6933A220Q000005 - Attachment 1 Revised (2) Quote Pricing Sheet.xlsx

XLSX spreadsheet 417 KB Posted

Attached to
T. S. KENNEDY - FY20 Drydocking Repairs and ABS Intermediate Survey
Solicitation number
6933A220Q000005-0002
Issued by

About this file

This document contains a revised quote pricing sheet for a solicitation from the Department of Transportation Maritime Administration for drydocking repairs and ABS intermediate survey services for the T.S. Kennedy.

The pricing sheet lists various repair and inspection items to be provided including general services, drydocking requirements, repair items, and optional items. Pricing is included for individual line items as well as total proposed pricing. The scope of work involves internal structural exams and testing of fuel, ballast, feedwater and potable water tanks as well as voids and cofferdams. Additional items include tailshaft withdrawal, rudder testing, hull blasting and coating, propeller cleaning and inspection, and steel renewals. Optional items such as supplemental labor, material and steel are also included.

View the file

Other files

File Type Posted
6933A220Q000005 - Attachment 1 Revised Quote Pricing Sheet.xlsx XLSX spreadsheet
540TV-001-524-06, SEAWATER FLUSHING ENGINE ROOM.pdf PDF
156-S11-3-4 FORE PEAK FRAMING.pdf PDF
156-S48-09-72SH SOUNDINGS TUBES & A. E. & OVERFLOWS BETWEEN FR.pdf PDF
156-S11-06-10AB (K) MACHY. SPACE FLAT.pdf PDF
SHELL EXP. AFT 1-5.pdf PDF
156-S11-03-02 FLOORS AFT.pdf PDF
156-S48-23-01 SEA CHESTS - MN. & AUX. STED. SIDE.pdf PDF
156-S12-1-11 AFT MOORING WINCH.pdf PDF
156-S1-03-08 (K) GEN.ARRGT.LOWER TWEEN DK.AFT..pdf PDF
540TV-001-524-05, SEAWATER FLUSHING.pdf PDF
KDY FY DD SOW Revised Markup 1-14-2020.docx DOCX document
156-S11-06-02 (K) LOWER TWEEN DK.AFT..pdf PDF
156-S16-02-01 MANHOLE & HATCH LIST.pdf PDF
172-S48-23-03BC OVERBOARD DISCHARGE SHELL EXPANSION & LIST OF SEA VALVES.pdf PDF
156-S11-06-07 (K) FORECASTLE DK. PLATING & FRAMING.pdf PDF
156-S11-3-5 AFT PEAK FRAMING.pdf PDF
156-S1-03-10 (K) GEN.ARRGT.UPPER TWEEN DK.AFT..pdf PDF
SEA CHESTS - MN. & AUX. STED. SIDE.pdf PDF
156_S48_23_15 OVBD DISCH.pdf PDF
156-S48-09-08MAB SOUNDING TUBES & A.E. & OVERFLOWS BETWEEN FRS. 140-171 L-M.pdf PDF
156-S11-03-09 (K) AFT WEB FRAMES & STRINGERS.pdf PDF
156-S22-1-04- (K) STEERING GEAR ARRGT. & DETS..pdf PDF
Kennedy AMR Seachest-1039-18-S01.pdf PDF
156-S11-05-01 BHDS.22 33 &42.pdf PDF
156-S48-09-73SH SOUNDINGS TUBES & A. E.& OVERFLOWS (BETWEEN FRS. 119-140).pdf PDF
171-S11-1-1 SHELL EXP. FWD.pdf PDF
156-S11-03-02 FLOORS AFT..pdf PDF
6933A220Q000005 Amendment 00002 T.S. KENNEDY FY-20 Drydocking Repairs.pdf PDF
156-S62-02-15 - POWER SYS. POWER OPERATED VALVES ELEM. W.D..pdf PDF
156-S22-0-2 BOW THRUSTER.pdf PDF
