6933A217Q00028 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NORFOLK VA 23505-1204
BUILDING 19 SUITE 300
MARAD-00092
7737 HAMPTON BLVD
MAR-3802
ATLANTIC DIV ACQUISITION OFFICE
U S DOT MARITIME ADMINISTRATION
NORFOLK VA 23505-1204
BUILDING 19 SUITE 300
MARAD-00092
7737 HAMPTON BLVD
MAR-380-2
ATLANTIC ACQUISITION OFFICE
US DOT MARITIME ADMINISTRATION
08/08/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/08/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to address questions from potential offerors and to note that this requirement is Subject to Availability of Funds and FAR Clause 52.232-18, Availability of Funds applies.
52.232-18 Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government¿s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6933A217Q00028/000001 writing by the Contracting Officer.
(End of clause)
In order for an invoice to be processed for payment, it must include your Federal ID Number, Purchase Order Number, and Invoice Number.
Without these numbers, your invoice will be returned and payment will be delayed.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
6933A217Q00028-00001 JRRF – Purchase and Delivery of Tug (Push) Boat
QUESTIONS RESPONSES
The specifications call for “DRAFT” at 5’6” – 6’. Is the intent to have the molded depth of hull to be deeper [7-8ft] to allow for an acceptable freeboard or is this to be considered the molded depth?
The draft cited in the specification is typical of this type of vessel. A draft of 7’ – 8’ is acceptable to accommodate individual designs.
The 60 day delivery time may be an issue due to availability of major equipment [MDE’s generator]. How will this be handled?
The 60-day “estimated” delivery date is just that, an estimate. In accordance with Quotation Submission Instructions (page 30) of the RFQ, Potential Offerors are required to submit their estimated delivery date for the boat.
If the vessel is to comply with Subchapter M standards, will the vessel, at anytime, be pushing an oil or fuel barge?
It is not planned at this point.
Can ½” plate be installed on the headlog in lieu of the 7/16” plate as listed?
Yes
Can plate framing be used instead of angles so long as the minimum strength requirements per Subchapter M are met?
Yes
Can the frame spacing as specified be altered so that all frames spaces on bottom, sides and deck are the same?
Yes, if the 18” spacing is used.
The Twin Disc gear model MG 5061 is not listed by the manufacturer as having a 3.82:1 ratio. An MG 5091 gear does have that ratio.
Will the MG 5091 be suitable to install?
The specifications allow “similar suitable transmissions” and the MG 5091 is acceptable.
The two power train engines are specified as being U.S. manufactured, will the one generator be required to be U.S. manufactured as well?
Yes, unless the bidder can demonstrate the lack of a suitable source of American made products.
6933A217Q00028-00001 JRRF – Purchase and Delivery of Tug (Push) Boat
Deck Hardware section; RUBRAILS, states 6” x 8.2 channel welded down the sides 4” below deck line
Then Additional Construction Information states; The boat shall have rubber bumper pads fitted around perimeter of hull …
1. How does the CHANNEL rubrails relate to the Rubber Bumpers? Welded on top of the channel or above or below the channel?
2. Rubber bumpers; are they to be solid push pad type or laminated cut tire type?
1. It was envisioned that the (rubber bumpers) rub rails would lie inside the channel and is meant to provide the dimensions expected.
2. The bumpers may be either solid or cut as described, as long as, the design is suitable for this type of service.