(x) x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
NORFOLK VA 23505-1204
BUILDING 19 SUITE 300
MARAD-00092
7737 HAMPTON BLVD
MAR-380-2
ATLANTIC ACQUISITION OFFICE
US DOT MARITIME ADMINISTRATION
01/24/2020
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended,
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION
NO.
6933A220Q000005
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/11/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Monique Leake
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment to the Request for Quotation (RFQ) is to respond to omitted questions from potential offerors, provide revised Statement of Work, revised Quote Pricings Sheet, and extend the solicitation due date to Tuesday, February 04, 2020.
Period of Performance: 03/01/2020 to 05/01/2020
In order for an invoice to be processed for payment, it must include your Federal ID Number, Purchase Order Number, and Invoice Number. Without these numbers, your invoice will be returned and payment will be delayed.
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
x
6933A220Q000005 – Amendment 0003 TS KENNEDY – FY20 Drydocking and ABS Intermediate Survey Response to Questions from Potential Offerors
Question Answer
1. In the ABSTRACT section of the item states to refill with IFO 180. Statement of work does say to return fuel after inspection.
With that much fuel onboard, the storage fee is going to be very costly?
Please see the clarified language in the SOW. It is the INTENT of this item for the contractor to Remove and/or transfer the "Fuel Onboard in Barrels" listed in Location / Description section of the SOW in order to perform the required inspections and return the fuel to the tank after inspections.
The fuel onboard listed in the SOW is an estimate; actual quantities will be determined by sounding at vessel delivery.
It is unknown exactly what tanks will require inspection until the exterior waterborne hull is inspected. It is believed that the ship will arrive at the shipyard with adequate space in the existing tank to transfer the fuel with in the ship to perform the inspections. To aid in moving of the fuel, the shipyard may consider providing shore steam to the ship and using the in-tank heating coils to heat the fuel. (This steam heating is not included in ITEM 129)
2. IFO 180 is no longer available in this market. Will you except MDO less than 0.5% sulfur product?
It is not the intent of this item to replace any fuel. All slops and cleaning byproducts shall be disposed of at the contractor’s expense and included in the item pricing.
3. Concerning the ISO 180 fuel, the price to store the fuel with a barge will be very costly. Is there any way you can tell me which tanks are going to be required to be cleaned? ISO fuel is very thick.
See Question 1
4. The drawings that was stated to use in Amend 0002, question 16, doesn’t show any of the overboards stated in the spec. Need drawing #156-548-23-3- Overboard & Shell Penetrations.
Need to know what size pipe, is it going to be replaced to the first flange, new detail drawing of what kind of hull penetration.
Is there any other drawings that shows the overboards stated in the spec item #303?
The DRW listing does not exist. Please use DRW# 172-
S48-23-03BC OVERBOARD DISCHARGE SHELL EXPANSION
& LIST OF SEA VALVES and 156_S48_23_15 OVBD DISCH included amendment 2.
6933A220Q000005 – Amendment 0003 TS KENNEDY – FY20 Drydocking and ABS Intermediate Survey Response to Questions from Potential Offerors
5. I’m a little confused with item 417- Amend 002 question #23 answer is that the scope of work for the item is only overhaul of the hydraulic pump and motors and not do anything to the hinges.
The item says to disconnect the hydraulic lines from the hinges, install new spare hinges. Will the hinge work be priced as an additional if needed to work?
The INTENT of this item is to install the ships spare Hydrotorque hinges in the hatches listed. These hinges we overhauled in a previous maintenance availability. In addition to the installation of the hinges, “The Contractor shall remove the hydraulic pump/motor and control valves from the hatch, the pump/motor and control valves shall be overhauled at an approved hydraulic ship familiar with the equipment and controls”
6. Will the government consider alternative repair proposals for the Afterpeak tank top?
Yes, the government is working with ABS and USCG on the possibility of using a system of panel breakers (intercostal stiffeners) to affect a permanent repair. The contractor is required to bid this item as written.
