Quote_Pricing_Sheet.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
T. S. KENNEDY FY19 Annual Lifeboat Service and Repair
Solicitation number
6933A219Q000026
Issued by

About this file

Attachment #1 - Quote Pricing Sheet

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Abstract

QUOTE PRICING SHEET-ATTACHMENT 1
6933A219Q000026 T.S. KENNEDY - Life Boat Annual Service and Repair
ITEMDESCRIPTION OF SERVICESQuantityUnitUnitPriceAmount
Life Boat Annual service and Fassmer fall renewal
0001ANNUAL THOROUGH EXAMINATION

Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COTR.

Provide the services of a technician qualified in accordance with SOLAS MSC.1/Circ.1277 to work on Fassmer, Umoe Schatt-Harding and Ned Deck equipment to perform the below on the listed davits in accordance with the attached Satatement of work:1LO
0001aLifeboat #1- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001bLifeboat #2- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001cLifeboat #3- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001dLifeboat #4- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001eLifeboat #5- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001fLifeboat #6- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001gLifeboat #7- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001hLifeboat #8- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001iFast rescue boat and davit- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001jLife Raft Davit #1- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001kLife Raft Davit #2- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001lLife Raft Davit #3- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0001mLife Raft Davit #4- Contractor is to provide labor, material and a technical expert to conduct the annual thorough examination in accordance with the above references to the satisfaction of the regulatory authorities and the COR using the specification listed below and as defined in the associated technical manuals.1EA$ - 0
0002Contractor to replace the Main shaft and bearings, seals and rear-end bearing on Rescue Boat water jet propulsion unit. Alamarin-Jet's AJ 230, Serial # 301451.1JOB$ - 0
0003GEAR BOX CLEANING, FLUSH AND OIL RENEWAL WITH AN OEM RECOMMENDED ENVIRONMENTALLY ACCEPTABLE LUBRICANT (EAL).-Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system in accordance with the attached Satatement of work. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets). To provide consistency with other EAL installed on the ship the contractor should provide Terresolve Technologies products when available.1LOT
0003aLifeboat Davit #1- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003bLifeboat Davit #2- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003cLifeboat Davit #3- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003dLifeboat Davit #4- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003eLifeboat Davit #5- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003fLifeboat Davit #6- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003gLifeboat Davit #7- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003hLifeboat Davit #8- Remove and/or secure, as necessary, the lifeboats/rescue boats listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003iFast rescue boat and davit- Remove and/or secure, as necessary, the Fast rescue boat listed below in order to conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003jLife Raft Davit #1- Conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003kLife Raft Davit #2- Conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003lLife Raft Davit #3- Conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0003mLife Raft Davit #4- Conduct the oil change on each of the gear boxes associated with the launching and retrieval system. The gear box shall be thoroughly cleaned, and flushed of any residual oil and refilled with an environmentally acceptable lubricant (EAL) approved by the COR and acceptable to the OEM. (Certification from the OEM is required for compatibility with seals and gaskets).1EA$ - 0
0004Supplemental expenses are not specifically expected, however it is requested that a stabilized labor rate be provided applicable to any emergent work related to this statement of work. For pricing purposes, the bidder shall provide a stabilized rate, with extended pricing, for a total of 40 man-hours of supplemental labor. This funding, if required, shall be tasked by the COR via a Change Order. No other party but the COR or CO (Contracting Officer) may task changes or supplementals.40HR$ - 0
0005Supplemental Material- Supplemental expenses are not specifically expected, however it is requested that the bidder make allowance for up to $15,000 in supplemental material charges, with NO BURDEN. Invoices for these materials shall be provided to the COR upon request. This funding, if required, will be tasked by the COTR via Change Order. No other party but the COR or CO (Contracting Officer) may task changes or supplementals.1EA$ 15,000.00$ 15,000.00
Total$ 15,000.00

File details come from the government source that posted it.