540TV-001-514-1 HVAC DUCT ARRANGEMENT & DETAILS.pdf PDF
156-S11-05-07 LONGITUDINAL SHAFT ALLEY&AFT DEEP TANKS BHDS..pdf PDF
156-S11-05-08 (K) MISC. STRUCTURAL SHDS. UT DECK.pdf PDF
156-S11-06-04 (K) UPPER TWEEN DK PLANTING BEAMS & GIRDERS AFT..pdf PDF
156-S48-09-07MAB SOUNDING TUBES & AIR ESCAPES BET. FRS. 119-140.pdf PDF
SHELL EXP. FWD 1-4.pdf PDF
156-S11-01-02 (K) SHELL EXP. AFT.pdf PDF
156-S11-06-09 (K) UPPER DK. PLATNG & FRAMING.pdf PDF
172-S48-09-01BC DIA. ARRGT. SOUNDING TUBES AIR ESCAPES & OVERFLOWS-.pdf PDF
LAKE SHORE- WARPING WINCH.pdf PDF
156-S26-5-2 HAWSEPIPE AND BOLSTERS.pdf PDF
156-S11-08-02 (K) STERN FRAME.pdf PDF
156-S5-00-04 BODY PLAN.pdf PDF
156-S11-05-11 (K) STRUCTUAL TRUNKS A BHD.194.pdf PDF
SEA CHESTS C3-100 S48-23-1 REV 4.pdf PDF
156-S48-09-71 SOUNDINGS TUBES & AIR ESCAPES & OVERFLOWS BET..pdf PDF
156-S11-05-03 BHDS.119 140 143 171 &187.pdf PDF
156-S48-23-02 AUX. SEA CHESTS PORT SIDE.pdf PDF
156-S1-03-06 (K) GEN.ARRGT.TANK TOP AFT.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quote Pricing Sheet

6933A220Q000005 Amendment 0002
ATTACHMENT 1 - QUOTE PRICING SHEET
T.S. KENNEDY - FY20 DRYDOCK REPAIRS
ITEMDESCRIPTION OF SERVICESQuantityUnitMOD 00001MOD 00002MOD 00003Final Award AmountPriceExtended Price
0100SECTION 100: GENERAL SERVICES REQUIREMENTS
0101APPLICABILITY OF RULES AND REGULATION
0102ACCURACY OF INFORMATION
0103SECURITY1JOBERROR:#VALUE!$ - 0
0104FIRE PROTECTION AND SAFETY1JOBERROR:#VALUE!$ - 0
0105OFFICE AND ADMINISTRATIVE SERVICES1JOB$ (17,674.00)ERROR:#VALUE!$ - 0
0106WHARFAGE1JOBERROR:#VALUE!$ - 0
0107SURVEYS AND INSPECTIONS
0108ON-SITE CONTRACTOR'S REPRESENTATIVE
0109DOCUMENTATION OF OPENINGS, BLANKS AND PLUGS1JOBERROR:#VALUE!$ - 0
0110ALLOWANCE FOR SCRAP MATERIAL1JOBERROR:#VALUE!$ - 0
0111MAINTAIN SHIP'S LIGHTING1JOBERROR:#VALUE!$ - 0
0112HAZARDOUS MATERIALS IDENTIFICATION AND DISPOSAL (See MCL.H-2 Supplemental Work Requests)
0113USE OF SHIP'S PARTS AND EQUIPMENT
0114PROVIDE SHORE POWER - ELECTRICAL CONSUMPTION- @ $________per KWH1JOBERROR:#VALUE!$ - 0
0114-1PROVIDE SERVICE TO CONNECT1JOBERROR:#VALUE!$ - 0
0114-2PROVIDE SERVICE TO REMOVE1JOB$ (3,000.00)ERROR:#VALUE!$ - 0
0115DISABLE CO2 AND HALON SYSTEMS.1JOBERROR:#VALUE!$ - 0
0116MAINTAINING SHIP'S CLEANLINESS1JOBERROR:#VALUE!$ - 0
0117MAINTAIN CLEAN BILGES AND DRAIN WELLS1JOBERROR:#VALUE!$ - 0
0118PROTECTIVE FLOOR COVERING1JOBERROR:#VALUE!$ - 0
0119SURFACE PREPARATION AND PAINTING/COATING GUIDELINE
0120SAFE FOR ENTRY AND SAFE FOR HOT WORK CERTIFICATES1JOBERROR:#VALUE!$ - 0
0121PRODUCTION REPORTING1JOBERROR:#VALUE!$ - 0
0122CRANE SERVICE1JOB$ (30,800.00)ERROR:#VALUE!$ - 0
0123STAGING$ - 0
0124OIL BOOM1JOBERROR:#VALUE!$ - 0
0125WELDING / BRAZING PROCEDURES
0126SOUNDINGS1JOBERROR:#VALUE!$ - 0
0127SANITARY SYSTEM1JOBERROR:#VALUE!$ - 0