Alternative repair process shall be detailed in the contractor’s technical approach to the ITEM.
| ADPA74A.tmp |
| 15TTable of Contents |
| GENERAL PROVISIONS |
| ABBREVIATIONS/DEFINITIONS |
| EXPANDED DEFINITIONS |
| GOVERNMENT FURNISHED |
| CONTRACTING OFFICER'S REPRESENTATIVE (COR) |
| GOOD SHIPBUILDING PRACTICE |
| QUALITY ASSURANCE |
| SOLE SOURCE/BID SUBSTITUTIONS |
| CONFLICTS - SPECIFICATIONS/DRAWINGS |
| INTENT AND GENERAL SPECIFICATION REQUIREMENTS |
| GENERAL |
| ERRORS/OMISSIONS |
| SPECIFICATIONS IN EXCESS |
| MANUFACTURER'S REPS |
| CERTIFICATION/DOCUMENTATION |
| GENERAL VESSEL DESCRIPTION |
| DRAWING, CORRESPONDENCE, AND COMMUNICATION PROCEDURES |
| LAWS, CLASSIFICATION, RULES, REGULATIONS, STANDARDS, CERTIFICATES |
| COMPLIANCE |
| DOCUMENTATION |
| PROGRESS MEETINGS AND PROGRESS REPORT |
| CONTRACT AND GUIDANCE DRAWINGS |
| GENERAL |
| EXISTING VESSEL INFORMATIONAL DRAWINGS |
| INTERFERENCES/ACCESS |
| HEADROOM |
| ACCESS & MAINTENANCE REQUIREMENTS |
| GENERAL |
| ASBESTOS /VENDORS /SUBCONTRACTORS |
| ASBESTOS ABATEMENT |
| VENDOR LISTING |
| ACCESS TO YARD/VESSEL/DOCUMENTS (IF APPLICABLE) |
| ACCESS TO YARD/VESSEL |
| ACCESS TO DOCUMENTS |
| INSPECTIONS |
| GENERAL |
| SCHEDULING & ATTENDANCE |
| PREPARATIONS |
| COVERINGS |
| RE-INSPECTIONS |
| COMPARTMENT COMPLETIONS |
| PROSECUTION OF WORK |
| STARTING DATE FOR PROJECTS |
| SCHEDULE REQUIREMENTS |
| GANTT CHART |
| CRITICAL PATH METHOD (CPM) SCHEDULE |
| PROGRESS REVIEW MEETINGS |
| GUARANTEES |
| MATERIALS AND WORKMANSHIP |
| MATERIAL GENERAL |
| WORKMANSHIP GENERAL |
| MATERIAL MILITARY SPECS |
| STORAGE/PROTECTION |
| CONTRACTOR'S OBLIGATION |
| HULL PROTECTION |
| WELDING |
| GENERAL INFORMATION |
| DRAWING REFERENCES AND SITE VISIT |
| Liquidated Damages |
| (a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $11,050.00 per calendar day of delay. |
| (b) If the Government terminates this contract in whole or in part under 52.212-4(m), Termination for Cause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies o... |
| (c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor. Examples of such causes include (1) acts of God or of the public ene... |
| AVAILABILITY AND PERFORMANCE PERIOD |
| SECTION 100: GENERAL SERVICES REQUIREMENTS |
| ITEM 101 APPLICABILITY OF RULES AND REGULATION |
| ABSTRACT: |
| REFERENCES: |
| LOCATION / DESCRIPTION: |
| NOTES: |
| STATEMENT OF WORK: |
| PERFORMANCE CRITERIA / DELIVERABLES: |
| ITEM 102 ACCURACY OF INFORMATION |
| ABSTRACT |
| REFERENCES: |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 103 SECURITY |
| ABSTRACT |
| REFERENCES: |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 104 FIRE PROTECTION AND SAFETY |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 105 OFFICE AND ADMINISTRATIVE SERVICES |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 106 WHARFAGE |
| ABSTRACT |
| REFERENCES: |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 107 SURVEYS AND INSPECTIONS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 108 ON-SITE CONTRACTOR'S REPRESENTATIVE |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 109 DOCUMENTATION OF OPENINGS, BLANKS AND PLUGS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 110 ALLOWANCE FOR SCRAP MATERIAL |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 111 MAINTAIN SHIP'S LIGHTING |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 112 HAZARDOUS MATERIALS IDENTIFICATION AND DISPOSAL |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 113 USE OF SHIP'S PARTS AND EQUIPMENT |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 114 PROVIDE SHORE POWER |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 115 DISABLE CO2 AND HALON SYSTEMS. |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 116 MAINTAINING SHIP'S CLEANLINESS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 117 MAINTAIN CLEAN BILGES AND DRAIN WELLS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 118 PROTECTIVE FLOOR COVERING |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 119 SURFACE PREPARATION AND PAINTING/COATING GUIDELINE |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 120 SAFE FOR ENTRY AND SAFE FOR HOT WORK CERTIFICATES |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 121 PRODUCTION REPORTING |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 122 CRANE SERVICE |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 123 STAGING |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 124 OIL BOOM |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| ITEM 125 WELDING / BRAZING PROCEDURES |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 126 SOUNDINGS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 127 SANITARY SYSTEM |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 128 WASTE WATER AND OILS |
