT readings as designated by MARAD COR, of shell plates in five (5) belts at even intervals along the length of the hull”. Please clarify, is this 75 reading total? Or 75 reading in each belt?

75 each belt.

3. Item 6: Hull Cleaning and Painting – the item says, “High pressure wash (3,500 psi) using a sweep nozzle the entire hull including the rudder, from the keel up to and including the bulwarks”. The barge does not have bulwarks installed. The contractor recommends removing this requirement.

Concur

4. Item 6: Hull Cleaning and Painting – the item says, “mask the rubber fendering”. The barge does not have rubber fendering that could be seen from inspection. Contractor recommends removing this requirement.

Concur

5. Item 6: Hull Cleaning and Painting – the item says, “B. Freeboard from waterline to top of rail”. As the barge does not have a bulwark, the “top of the rail” does not apply. This contractor recommends a change to, ”the main deck edge”.

Concur

6. Item 6: Hull Cleaning and Painting – This contractor would like to have the government verify that the hull cleaning and painting addresses the underwater hull to waterline, the freeboard area from waterline to main deck edge and the draft marks only. Please verify.

The items listed above and the barge name and hailing port – “JR-1”, “ James River Reserve Fleet”- as currently marked in 8” white letters on the stern and “JR-1” on each side of the bow

7. Item 8: Fuel Tank – The fuel tank has an overflow pipe that protrudes through the main deck in the containment area. What is the contractor has to disconnect his pipe to remove the fuel tank. What does the government want the contractor to do with the overflow pipe?

Cut all piping flush with deck and blank with suitable welded steel blank

8. Item 9: Deck Replacement (OPTIONAL) – The government has not specified the type of preservation system to be applied to the new and disturbed steel in way of the deck replacement. Please provide preservation requirements.

Blast and prime with primer compatible to pain schedule. apply one (2) coats @ 2.5 mil DFT, PPG Amercoat 229T, color Deck Red or acceptable equivalent

9. Item 9: Deck Replacement (OPTIONAL) – The government has not provided scantling drawings of the main deck and under deck structure to determine the size of steel plate and structural steel required to be replaced. Please provide the drawings or indicate the size and types of steel plate and structural steel required.

We do not possess drawings indicating scantlings. Believe deck plating to be ½”. Uncertain of size or condition of materials in underdeck structure.

10. Item 10: Deck Light Stanchion Removal (OPTIONAL) – The centerline deck light stanchion has electrical wire and kick pipes protruding from the deck. What does the government want the contractor to do with the wire and kick pipes?

Ensure wires are safely isolated and pull below deck level. Remove kick pipes flush with deck and blank with a suitable welded steel blank

11. Item 11: Electrical Panel board Removal (OPTIONAL) – The electrical panel has several wire kick pipe protruding from the deck. What does the government want the contractor to do with the kick pipes?

Ensure wires are safely isolated and pull below deck level. Remove kick pipes flush with deck and blank with a suitable welded steel blank