0128WASTE WATER AND OILS1JOBERROR:#VALUE!$ - 0
0129SHORE STEAM1JOB$ (10,500.00)ERROR:#VALUE!$ - 0
0130PORTABLE TOILETS/TEMPORARY FACILITIES1JOB$ (11,447.20)ERROR:#VALUE!$ - 0
0200SECTION 200: DRYDOCKING REQUIREMENTS
0201DRY DOCK SHIP1JOBERROR:#VALUE!$ - 0
0202TAILSHAFT EXAMINATION1JOBERROR:#VALUE!$ - 0
0202-01OPTION - TAILSHAFT EXAMINATION - SHAFT WITHDRAWAL1JOB$ (55,136.00)ERROR:#VALUE!$ - 0
0203OPEN AND INSPECT LINE SHAFT BEARINGS1JOBERROR:#VALUE!$ - 0
0204RUDDER PINTLE CLEARANCES1JOBERROR:#VALUE!$ - 0
0205RUDDER TEST1JOBERROR:#VALUE!$ - 0
0206SEA CHESTS1JOBERROR:#VALUE!$ - 0
0207SEA VALVES1JOBERROR:#VALUE!$ - 0
0208BLASTING & COATING OF HULL1JOB$ - 0ERROR:#VALUE!$ - 0
0209ULTRASONIC THICKNESS GAUGINGS1JOBERROR:#VALUE!$ - 0
0210PROPELLER CLEANING AND INSPECTION1JOB$ (3,021.00)ERROR:#VALUE!$ - 0
0211INTERNAL STRUCTURAL EXAMS AND TESTING OF IFO 180 FUEL TANKS.$ - 0
0211-1FO Settler Port Capacity, 736 bbl, Fames 119-1281JOB$ 21,880.00$ 2,800.00$ 13,874.00$ 30,371.00$ - 0
0211-2FO settler Stbd Capacity, 736 bbls Location frames 119-1281JOB$ 21,880.00$ 2,800.00$ 13,874.00$ 31,085.00$ - 0
0211-3Aux Machinery Rm Day tank Capacity 100 bbls Location frames 117-1191JOB$ 1,820.00$ 2,500.00$ 6,989.00$ 7,210.00$ - 0
0211-4DB 3 Inbd Port Capacity 580. bbls Location frames 66-921JOB$ 14,780.00$ 2,800.00$ 12,464.00$ 31,136.00$ - 0
0211-5DB 3 Inbd Stbd Capacity 598 bbls Location frames 66-921JOB$ 14,780.00$ 2,850.00$ 12,464.00$ 31,431.00$ - 0
0211-6DB 3 Outbd Port Capacity 802 bbls Location frames 66-921JOB$ 14,780.00$ 2,900.00$ 13,524.00$ 25,267.00$ - 0
0211-7DB 3 Outbd Stbd Capacity 802 bbls Location frames 66-921JOB$ 14,780.00$ 2,900.00$ 13,524.00$ 25,666.00$ - 0
0211-8DB 4 Outbd Port Capacity 1198 bbls Location frames 92-1191JOB$ 6,180.00$ 3,100.00$ 14,630.00$ 40,375.00$ - 0
0211-9DB 4 Outbd Stbd Capacity 1198 bbls Location frames 92-1191JOB$ 6,180.00$ 3,100.00$ 13,766.00$ 32,243.00$ - 0
0211-10DB 5 Fwd Ctr (slops - remove and dispose) Capacity 496 bbls Location frames 120-1291JOB$ 2,820.00$ 2,600.00$ 15,392.00$ 20,828.00$ - 0
0211-11DB 5 Fwd Port Capacity 394 bbls Location frames 119-1291JOB$ 4,420.00$ 2,400.00$ 10,771.00$ 23,711.00$ - 0
0211-12DB 5 Fwd Stbd Capacity 394 bbls Location frames 119-1291JOB$ 4,420.00$ 2,400.00$ 10,771.00$ 24,341.00$ - 0
0211-13Deep Tank II Fwd Capacity 1430 bbls Location frames 22-331JOB$ 13,565.00$ 3,300.00$ 13,524.00$ 24,111.00$ - 0
0211-14Deep tank II Aft Capacity 1716 bbls Location frames 33-421JOB$ 5,615.00$ 3,750.00$ 10,433.00$ 18,776.00$ - 0
0211-15Deep Tank V Port Capacity 1134 bbls Location frames 171-1871JOB$ 8,494.00$ 3,500.00$ 14,786.00$ 45,425.00$ - 0
0211-16Deep Tank V Stbd Capacity 980 bbls Location frames 171-1871JOB$ 8,003.00$ 3,000.00$ 14,786.00$ 39,641.00$ - 0