| ABSTRACT |
| REFERENCES |
| ITEM LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 129 SHORE STEAM |
| ABSTRACT |
| REFERENCES |
| ITEM LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLE |
| ITEM 130 PORTABLE TOILETS/TEMPORARY FACILITIES |
| ABSTRACT |
| REFERENCES |
| ITEM LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| SECTION 200: DRY-DOCKING REQUIREMENTS |
| ITEM 201 DRY DOCK SHIP |
| ABSTRACT |
| REFERENCES / ENCLOSURES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 202 TAILSHAFT EXAMINATION |
| ABSTRACT |
| REFERENCES / ENCLOSURES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 203 OPEN AND INSPECT LINE SHAFT BEARINGS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 204 RUDDER PINTLE AND BEARING CLEARANCES |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 205 RUDDER TEST |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 206 SEA CHESTS AND OVERBOARD HULL PENETRATIONS |
| ABSTRAC |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 207 SEA VALVES |
| ABSTRACT |
| REFERENCES / ENCLOSURES: |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 208 BLASTING & COATING OF HULL |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 209 ULTRASONIC THICKNESS GAUGINGS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 210 PROPELLER CLEANING AND INSPECTION |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 211 FATHOMETER TRUNKS AND SPEED LOG |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 212 ANCHOR CHAINS & LOCKERS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 213 ZINC ANODES |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 214 CATHODIC PROTECTION SYSTEM |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 215 BOW THRUSTER |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 216 BILGE COATINGS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 217 CROP AND RENEW SIDE FRAMES #135 to 139 TANK TOP LEVEL PORT SIDE. |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 218 LIFEBOAT FUEL TANK REPLACEMENT |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| Clean all interior and exterior surfaces of the lifeboat. |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 219 MACHINERY VENTILATION SYSTEM; REPAIR |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| SECTION 300: OPTIONAL AND UNIT PRICED ITEMS |
| ITEM 301 TOW SHIP FROM MASSACHUSETTS MARITIME TO DRY DOCK (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 302 MOVE SHIP FROM PILOT STATION AND PLACE IN DRY DOCK (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 303 SHIFT TO WET LAYBERTH FOLLOWING DRY DOCKING (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| ITEM 304 PROVIDE WET LAY BERTH (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 305 TOW SHIP FROM DRY DOCK BACK TO BUZZARDS BAY, MA (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 306 SUPPLEMENTAL LABOR (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 307 SUPPLEMENTAL MATERIAL (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 308 SUPPLEMENTAL STEEL (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 309 BOW THRUSTER REFURBISHMENT (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 310 AUDIO GAUGINGS ADDITIONAL (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 311 RELOCATE SPARE PROPELLER BLADES FROM AFTER MAIN DECK TO HOLD#2 (OPTIONAL ) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 312 SWITCHBOARDS, LOAD CENTERS/POWER PANELS; CLEAN, INSPECT AND REPAIR (OPTIONAL ) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 313 REPLACE RUBBER SCUPPER EXTENSIONS (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 314 HYDROTORQUE HINGE OVERHAUL (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 315 HYDROTORQUE HINGE REMOVAL AND REINSTALLATION (OPTIONAL ) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 316 CROP AND RENEW HAND RAILS, STANCHIONS AND SEA-RAILS (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 317 REPLACE SALT WATER FLUSHING PIPING THAT FEEDS THE AFTER HOUSE WITH CuNi (OPTIONAL ) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 318 FOREPEAK TANK PRESERVATION (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| QUALITY ASSURANCE REQUIREMENTS |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 319 AFTER PEAK TANK PRESERVATION (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| QUALITY ASSURANCE REQUIREMENTS |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 320 ASBESTOS ABATEMENT, ABANDONED PIPE REMOVAL, STEAM HEATING PIPE REPLACEMENT AND INSULATION. (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ADPCCE5.tmp |
| 15TTable of Contents |
| GENERAL PROVISIONS |
