This document contains questions and answers regarding a solicitation for support services for operations and maintenance of two federal laboratories. The Federal Aviation Administration is seeking proposals for a firm-fixed price contract with other direct cost contract line items to provide staffing and support for the NextGen Pavement Materials Laboratory and Advanced Materials Research Laboratory. The contract would have a one-year base period and four one-year options. Key details include that the incumbent contract is anticipated to transition within 30 days, labor categories include a laboratory manager and technicians billing up to 1880 hours per year, and subject matter experts may be required on an as-needed basis. Indirect rates but not fees should be included in the pricing sheet. The proposal due date is per the solicitation instructions.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for SIR 692M15-20-R-00012
As of: Wednesday June 3, 2021 (Questions #3-#14)
Refer to attachment entitled, “3June2021_Question and Answers for 692M15-20-R- 00012,” For Question and Answer #1 and #2.
# SIR Section: SIR Page
Number(s):
Question:
Question #3 Q&A published
6/3/21
1 When will the current contract DTFACT-15-D-00007 Task Order 0007 end?
Answer #3 RESPONSE The transition of this proposed contract is addressed in Section C.7.D of the
SIR. The FAA anticipates the transition will be 30 days.
Question #4 C.3
REQUIREMENTS
3 When would the FAA anticipate the award and start date of the new contract?
Answer #4 RESPONSE At this time, the FAA cannot provide an anticipated award and start date of the new contract.
Question #5 C.4 LABOR
REQUIREMENTS
6 For pricing purposes, does the FAA anticipate 1880 hours (full-time) of each
Labor Category (e.g., Materials Laboratory Manager, CELT1, CELT2, and
CELT3)?
Answer #5 RESPONSE Yes, they are full time employees.
Question #6 C.4.1 *KEY
PERSONNEL
6 For the Key Personnel – Materials Laboratory Manager, do the years of experience only count for post-graduate and -P.E.?
Answer #6 RESPONSE Years of experience is based on area(s) of work in which a person is has specific experience on projects of similar size, scope and complexity; and specific experience related to engineering experience in testing of asphalt, concrete, aggregate, and soils, in an AASHTO accredited laboratory.
Question #7 C.4 LABOR
REQUIREMENTS
6 Does the contractor need to include the unloaded &/or loaded hourly rates of the Materials Laboratory Manager, CELT1, CELT2, and CELT3 anywhere in the cost proposal?
Answer #7 RESPONSE It is not required of the Offerors to provide rates, however cost and pricing data may be requested. Please see Section L.9.6 Additional Cost/Price Data.
Question #8 C.3
REQUIREMENTS
3 Does the FAA require the contractor to have a local office presence?
Answer #8 RESPONSE See Section C.13.2 Place of Performance. There is no requirement for the contractor to have a local office presence.
Question #9 C.8.7 SME 10 Should the contractor include the rates of SME(s) in the cost proposal?
Answer #9 RESPONSE SME’s will be required on an as needed basis through the ODC CLIN. When a requirement arises post-award a rate may be requested in addition to the resume.
Question #10 C.6 Administrative
Support &
Documentation/ C.7
Contractor
Responsibilities
Can the FAA confirm that all estimated labor costs needed to perform the administrative support, documentation & clerical requirements in SIR
Sections C.6 & C.7 should also be included in the “Unit Price” per labor
CLIN for each year in the Pricing Schedule?
Answer #10 RESPONSE Yes, these cost elements should be included in the unit price.
Question #11 Attachment 1
Section B_Pricing
Schedule
Can the FAA confirm the Indirect Rates tab on the pricing schedule should only list indirect cost pool rates utilized in the pricing, (e.g., Overhead, G&A…), not also the profit/fee rate?
Answer #11 RESPONSE That is correct. The Indirect Rates tab is for the allowable ODCs only, and profit and fee should not be applied.
Question #12 Attachment 1
Section B_Pricing
Schedule
Please clarify that cell A2 in the Pricing Schedule tabs should read “Offeror
Name” not “Offer Name”.
Answer #12 RESPONSE That is correct.
Question #13 Attachment 1 The green cells in Col. B under “Rate” in the Indirect Rates tab on the
Section B_Pricing
Schedule pricing schedule are locked with cell format as dollars; can the FAA please revise the cell format to percentages.
Answer #13 This correction has been made. The new version has been posted entitled, “692M15-20-R-00012_Section B_Pricing Schedule FINAL V2”.
Question #14 Attachment 1
Section B_Pricing
Schedule
In the CLIN Summary tab of the pricing schedule, can the FAA please correct the green cell B2 to allow data entry.
Answer #14 This correction has been made. The new version has been posted entitled, “692M15-20-R-00012_Section B_Pricing Schedule FINAL V2”.