0212INTERNAL STRUCTURAL EXAMS OF SALT WATER BALLAST TANKS$ - 0
0212-1Forepeak (fresh water), Capacity 150 stem-141JOB$ 10,480.00$ 2,500.00$ 5,894.00$ 3,007.00$ - 0
0212-2DB 2 Port Capacity 101 Location 42-461JOB$ 7,140.00$ 2,500.00$ 5,602.00$ 2,816.00$ - 0
0212-3DB 2 Stbd Capacity 101 Location 42-461JOB$ 7,140.00$ 2,500.00$ 5,077.00$ 5,803.00$ - 0
0212-4DB 6 Port Capacity 189 Location 140-1711JOB$ 10,720.00$ 2,500.00$ 7,154.00$ 9,868.00$ - 0
0212-5DB 6 Stbd Capacity 190 Location 140-1711JOB$ 10,720.00$ 2,500.00$ 7,177.00$ 9,950.00$ - 0
0212-6Aftpeak (freshwater) Capacity 196 Location 196-2121JOB$ 7,140.00$ 2,500.00$ 5,602.00$ 2,496.00$ - 0
0212-7Double Bottom #4 Port, Location 92-119, mud balast open for coupon inspection only1JOB$ 2,160.00$ 2,500.00$ 619.00$ 629.00$ - 0
0212-8Double Bottom #4 Port, Location 92-119, mud balast open for coupon inspection only1JOB$ 2,160.00$ 2,500.00$ 619.00$ 511.00$ - 0
0213INTERNAL STRUCTURAL EXAMS OF FEED WATER TANKS
0213-1DB 5 aft ctr Capacity 65 Location 130-1391JOB$ 4,060.00$ 15,000.00$ 5,963.00$ 5,605.00$ - 0
0213-2DB 5 aft Port Capacity 43 Location 130-1391JOB$ 6,330.00$ 15,000.00$ 5,438.00$ 3,964.00$ - 0
0213-3DB 5 Aft Stbd Capacity 36 Location 130-1391JOB$ 6,330.00$ 15,000.00$ 5,531.00$ 4,102.00$ - 0
0213-4Distilled Water Stbd Capacity 11 Location 140-1711JOB$ 3,050.00$ 15,000.00$ 5,660.00$ 3,964.00$ - 0
0213-5Distilled Water Port Capacity 11 Location 110-1221JOB$ 3,050.00$ 15,000.00$ 5,660.00$ 3,964.00$ - 0
0214INTERNAL STRUCTURAL EXAMS OF POTABLE WATER TANKS
0214-1Potable Stbd (upper 'tween deck) Capacity 40 Location 119-1251JOB$ 2,640.00$ 2,500.00$ 5,613.00$ 3,832.00$ - 0
0214-2Deep Tank III Port Capacity 308 Location 140-1571JOB$ 3,500.00$ 2,500.00$ 9,940.00$ 6,975.00$ - 0
0214-3Deep Tank III Stbd Capacity 288 Location 140-1571JOB$ 3,500.00$ 2,500.00$ 9,920.00$ 6,988.00$ - 0
0214-4Deep Tank IV Port (sewage modification tank) Capacity 162 Location 158-1711JOB$ 6,780.00$ 2,500.00$ 7,198.00$ 5,060.00$ - 0
0214-5Deep Tank IV Stbd (sewage ank modification) Capacity 147 Location 158-1711JOB$ 6,780.00$ 2,500.00$ 6,982.00$ 4,941.00$ - 0
0214-6AMR Sewage lift station, Capacity 1550 gallons, Location frame 100-1101JOB$ 1,040.00$ 2,500.00$ 2,667.00$ 2,964.00$ - 0
0214-7Engine room Sewage lift station, Capacity 500 gallons, Location frame 130-1321JOB$ 1,040.00$ 2,500.00$ 2,667.00$ 2,964.00$ - 0
0214-8#6 hold Sewage lift station, Capacity 600 gallons, Location frame 172-1751JOB$ 1,040.00$ 2,500.00$ 2,667.00$ 2,964.00$ - 0
0215INTERNAL STRUCTURAL EXAMS OF VOIDS AND COFFERDAMS