| ABBREVIATIONS/DEFINITIONS |
| EXPANDED DEFINITIONS |
| GOVERNMENT FURNISHED |
| CONTRACTING OFFICER'S REPRESENTATIVE (COR) |
| GOOD SHIPBUILDING PRACTICE |
| QUALITY ASSURANCE |
| SOLE SOURCE/BID SUBSTITUTIONS |
| CONFLICTS - SPECIFICATIONS/DRAWINGS |
| INTENT AND GENERAL SPECIFICATION REQUIREMENTS |
| GENERAL |
| ERRORS/OMISSIONS |
| SPECIFICATIONS IN EXCESS |
| MANUFACTURER'S REPS |
| CERTIFICATION/DOCUMENTATION |
| GENERAL VESSEL DESCRIPTION |
| DRAWING, CORRESPONDENCE, AND COMMUNICATION PROCEDURES |
| LAWS, CLASSIFICATION, RULES, REGULATIONS, STANDARDS, CERTIFICATES |
| COMPLIANCE |
| DOCUMENTATION |
| PROGRESS MEETINGS AND PROGRESS REPORT |
| CONTRACT AND GUIDANCE DRAWINGS |
| GENERAL |
| EXISTING VESSEL INFORMATIONAL DRAWINGS |
| INTERFERENCES/ACCESS |
| HEADROOM |
| ACCESS & MAINTENANCE REQUIREMENTS |
| GENERAL |
| ASBESTOS /VENDORS /SUBCONTRACTORS |
| ASBESTOS ABATEMENT |
| VENDOR LISTING |
| ACCESS TO YARD/VESSEL/DOCUMENTS (IF APPLICABLE) |
| ACCESS TO YARD/VESSEL |
| ACCESS TO DOCUMENTS |
| INSPECTIONS |
| GENERAL |
| SCHEDULING & ATTENDANCE |
| PREPARATIONS |
| COVERINGS |
| RE-INSPECTIONS |
| COMPARTMENT COMPLETIONS |
| PROSECUTION OF WORK |
| STARTING DATE FOR PROJECTS |
| SCHEDULE REQUIREMENTS |
| GANTT CHART |
| CRITICAL PATH METHOD (CPM) SCHEDULE |
| PROGRESS REVIEW MEETINGS |
| GUARANTEES |
| MATERIALS AND WORKMANSHIP |
| MATERIAL GENERAL |
| WORKMANSHIP GENERAL |
| MATERIAL MILITARY SPECS |
| STORAGE/PROTECTION |
| CONTRACTOR'S OBLIGATION |
| HULL PROTECTION |
| WELDING |
| GENERAL INFORMATION |
| DRAWING REFERENCES AND SITE VISIT |
| Liquidated Damages |
| (a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $11,050.00 per calendar day of delay. |
| (b) If the Government terminates this contract in whole or in part under 52.212-4(m), Termination for Cause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies o... |
| (c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor. Examples of such causes include (1) acts of God or of the public ene... |
| AVAILABILITY AND PERFORMANCE PERIOD |
| SECTION 100: GENERAL SERVICES REQUIREMENTS |
| ITEM 101 APPLICABILITY OF RULES AND REGULATION |
| ABSTRACT: |
| REFERENCES: |
| LOCATION / DESCRIPTION: |
| NOTES: |
| STATEMENT OF WORK: |
| PERFORMANCE CRITERIA / DELIVERABLES: |
| ITEM 102 ACCURACY OF INFORMATION |
| ABSTRACT |
| REFERENCES: |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 103 SECURITY |
| ABSTRACT |
| REFERENCES: |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 104 FIRE PROTECTION AND SAFETY |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 105 OFFICE AND ADMINISTRATIVE SERVICES |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 106 WHARFAGE |
| ABSTRACT |
| REFERENCES: |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 107 SURVEYS AND INSPECTIONS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 108 ON-SITE CONTRACTOR'S REPRESENTATIVE |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 109 DOCUMENTATION OF OPENINGS, BLANKS AND PLUGS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 110 ALLOWANCE FOR SCRAP MATERIAL |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 111 MAINTAIN SHIP'S LIGHTING |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 112 HAZARDOUS MATERIALS IDENTIFICATION AND DISPOSAL |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 113 USE OF SHIP'S PARTS AND EQUIPMENT |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 114 PROVIDE SHORE POWER |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 115 DISABLE CO2 AND HALON SYSTEMS. |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 116 MAINTAINING SHIP'S CLEANLINESS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 117 MAINTAIN CLEAN BILGES AND DRAIN WELLS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 118 PROTECTIVE FLOOR COVERING |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 119 SURFACE PREPARATION AND PAINTING/COATING GUIDELINE |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 120 SAFE FOR ENTRY AND SAFE FOR HOT WORK CERTIFICATES |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 121 PRODUCTION REPORTING |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 122 CRANE SERVICE |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 123 STAGING |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 124 OIL BOOM |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| ITEM 125 WELDING / BRAZING PROCEDURES |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 126 SOUNDINGS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 127 SANITARY SYSTEM |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 128 WASTE WATER AND OILS |
| ABSTRACT |
| REFERENCES |
