Text version

Pricing Abstract

6933A218Q000019
Price Quote Sheet - Attachment 1
T.S. KENNEDY - FY18 ABS Cargo Gear Repairs and Inspection
ITEMDESCRIPTION OF SERVICESQTYUnitUnit PriceAmount
0100SECTION 100: GENERAL SERVICES REQUIREMENTS
0101APPLICABILITY OF RULES AND REGULATION1NSP
0102ACCURACY OF INFORMATION1NSP
0103FIRE PROTECTION AND SAFETY1NSP
0104SURVEYS AND INSPECTIONS1NSP
0105ON-SITE CONTRACTOR'S REPRESENTATIVE1NSP
0106HAZARDOUS MATERIALS IDENTIFICATION AND DISPOSAL1NSP
0107USE OF SHIP'S PARTS AND EQUIPMENT1NSP
0108MAINTAINING SHIP'S CLEANLINESS1NSP
0109SURFACE PREPARATION AND PAINTING/COATING GUIDELINE1NSP
0110SAFE FOR ENTRY AND SAFE FOR HOT WORK CERTIFICATES1NSP
0111PRODUCTION REPORTING1NSP
0112CRANE SERVICE1NSP
0113STAGING1NSP
0114WELDING / BRAZING PROCEDURES1NSP
0115PORTABLE TOILETS/TEMPORARY FACILITIES1NSP
0200SECTION 200: WORK REQUIREMENTS
0201ABS CARGO GEAR 5 YEAR INSPECTION1LOT$0.00
0201aCARGO RUNNERS NUMBER 1 HATCH2EA$0.00
0201bCARGO RUNNERS NUMBER 2 HATCH2EA$0.00
0201cTOPPING LIFTS NUMBER 1 HATCH2EA$0.00
0201dTOPPING LIFTS NUMBER 2 HATCH2EA$0.00
0201eVANG WIRES PURCHASE 1 HATCH2EA$0.00
0201fVANG WIRES PURCHASE 2 HATCH2EA$0.00
0201gSCHOONER VANG NUMBER 1 HATCH1EA$0.00
0201hSCHOONER VANG NUMBER 2 HATCH1EA$0.00
0201iCARGO FALL – LEAD AT BOOM HEEL4EA$0.00
0201jCARGO FALL LEAD BLOCK ON BOOM USED AS UPPER BURTONING BLOCK4EA$0.00
0201kBURTIONING BLOCK –LOWER 5-TONS2EA$0.00
0201lTOPPING LIFT AT BOOM4EA$0.00
0201mTOPPING LIFT AT KING POST4EA$0.00
0201nTOPPING LIFT LEAD AT KING POST4EA$0.00
0201oVANG BLOCK –UPPER(attached to wire pendant)4EA$0.00
0201pVANG BLOCK –LOWER (VANG POST #1 HOLD)2EA$0.00
0201qVANG BLOCK –LOWER (#2 HOLD) integrated with fair lead thru pin2EA$0.00
0201rVANG BLOCK- VANG POST 2 HOLD FWD (fair lead to winch)2EA$0.00
0201sVANG BLOCK- VANG POST 1 HOLD FWD (fair lead to winch)2EA$0.00
0201tSCOONER VANG BLOCK BETWEEN BOOMS2EA$0.00
0201uSCOONER VANG BLOCK BETWEEN BOOMS2EA$0.00
0201vSCOONER LEAD BLOCK ON BOOM2EA$0.00
0201wSCOONER LEAD BLOCK ON KING POST2EA$0.00
0201xCONDUCT re-Certification Weight Test1EA$0.00
0202MAINTENANCE, REPAIR AND LOAD TESTING OF THE SHIPS AFT STORES CRANE
0202-1Provide the services of a qualified EBI service technician to perform an inspection of the ships after stores.1EA$0.00
0202-2Remove and overhaul the main and auxiliary winch assemblies1EA$0.00
0202-3Remove and replace the main and auxiliary hoist wire ropes1EA$0.00
0202-4Remove and replace all of the hydraulic hoses with new hydrostatic tested hoses (tags shall be affixed to the hoses).1EA$0.00
0202-5Install/replace the operators hydraulic control system with a new electrical/electronic joy stick control system on T. S. Kennedy stores Crane S/N TC 4040735191EA$0.00
0202-6Replace the control manifold and control cables that are not replaced as part of the conversion to joy stick control.1EA$0.00
0202-7Conduct a certification inspection (including a slew ring deflection “rocking” test and an NDT inspection of the slew ring mounting bolt NDT inspection. (50% of the bolts are to be removed and inspected))1EA$0.00
0202-8Conduct a complete system flush and oil change using EAL from Terresolve as recommended by the manufacture. Change all filters and wipe the oil sump clean prior to the flush1EA$0.00
0202-9Conduct a certification inspection and weight test.1EA$0.00
0203OPTION - SUPPLEMENTAL MATERIAL Supplemental expenses are not specifically expected; however, it is requested that the bidder make allowance for up to $60,000 in supplemental material charges, with NO BURDEN. Invoices for these materials shall be provided to the COR upon request. This funding, if required, will be tasked by the COR via Change Order. No other party but the COR or CO (Contracting Officer) may task changes or supplementals.

REFERENCES

None.1EA$ 60,000.00$60,000.00
0204OPTION - SUPPLEMENTAL LABOR - Supplemental expenses are not specifically expected; however, it is requested that a stabilized labor rate be provided applicable to any emergent work related to this statement of work. For pricing purposes, the bidder shall provide a stabilized rate, with extended pricing, for a total of 250 man-hours of supplemental labor. This funding, if required, shall be tasked by the COR via a Change Order. No other party but the COR or CO (Contracting Officer) may task changes or supplementals.250HR$0.00
Total$60,000.00