0215-1FWD Engine room Cofferdam Location 119-1201JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-2Mid Engine room cofferdam Location 129-1301JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-3ECHO Sounding Void Space Location 66-681JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-4Shaft Alley Void Space Port (cofferdam) Location 157-1581JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-5Aft Engine Room Cofferdam Location 134-1401JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-6Shaft Alley Void Space STBD Location 157-1581JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-7Shaft Alley void space STBD- cofferdam Location 171-1721JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-8Shaft Alley Void Space Port – cofferdam Location 171-1721JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-9Aft Void Space Location 187-1961JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-10Pipe Tunnel, Location 42 to 1321JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-11DP Tank IV Port cofferdam Location 158-1711JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-12DP Tank IV Stbd cofferdam Location 158-1711JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-13DP Tank III Stbd cofferdam Location 140-1571JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0215-14DP Tank III Port cofferdam Location 140-1571JOB$ 1,810.00$ 2,400.00$ 2,361.00$ 1,653.00$ - 0
0216INTERNAL STRUCTURAL EXAMS AND TESTING OF DIESEL OIL TANKS
0216-1AMR Diesel Tank(gallons) Capacity 985 Location 106-1071JOB$ 1,920.00$ 3,000.00$ 12,009.00$ 2,762.00$ - 0
0216-2EDG Diesel Tank Capacity 878 Location 112-1141JOB$ 1,920.00$ 3,000.00$ 12,009.00$ 2,762.00$ - 0
0217INTERNAL STRUCTURAL EXAMS AND TESTING OF AMR SLUDGE TANK
0217-1AMR Sludge Tank Capacity 405 Location 114-1161JOB$ 1,980.00$ 3,250.00$ 6,030.00$ 2,762.00$ - 0
0218FATHOMETER TRUNKS AND SPEED LOG1JOB$ - 0ERROR:#VALUE!$ - 0
0219ANCHOR CHAINS & LOCKERS1JOBERROR:#VALUE!$ - 0
0220ZINC ANODES1JOBERROR:#VALUE!$ - 0
0221CATHODIC PROTECTION SYSTEM1JOBERROR:#VALUE!$ - 0
0222BOW THRUSTER1JOBERROR:#VALUE!$ - 0
0223BILGE COATINGS1JOB$ - 0ERROR:#VALUE!$ - 0
0224MUD BALLAST INSPECTION1JOBERROR:#VALUE!$ - 0
0225RIVETS1JOB$ (15,554.00)ERROR:#VALUE!$ - 0
300SECTION 300: REPAIR ITEMS
0301CROP AND RENEW MICISELANIOUS PIPING AND STRUCTURE IN THE ENGINE ROOM1JOBERROR:#REF!$ - 0
0302CROP AND RENEW MICISELANIOUS SECTIONS OF CAP RAIL, BULWARKS AND MINOR STEEL STRUCTURE ON THE WEATHERDECKS1JOBERROR:#REF!$ - 0
0303CROP AND RENEW VARIOUS OVERBOARD HULL CONNECTIONS INCLUDING THE PIPE, FLANGE AND GUSSETS.1JOBERROR:#REF!$ - 0
0304INSTALL NEW DOPPLER SPEED LOG, CONTRACTOR FURNISHED FURUNO, MODEL: DS-801JOBERROR:#REF!$ - 0
0305PIPING RENEWALS- SEA CHEST VENTS1JOBERROR:#REF!$ - 0
0306REPAIR OR REPLACE NAV LAB AC VENT PORT SIDE OF NAV LAB1JOBERROR:#REF!$ - 0
0307OVERHAUL WARPING WINCH1JOBERROR:#REF!$ - 0
0308CANCELED ITEMERROR:#REF!