| ITEM LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 129 SHORE STEAM |
| ABSTRACT |
| REFERENCES |
| ITEM LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLE |
| ITEM 130 PORTABLE TOILETS/TEMPORARY FACILITIES |
| ABSTRACT |
| REFERENCES |
| ITEM LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| SECTION 200: DRY-DOCKING REQUIREMENTS |
| ITEM 201 DRY DOCK SHIP |
| ABSTRACT |
| REFERENCES / ENCLOSURES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 202 TAILSHAFT EXAMINATION |
| ABSTRACT |
| REFERENCES / ENCLOSURES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 203 OPEN AND INSPECT LINE SHAFT BEARINGS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 204 RUDDER PINTLE AND BEARING CLEARANCES |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 205 RUDDER TEST |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 206 SEA CHESTS AND OVERBOARD HULL PENETRATIONS |
| ABSTRAC |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 207 SEA VALVES |
| ABSTRACT |
| REFERENCES / ENCLOSURES: |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 208 BLASTING & COATING OF HULL |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 209 ULTRASONIC THICKNESS GAUGINGS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 210 PROPELLER CLEANING AND INSPECTION |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 211 FATHOMETER TRUNKS AND SPEED LOG |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 212 ANCHOR CHAINS & LOCKERS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 213 ZINC ANODES |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 214 CATHODIC PROTECTION SYSTEM |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 215 BOW THRUSTER |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 216 BILGE COATINGS |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 217 CROP AND RENEW SIDE FRAMES #135 to 139 TANK TOP LEVEL PORT SIDE. |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 218 LIFEBOAT FUEL TANK REPLACEMENT |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| Clean all interior and exterior surfaces of the lifeboat. |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 219 MACHINERY VENTILATION SYSTEM; REPAIR |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| SECTION 300: OPTIONAL AND UNIT PRICED ITEMS |
| ITEM 301 TOW SHIP FROM MASSACHUSETTS MARITIME TO DRY DOCK (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 302 MOVE SHIP FROM PILOT STATION AND PLACE IN DRY DOCK (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 303 SHIFT TO WET LAYBERTH FOLLOWING DRY DOCKING (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| ITEM 304 PROVIDE WET LAY BERTH (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 305 TOW SHIP FROM DRY DOCK BACK TO BUZZARDS BAY, MA (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 306 SUPPLEMENTAL LABOR (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 307 SUPPLEMENTAL MATERIAL (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 308 SUPPLEMENTAL STEEL (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 309 BOW THRUSTER REFURBISHMENT (OPTIONAL) |
| ABSTRACT |
| REFERENCES |
| LOCATION / DESCRIPTION |
| NOTES |
| STATEMENT OF WORK |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 310 AUDIO GAUGINGS ADDITIONAL (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 311 RELOCATE SPARE PROPELLER BLADES FROM AFTER MAIN DECK TO HOLD#2 (OPTIONAL ) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 312 SWITCHBOARDS, LOAD CENTERS/POWER PANELS; CLEAN, INSPECT AND REPAIR (OPTIONAL ) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 313 REPLACE RUBBER SCUPPER EXTENSIONS (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 314 HYDROTORQUE HINGE OVERHAUL (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 315 HYDROTORQUE HINGE REMOVAL AND REINSTALLATION (OPTIONAL ) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 316 CROP AND RENEW HAND RAILS, STANCHIONS AND SEA-RAILS (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 317 REPLACE SALT WATER FLUSHING PIPING THAT FEEDS THE AFTER HOUSE WITH CuNi (OPTIONAL ) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 318 FOREPEAK TANK PRESERVATION (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| QUALITY ASSURANCE REQUIREMENTS |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 319 AFTER PEAK TANK PRESERVATION (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| QUALITY ASSURANCE REQUIREMENTS |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |
| ITEM 320 ASBESTOS ABATEMENT, ABANDONED PIPE REMOVAL, STEAM HEATING PIPE REPLACEMENT AND INSULATION. (OPTIONAL) |
| ABSTRACT |
| REFERENCE |
| ITEM LOCATION / DESCRIPTION |
| NOTE |
| STATEMENT OF WORK REQUIRED |
| PERFORMANCE CRITERIA / DELIVERABLES |