T. S. KENNEDY - ABS 5-year Cargo Gear Repairs and Inspection
Solicitation number
6933A218Q000019
Issued by

About this file

Amendment 0002 - Potential Questions from Offerors

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

6933A218Q000019 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NORFOLK VA 23505-1204

BUILDING 19 SUITE 300

MARAD-00092

7737 HAMPTON BLVD

MAR-3802

ATLANTIC DIV ACQUISITION OFFICE

U S DOT MARITIME ADMINISTRATION

NORFOLK VA 23505-1204

BUILDING 19 SUITE 300

MARAD-00092

7737 HAMPTON BLVD

MAR-380-2

ATLANTIC ACQUISITION OFFICE

US DOT MARITIME ADMINISTRATION

08/09/20180002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/25/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of the Amendment to this RFQ is to address questions from potential offerors.

Period of Performance: 09/10/2018 to 01/04/2019

In order for an invoice to be processed for payment, it must include your Federal ID

Number, Purchase Order Number, and Invoice Number. Without these numbers, your invoice will be returned and payment will be delayed.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Monique Leake

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation 6933A218Q000019 T.S. KENNEDY – ABS 5-Yr Cargo Gear Repairs & Inspection and OEM Certification of Ship AFT Cargo Crane

Amend 0002

QUESTIONS AND ANSWERS

QUESTION ANSWER

Pg 12 of the SOW - states that it is the Contractor’s obligation to provide written notification in the Bid Package of conflicts with the spec or dwgs. On other previous contracts, MarAd has stated that any qualifications to, or caveats submitted with, a Bid Package may disqualify a Contractor’s bid. Please clarify.

The intent of this section is to allow this question and answer dialogue prior to the submission of the Contractors final pricing. This and the acknowledgement by all bidders that they have reviewed all amendments in the bid package.

Pg 14, Schedule Requirements - states that the Contractor does not have to submit a Gantt or CPM Schedule until after award. Pg 29, Progress meetings and Pg 29, SOW states the CPM is required with the offer. Please clarify.

The Contractor need not submit as part of their bid package the complete Gantt or CPM schedule, this will be required prior to the start of any work, and shall clearly demonstrate that the contractor has the resources and technical ability to complete the intent of the SOW.

Pg 20, CPM Schedule - requires the Time-Scaled Logic Diagram, Network Report, and the Schedule Report to be submitted by the Contractor. Please verify that these are required after the award.

Yes, they will be required after award.

Pg 20 requires the Gantt Chart must be in MS Project format. Pg 29, Progress Meetings state Microsoft Project 2010 or equal. The Offeror uses Turbo Project.

Please clarify the requirement.

The GOV’t used MS Project, if the Contractor uses a different program in shall have the ability to export ALL information into MS Project. The shall include all sub tasks, resources, special tools, Subcontractors, and etc.

Pg 22, Contractor’s Obligation - states that all power, water, lighting are to the Contractor’s account. Please verify that the Academy will be providing no services including lighting during this contract.

Water and 120v/1p/60hz power will be available from the ship, all other power shall be provided by the Contractor.

Pg 30, Coating Guideline SOW – requires the Contractor to warrantee the coating system for 5 years from defects of material or workmanship. The Contractor

The warrantee is for defects of material or workmanship and shall be in accordance with the manufactures warrantee, the determination shall be IAW with SPCC

Certification of Ship AFT Cargo Crane

Amend 0002 has no control over the planned maintenance performed, or the use of, the cargo blocks to be rebuilt. What is the criteria for determining that the paint system or its application has failed?

standard used in the application and the manufactures application instructions.

Pg 31, Safe for Entry - requires the Contractor to submit OSHA Form 73. Is that after award?

Yes, Form OSHA 73, “Designation of Competent Person.” Shall be provided after award.

Pg 34, Staging – will the Contractor be able to place an articulating manlift on the cargo hatch, properly protected with dunnage to distribute the load, as done previously?

Yes, but the Contractor may need to remove the man-lift when not in use. The contractor will need to ensure that any equipment meet and is qualified for the proposed use.

Pg 36, Abstract – states the intent of the inspection is to include components of the cargo gear for the 5 year inspection.

Section B 201 has line items for the runners and the blocks, but not for the winches. Are the winches part of this contract?

The Contractor should bid to complete the intent. All other information is provided to give the contractor the best information available to perform the intent. MarAd is intending to contract a specialist who by virtue of their experiences and qualifications has the ability to perform the intent of this SOW.

The Contractor should bid with the intent of providing all services required to complete a 5 year ABS cargo gear inspection.