0309STEEL RENEWALS- AFTER PEAK TANK AND STEERING GEAR FLAT1JOBERROR:#REF!$ - 0
0310STEEL RENEWALS- PORT SEA CHEST FRAME 129-1301JOBERROR:#REF!$ - 0
0311STEEL RENEWALS, ENGINE ROOM FWD COFFERDAM AND TANK TOP1JOBERROR:#REF!$ - 0
0312STEEL RENEWALS, FORE PEAK TANK AND CHAIN LOCKER1JOBERROR:#REF!$ - 0
0400SECTION 400: OPTIONAL AND UNIT PRICED ITEMS
0401OPTION - MOVE SHIP FROM PILOT STATION AND PLACE IN DRY DOCK1JOBERROR:#VALUE!$ - 0
0402OPTION - SHIFT TO WET LAYBERTH FOLLOWING DRY DOCKING1JOBERROR:#VALUE!$ - 0
0403OPTION - PROVIDE WET LAY BERTH10DAYERROR:#VALUE!$ - 0
0404OPTION - SUPPLEMENTAL LABOR1200HRSERROR:#VALUE!$ - 0
0405OPTION - SUPPLEMENTAL MATERIAL1EA$ (195,090.00)ERROR:#VALUE!$ 80,000.00$ 80,000.00
0406OPTION - SUPPLEMENTAL STEEL$ 84,000.00$ (104,299.99)$ (20,299.99)
0406-1KTR Provide A Quote for Estimated 5,000 lbs of Flat Steel5000LBS$ 319,763.73$ (25,039.40)ERROR:#VALUE!$ - 0
0406-2KTR Provide A Quote for Estimated 2,000 lbs of Rolled Steel2000LBS$ - 0
0406-3KTR provide a quotation to weld 20 rivets.20EA$ (48,348.77)ERROR:#VALUE!$ - 0
0406-4KTR provide a quotation to renew 60 rivets.60EA$ (30,000.00)ERROR:#VALUE!$ - 0
0406-5KTR provide a quotation to prep and re-weld external hull weld seams, of an estimated length of 100 feet of weld.100FT$ (5,000.00)ERROR:#VALUE!$ - 0
0407OPTION - BOW THRUSTER REFURBISHMENT1JOB$ (262,800.00)ERROR:#VALUE!$ - 0
0408OPTION - ULTRASONIC GAUGINGS ADDITIONAL500EA$ (8,000.00)ERROR:#VALUE!$ - 0
0409OPTION - SWITCHBOARDS, LOAD CENTERS/POWER PANELS; CLEAN, INSPECT AND REPAIR1JOB$ (140,963.73)ERROR:#VALUE!$ - 0
0410OPTION - REPLACE RUBBER SCUPPER EXTENSIONS1JOB$ (1,000.00)ERROR:#VALUE!$ - 0
0411OPTION - CROP AND RENEW HAND RAILS, STANCHIONS AND SEA-RAILS$ - 0
0411-1Top Railing (1-1/4” pipe)1JOBERROR:#VALUE!$ - 0
0411-2Middle and Bottom railing (3/4” pipe)”1JOBERROR:#VALUE!$ - 0
0411-3Sea-Rail (1-1/4” pipe)1JOBERROR:#VALUE!$ - 0
0412OPTION - CROP AND RENEW FOUNDATIONS, STANTIONS AND PIPE STOOLS$ - 0
0412-01Pipe stools between 1” and 5”150EAERROR:#VALUE!$ - 0
0412-02Stanchions (2”x2” up to 4”x4”x 12” long) angle iron40EAERROR:#VALUE!$ - 0
0412-03Foundations (4”x4” up to 6”x6”x 12” long)20EAERROR:#VALUE!$ - 0
0413OPTION - ASBESTOS ABATEMENT, MAIN FEED WATER TO THE ECONIMIZER ON BOTH BOILERS AND REINSULATION1JOB$ (13,200.00)ERROR:#VALUE!$ - 0
0414OPTION - REPLACE SALT WATER FLUSHING PIPING LISTED ON THE ATTACHED REFRENCES WITH CuNi1JOBERROR:#VALUE!$ - 0
0415OPTION - TANK VENT OVERHAUL1JOB$ (3,320.00)ERROR:#VALUE!$ - 0
0416OPTION - REPAIR FIBREGLASS SHOWER PANS IN RATE ROOMS1JOB$ - 0
0417OPTION - HYDROTORQUE HINGE INSTALLATION4EA$ - 0
0418OPTION - OVERHAUL TWO (2) SHIPS SERVICE TURBINE GENERATOR GLAND SEAL REGULATORS1JOB$ - 0
0419OPTION - FORE PEAK TANK PRESERVATION1JOBERROR:#VALUE!$ - 0
0420OPTION - AFTER PEAK TANK PRESERVATION1JOB$ - 0
Total$ 302,357.00$ 204,550.00-$619,097.86$4,286,841.35$ 80,000.00
$ (2,300.00)ERROR:#VALUE!
$ (19,110.00)ERROR:#VALUE!
$ (13,500.00)ERROR:#VALUE!

File details come from the government source that posted it. Updated .