Pg 37, SOW – states that a credit may be given if a wire rope is inspected, tested, and determined to be reusable. What test will be performed on the existing wire rope, by who, and when will that test be accomplished, as the specification states that removal of the wire ropes is the very first step? The pricing does not have a line item for initial testing of all the wire ropes (and respective blocks) prior to their removal. Is pull testing of the existing wire ropes after removal to be included in the Contractor’s pricing for each wire’s line item? Is the intent of the credit, and therefore the individual wire

Initial test and recommendations shall be completed by the Contractor and provided to the Contracting Officer, COR and ABS. If any recommendations on the actual inspections required are accepted by the Contracting Officer any credits due shall be negotiated using an earned value based on the actual level of effort the contractor has expended.

Certification of Ship AFT Cargo Crane

Amend 0002 rope pricing, to include all shipping, handling, unpacking, and other related costs?

Pg 37, Tagging – are the tags to be permanent tags on each component, and if so, what type and grade of material is desired, and how does MarAd want them affixed?

The tags shall be made from a non-ferrous material and affixed by a method acceptable to the COR.

Pg 37, Heel Pins – historically, these pins are extremely difficult to remove and may require days of the large crane service and heating of the housing. Is the intent that the Offeror has to price the effort accordingly, and that a CFR will not be allowed for work “above and beyond the norm” for these pins?

The Contractor needs to bid the intent of the SOW, if a specific contractor has historical data that implies a specific risk they should bid accordingly. A Deliver Order will not be issued to perform an item that is clearly part of the intent of this

SOW.

Pg 39, Block Credit - states that a credit may be given if a block is inspected, tested, and determined to be reusable.

What test will be performed on the blocks, by who, and when will that inspection/test be accomplished? The pricing does not have a line item for initial testing of all the blocks prior to their removal from the ship. The concern here is at what point do you want the price to reflect a creditable cost, prior to removal, or after removal but before disassembly? Since the entire effort related to a block is one line item cost, then the credit should take place prior to any effort to remove it. Please clarify the credit application.

Initial test and recommendations shall be completed by the Contractor and provided to the Contracting Officer, COR and ABS.

If any recommendations on the actual inspections required are accepted by the Contracting Officer any credits due shall be negotiated using an earned value based on the actual level of effort the contractor has expended.

Pg 39, Cargo Boom Weight Test – will the Government provide their weights for the testing?

The Ship has 3-ea of Water Weights 5-ton weights for use by the contractor (when not in use by the ship) the Contractor is responsible for all other weights. The Contractor is not guaranteed the weights will be available at the time the requested, but will be

Certification of Ship AFT Cargo Crane

Amend 0002 available within 4 working days of the requested date. No compensation will be provided for delays associated with the GOVT water weights.

Pg 40, Aft Crane – what is a Certification Inspection for this crane?

Certification shall be by the OEM for the service installed, ABS will issue a statement of fact bases on the work conducted in this SOW.

Pg 40, Hyd Hoses – what material should be used for the new hydraulic hose fittings, and should they be wrapped with Denso Tape upon installation and inspection?

All hoses shall be replaced in like kind as approved by the OEM.

Pg 40, Aft Crane Weight Test – what is the test weight required since the wire ropes are to be replaced?

The Aft Crane Weight Test shall be IAW the ABS requirements (the crane be tested to its full capacity. At 125%, that would be 50,000#)

Pg 38, Supplemental Manhours – Work items 203 and 204 discuss 120 manhours of Supplemental Labor. Section B states

60. Please clarify.

The Contractor shall bid 250 man-hours of Supplemental Labor, IAW the SOW

Gen’l – When reaving the new wire rope onto the cargo wire blocks, should the Contractor reave the wire IAW the drawings provided, or with the manner in which the wires are currently reaved?

The wires shall be reaved in the manner in which the wires are currently reaved.

Gen’l – will the Contractor be allowed to have a trailer and Storage Box on the pier, and utilize the pier electricity connections nearby for power?

Yes

Gen’l – will the Contractor be required to provide an individual sheet denoting the pertinent measurements and findings on each block?

Yes

Gen’l – there is no mention of the pendants in this contract. Are they not going to be replaced?

No

Certification of Ship AFT Cargo Crane

Amend 0002

Gen’l – during the one ton dynamic test, can the starboard side tests drop to the pier versus the water? Yes

Gen’l – please verify that the special pins, square head bolts, bushings,swivel eyes, bushings, bearings, and related block components will be replaced as per a

CFR.

If repair parts are required, the will be provided by GFM or by the issuance of a negotiated delivery order.